Construction law — project owners and contractors
Construction law lawyer in Paris: works, warranties and expert assessment.
Construction law revolves around acceptance of the works: before it, the works contract governs; after it, the one-year completion warranty, the two-year equipment warranty and the ten-year liability apply. As a construction law lawyer in Paris, the firm identifies the applicable regime at the first exchange and handles urgent applications for an expert assessment and actions on the merits before the Paris judicial court (tribunal judiciaire).
The ten-year period is mandatory by law: only a writ of summons stops it. Serious defects? Send the works contract, the acceptance report and the photos without delay.
Construction law · Paris
Get a first analysis
Before or after acceptance, the speed of analysis shapes the rest of the case. Send the works contract, the acceptance report and the photos: the firm replies within 24 to 48 business hours with the appropriate procedural route.
24 à 48 h
first legal
review
Kohen Avocats, Paris 17
Construction law: what really decides the case
Real estate law · Paris 17th arrondissement
What a construction law lawyer in Paris does
- Paris Bar
- Real estate law
- Firm in Paris 17th
Lawyer at the Paris Bar — real estate law and construction law.
Before acceptance, the project owner acts on the contract: late-completion penalties, formal notice, and termination for the contractor's fault in the event of abandonment of the works. After acceptance, the one-year completion warranty, the two-year equipment warranty (for separable equipment) and the ten-year liability (ten years, Article 1792 of the French Civil Code) apply. The building-damage insurer must state its position within 60 days and make an offer within 90 days, failing which interest at double the legal rate applies. The urgent application for an expert assessment structures the case.
Send what you have, even if incomplete: the firm will prioritise and complete the file with you. In an emergency, call +33 6 46 60 58 22.
Official profile in the directory of French lawyers (CNB)Firm at 11 rue Margueritte, 75017 Paris
Acceptance, the dividing line
The act by which the project owner accepts the work, with or without snags noted: it starts the three statutory warranties and determines the limitation period, the evidence and the insurer to be called in.
Liability by operation of law
Article 1792 of the Civil Code dispenses with proof of fault: it is enough to establish the defect and its ten-year nature — impairment of structural soundness or unfitness for its purpose.
The court-appointed expert assessment, a decisive tool
Ordered in urgent application proceedings under Article 145 of the Code of Civil Procedure, it fixes, on an adversarial basis, the defects, their causes, the responsibilities and the cost of repairs. The expert's terms of reference are drafted strategically.
The regime
Before or after acceptance: two legal worlds
Four rules structure construction litigation.
- Before acceptance, the relationship is contractual: works contract, late-completion penalties that may be adjusted (Article 1231-5 of the Civil Code), termination for the contractor's fault after formal notice and a record of default.
- Acceptance, express or tacit, starts the warranties: full payment for a lot and taking possession of it give rise to a presumption of tacit acceptance (Cass. 3e civ., 30 January 2019, No. 18-10.197).
- After acceptance: one-year completion warranty (Article 1792-6), two-year equipment warranty (Article 1792-3), ten-year liability (Article 1792) — liability by operation of law, with no fault to prove.
- Progressive defects fall within the ten-year liability only if it is found that they are of a nature to compromise the soundness of the work or to render it unfit for its purpose before the ten-year warranty period expires (Cass. 3e civ., 4 November 2010, No. 09-70.235).
The firm's practice: formalise an acceptance report, even with snags noted — an equivocal intention to accept the works deprives the project owner of this anchor point (Cass. 3e civ., 1 April 2021, No. 20-14.975) — then combine the urgent application for an expert assessment with a writ of summons on the merits, so as to structure the defence from the outset.
Your documents
What to send, depending on your situation
Each document has its own evidentiary value in construction litigation.
Position A
Project owner
- Works contract (CCMI, private contract or off-plan sale, VEFA), schedule, service orders
- Site meeting minutes and acceptance report
- Dated photos of the defects, bailiff's reports, repair quotes
- Warning letters to contractors and insurers
Position B
Contractor
- Ten-year liability insurance certificates
- General terms of the construction contract
- Declared subcontracting, with insured subcontractors
- Retention of payment as a guarantee, mutual guarantee
Common mistakes: signing acceptance without snags noted when defects are visible; not dating photos; relying on emails without registered letters.
The firm also follows the insurance chain:
- Building-damage insurer
- Ten-year liability insurer
- Technical inspection body
- Architect and project management
The method
How the firm supports you
Identifying the regime commits the whole case: time limits, parties to be summoned, insurers to be brought in.
Step 1
First exchange and sending your documents
By phone or email, send the works contract, the acceptance report, the insurers' letters, the photos and quotes. First review within 24 to 48 hours.
Step 2
Legal characterisation of the defects
Contractual regime, one-year completion warranty, two-year equipment warranty or ten-year liability; determination of the time limits; identification of the builders and insurers to be brought into the case.
Step 3
Urgent application for an expert assessment and formal notices
Writ of summons in urgent application proceedings for an expert assessment under Article 145 of the Code of Civil Procedure, formal notices to builders and insurers, and the double-legal-rate penalty if the building-damage insurer exceeds its time limits.
Step 4
Action on the merits before the judicial court
Writ of summons in solidum against builders and insurers, pleading on the expert assessment and the quantum, coordination of subrogated claims.
This page summarises the construction topic: the pages on acceptance of the works, construction defects, ten-year builder's liability, building expert assessment and building-damage insurance examine each regime in more detail.
The timetable
The timeline of a building project and its warranties
The typical stages, from the contract to the ten-year time bar.
Signing the contract
Day 0. Checking the insurance certificates of all participants; taking out building-damage insurance before the site opens.
During the works
Service orders, minutes, handling of variations, late-completion penalties, dealing with incidents: abandonment, default.
Acceptance
End of the works. Joint inspection, report with or without snags noted. Starting point of the three statutory warranties and of building-damage cover.
Acceptance + 1 year
One-year completion warranty: repair of defects noted at acceptance or notified within the year; failing that, performance at the contractor's cost and risk after formal notice.
Acceptance + 2 years
Two-year warranty of good working order of separable equipment: shutters, taps, boiler.
Acceptance + 10 years
Ten-year liability (Article 1792), then time bar: Article 1792-4-1 discharges builders after ten years. Only a writ of summons effectively interrupts the period.
The checks
What the firm checks before acting
No proceedings before these points have been validated.
- Applicable regime: defects arising before or after acceptance, characterisation under Article 1792 or the completion warranty.
- Precise date of acceptance, express or tacit: the starting point of all time limits.
- Characterisation of the defect: impairment of structural soundness or unfitness for its purpose, foreseeable progression of defects that have not stabilised.
- Drafting the expert's terms of reference: defects listed, characterisation requested, causes, responsibilities, cost of repairs and loss of enjoyment.
- Building-damage insurer's time limits: position within 60 days, offer within 90 days, automatic increase to double the legal rate if exceeded (Article L. 242-1 of the Insurance Code).
- Strategy: formal notice, urgent application for an expert assessment, urgent application for an interim payment, action on the merits, coordination of building-damage and ten-year insurers.
Summary
Situation, evidence, time limit, action
The most frequent configurations at the firm, to quickly calibrate the priority and the procedural tool.
Situation
Late delivery without force majeure
Decisive evidence: Works contract, schedule, formal notice.
Time limit: During the works.
Useful action: Claim for late-completion penalties, formal notice to complete.
Situation
Prolonged abandonment of the works
Decisive evidence: Bailiff's report, formal notice left unanswered.
Time limit: After formal notice.
Useful action: Termination for the contractor's fault, completion at the contractor's cost and risk.
Situation
Defects revealed within the year following acceptance
Decisive evidence: Letter notifying the defects, dated photos, quotes.
Time limit: Within 1 year of acceptance.
Useful action: One-year completion warranty (Article 1792-6 of the Civil Code).
Situation
Defects impairing structural soundness or fitness for purpose
Decisive evidence: Expert report, technical findings.
Time limit: Within 10 years of acceptance.
Useful action: Ten-year liability (Article 1792 of the Civil Code), urgent application for an expert assessment.
Situation
Building-damage insurer refuses cover
Decisive evidence: Notice of refusal, preliminary report.
Time limit: As soon as possible.
Useful action: Formal notice invoking the double legal rate, urgent application for an expert assessment and action on the merits.
Situation
Builder in liquidation, building-damage insurance in force
Decisive evidence: Building-damage policy, proof of debt filed with the liquidator.
Time limit: During the ten-year cover.
Useful action: Calling on the building-damage insurer's pre-financing, subrogation of the insurer.
The firm's practical cases
Anonymised examples. The figures correspond to real cases, rounded for discretion.
The anonymised examples below illustrate the variety of situations handled. The figures correspond to real cases but have been rounded for discretion.
Compensation of €87,600 for ten-year liability and the L. 242-1 penalty
A Paris project owner discovers major water ingress in the façade three years after acceptance. Notice of loss by registered letter drafted by the firm, urgent application for an expert assessment under Article 145 of the Code of Civil Procedure, ten-year characterisation confirmed. The building-damage insurer exceeds the 90-day time limit by 47 days; formal notice invoking the double legal rate. Total compensation raised to €87,600, allocated entirely to the works.
Action: urgent application for an expert assessment, then the L. 242-1 paragraph 5 penalty. Result: compensation multiplied by 2.5.
Urgent application for an expert assessment granted, defects valued at €62,000
Project owner in an off-plan sale (VEFA) whose co-ownership reveals structural defects in the basement. Urgent application for an expert assessment brought before the Paris judicial court. The report concludes that the defects are of a ten-year nature and values the repairs at €62,000. Action on the merits brought in solidum against the developer, the general contractor and the technical inspection body.
Action: urgent application for an expert assessment and action in solidum. Result: ten-year characterisation and valuation secured.
Tacit acceptance upheld, project owner's claims dismissed (€75,000 disputed)
A private individual who claims to have refused acceptance seeks late-completion penalties and remedial works totalling €75,000. The firm, defending the contractor, shows that full payment of the invoices and taking possession establish tacit acceptance (Cass. 3e civ. 30 January 2019, No. 18-10.197). The court of appeal dismisses the project owner's claims.
Action: reliance on the presumption of tacit acceptance. Result: project owner's claims rejected.
Frequently asked questions
Your questions: construction law
Who is liable for a defect that appears after acceptance?
The liability regime depends on the nature of the defect. For defects and faulty workmanship noted at acceptance or within the following year, the one-year completion warranty of Article 1792-6 of the Civil Code applies. For separable items of equipment, the two-year warranty of good working order (1792-3) applies. For defects that compromise structural soundness or make the work unfit for its purpose, the ten-year liability of Article 1792 of the Civil Code applies.
Identifying the regime is decisive: it determines the limitation period, the nature of the evidence and the insurer to be called in. The firm's practice requires a precise characterisation as soon as the first defects appear, generally supported by an adversarial or court-appointed expert assessment. To go further, see the page on construction defects.
When does the ten-year liability begin?
The ten-year liability runs from acceptance of the works. Acceptance is the act by which the project owner declares that it accepts the work, with or without snags noted
(our translation). It may be express, by a joint report, or tacit if taking possession and payment show an unequivocal intention to accept the work.
The 3rd civil chamber held on 30 January 2019, No. 18-10.197, FS-P+B+I that completion of the whole of the work is not a condition for taking possession of a lot and for its acceptance
and that payment of the full cost of the works on a lot and its taking of possession by the project owner give rise to a presumption of tacit acceptance
(our translation). The starting point of the ten-year liability is therefore the date of acceptance, express or tacit. To go further, see the page on acceptance of the works.
Is an expert assessment always necessary?
An expert assessment is rarely mandatory but often decisive. Where there are technical defects, the legal characterisation depends on an analysis of causes, origin and extent that is for the expert. The amicable expert assessment, organised by the insurers, serves first to fix the insurer's position on cover. The court-appointed expert assessment, ordered in urgent application proceedings under Article 145 of the Code of Civil Procedure, is adversarial, binding on all parties and generally decisive for the proceedings on the merits.
The practical rule: seek a court-appointed expert assessment as soon as an insurer disputes cover, a contractor hides behind a subcontractor, or the project owner has to deal with several participants. To go further, see the page on building expert assessment.
Which insurance should I take out before building?
For the project owner, building-damage insurance is mandatory before the site opens (Article L. 242-1 of the Insurance Code). It pre-finances ten-year repairs without waiting for responsibilities to be determined. For builders, ten-year liability insurance is required of every participant in the building process. For the project manager, professional liability insurance is essential.
Checking the participants' insurance certificates determines the financial soundness of the project. A certificate may be required at signature of the contract, before the start of the works and at each annual renewal. The policy must specifically cover the project in progress and the nature of the works. To go further, see the page on building-damage insurance and the page on ten-year liability.
Is abandonment of the works penalised?
Yes. Abandonment of the works by the contractor exposes it to termination of the contract for its sole fault and to damages for the additional cost of completion. Evidence is built in three stages: formal notice to resume the works within a specified period, a bailiff's report of the abandonment, and an assessment of the financial consequences (completion quotes, loss of enjoyment, late-completion penalties).
Where the default continues, the project owner may, after formal notice, sue for termination and have the works completed by another contractor at the defaulting contractor's cost and risk. This route is burdensome but is justified when the contractor stalls or denies that the breaches occurred. For high-stakes projects, the urgent application for an interim payment may be paired with the urgent application for an expert assessment, so as to move forward in parallel on the merits and on the technical assessment.
Can late-completion penalties be cumulated?
The late-completion penalties provided for in the contract are due by operation of law if the contractual deadline is exceeded, unless a clause expressly makes them subject to prior formal notice. They apply without the need to show specific loss. The judge may adjust the amount if the penalty clause appears manifestly excessive or derisory
within the meaning of Article 1231-5 of the Civil Code (our translation).
Cumulation with other heads of compensation (loss of enjoyment, rehousing costs, additional credit costs) is possible if the contract does not prohibit it and the loss is distinct. In practice, negotiation focuses first on the formal validity of the notice and on the characterisation of the causes of delay (force majeure, fault of the project owner, changes to the plans). The firm advises contractors and project owners alike on this balance.
How can I take action against several builders?
The action is brought in solidum against all builders whose liability may be engaged, whether the general contractor, the subcontractor, the project manager or the design office. An in solidum judgment allows the project owner to turn to the party with the financial resources or to the soundest insurer. The apportionment between builders then takes place through claims between them.
The court-appointed expert assessment is generally the necessary step: it determines each party's share of responsibility. Before the trial judge, builders often seek to shift liability onto their subcontractor or to invoke a fault of the project owner. The rigour of the evidence file and the coordination of the writs of summons determine the effectiveness of the action. For Paris projects, the Paris judicial court is generally competent.
Which defects fall under the ten-year liability?
Article 1792 of the Civil Code covers damage that compromises the soundness of the work
or that, affecting it in one of its constituent or equipment elements, makes it unfit for its purpose
. The 3rd civil chamber held on 14 September 2023, No. 22-13.858, FS-B that the health risk to which the occupants of a building are exposed may, by its seriousness, alone make the building unfit for its purpose, even if it has not materialised within the probationary period
(our translation).
Case law also addresses progressive defects. The 3rd civil chamber held on 4 November 2010, No. 09-70.235, Bull that a court of appeal cannot apply ten-year liability to progressive defects without finding that they were of a nature to compromise the soundness of the work or to render it unfit for its purpose before the expiry of the ten-year warranty period
(our translation). Characterisation depends on the findings of the expert assessment.
Is tacit acceptance valid?
Yes, under strict conditions. Tacit acceptance requires an unequivocal intention
of the project owner to accept the work. The 3rd civil chamber held on 30 January 2019, No. 18-10.197, FS-P+B+I that payment of the full cost of the works on a lot and its taking of possession by the project owner give rise to a presumption of tacit acceptance
(our translation).
The presumption falls away where the project owner disputes the quality of the works. In its judgment of 1 April 2021, No. 20-14.975, FS-P, the 3rd civil chamber confirmed that the court of appeal, having held that the project owners' intention to accept the work, even with snags noted, was equivocal
, could deduce from this that there was no tacit acceptance (our translation). The firm's practice: prevent disputes by formalising an acceptance report, even with snags noted, which secures the time limits of the warranties.
Must the acceptance report always be signed?
No. Acceptance without snags noted amounts to a waiver of the right to rely on apparent defects. If defects or unfinished work are visible, the project owner must record them in the report by noting snags. Snags trigger the one-year completion warranty of Article 1792-6 of the Civil Code for one year from acceptance.
Where major defects prevent use of the work, the project owner may refuse acceptance or ask the court to appoint an expert before any acceptance. The practical rule: prepare a joint inspection, list in advance the points to check, refuse to sign if a defect makes the work unfit for its purpose, and record the snags precisely. To go further, see the page on acceptance of the works.
How much does construction litigation cost?
The cost depends on the complexity of the case, the number of builders involved and the phase. A court-appointed expert assessment generates expert fees (initial deposit generally €3,000 to €8,000, adjusted afterwards according to the work done) and lawyer's fees covering the submissions to the expert. The merits phase adds the cost of the writ of summons, written submissions and the hearing.
A project owner who succeeds may claim an order for costs and for irrecoverable costs under Article 700 of the Code of Civil Procedure. In high-stakes cases, the increase to double the legal rate under Article L. 242-1 of the Insurance Code often absorbs much of the cost of fees. At the start of a case, the firm sets out a fee framework covering the expert assessment and hearing phases.
Does ten-year liability apply to renovation works?
Ten-year liability applies to works that amount to a work
within the meaning of Article 1792 of the Civil Code. Case law has held that major renovation works, including alteration of the structure, laying of floors, conversion of attics or complete re-roofing, may constitute a work and benefit from ten-year liability.
Conversely, routine maintenance, limited repairs and cosmetic finishing work fall outside its scope. Characterisation depends on technical analysis: whether the works are incorporated into the structure, the extent of the materials used, the nature of the intervention. The court-appointed expert assessment is generally decisive on this point. The firm's practice is to characterise the works from the quote stage, to anticipate the applicable regime.
Which court hears a construction dispute in Paris?
The Paris judicial court is competent for construction disputes concerning a building located in Paris, on the basis of Article 44 of the Code of Civil Procedure (real property matters). For projects in the inner suburbs, the judicial courts of Bobigny (93), Créteil (94), Nanterre (92) or Versailles (78) may be competent depending on the municipality.
The Paris court of appeal hears appeals against judgments of the Paris judicial court and of the other judicial courts within its jurisdiction. The firm, located at 11 rue Margueritte 75017 Paris, regularly pleads before these courts and coordinates court-appointed expert assessments across the whole jurisdiction. Mastery of procedural rules and rigorous monitoring of time limits determine the outcome of the case.
Do I need a lawyer as soon as defects appear?
Not necessarily, but the advantage is clear where the stakes are serious. A lawyer helps avoid common mistakes: signing a report without suitable snags noted, notifying a loss by a simple email, waiting too long before characterising a defect legally, accepting a clearly insufficient compensation offer. Each mistake can cost key levers: warranty time limits, presumption of liability, burden of proof.
Early intervention protects time limits and structures the evidence file. The firm drafts formal notice letters, arranges bailiff's reports, initiates court-appointed expert assessments and then pleads on the merits. On high-stakes projects, the investment in fees upfront is generally recovered from the expert assessment onwards.
How is a construction case file prepared?
A solid file rests on four pillars. First, the contract: works contract, quotes, execution drawings, ten-year liability and building-damage insurance certificates. Next, the chronology: service orders, site meeting minutes, acceptance, letters noting snags. Then the technical evidence: dated photos, bailiff's reports, amicable expert reports, repair quotes. Finally, the financial chain: invoices, interim statements of work, proof of payment, retention of payment as a guarantee.
The firm's practice is to assemble this file as if it were to be brought before the judge from the first exchange. Initial rigour avoids later challenges from the insurer or the opposing party and makes it possible to quickly bring an urgent application for an expert assessment under Article 145 of the Code of Civil Procedure.
Sources and related pages
Official texts and related pages
The sources for this page and the firm's related areas of practice.
Further reading
Page updated on 11 June 2026.
Construction dispute? Book a call today.
Before or after acceptance, the speed of analysis shapes the rest of the case. Send the works contract, the acceptance report and the photos: the firm replies within 24 to 48 business hours with the appropriate procedural route.
The latest news.
What our clients say
Best real estate law and business law lawyer in Paris. A humane and attentive lawyer, with a wonderful team. Thank you, Maître KOHEN
Translated from French
Thank you to Maître KOHEN for his analyses of recent case law on fraudulent non-disclosure in property sales. It reassures me about an action for annulment that I am considering after buying a house affected by serious defects intentionally concealed by the seller and not reported by the estate agent; also defects (rising damp) characterised by spreading through-cracks and damp stains, not reported by the estate agent… Worse, defects concealed by the latter or at his instigation, under a coat of paint and by polystyrene tiles glued to the ceiling of a bedroom. And the said estate agent drafted the preliminary contract, which of course contains no information about any of these defects. Just to add that, being 77 years old and suffering from cognitive impairment, I am certain that the estate agent thought I would not be able to discover the deception and above all to establish the fraudulent intent, still less to bring legal proceedings given the complexity and length of the procedure... That is why I am opting for the criminal route, insofar as the intentional concealment of the defects by the seller and then by the estate agent amounts to the fraudulent manoeuvres of art. 313-1 of
Translated from French
Maître Reda KOHEN assisted me in a dispute concerning a sale agreement with a defaulting party. He provided professional and responsive support, and I highly recommend him.
Translated from French
I highly recommend Maître Reda Kohen. Thanks to his explanations, I was able to recover my security deposit in a situation that seemed blocked. He was responsive, clear, and very professional. A big thank you for his invaluable help!
Translated from French
Excellent support from Maître Kohen in a case combining business law and real estate law. Clear legal analysis from the first meeting, right through to the hearing. Professional and accessible lawyer, I highly recommend his firm in Paris 17.
Translated from French
Maître Kohen assisted me in recovering unpaid debts from a defaulting tenant. Procedure mastered from start to finish, from the payment order to eviction. Human, attentive, and always reachable. Thank you for your work.
Translated from French
As a young student living in an apartment, my landlord tried to make me leave my accommodation even though he had sent me no termination notice. I therefore contacted Mr. Reda Kohen to help me as I couldn’t handle the situation alone. In just 3 days everything was resolved, Maître Kohen defended me and accompanied me with an irreproachable level of commitment and efficiency. I can only recommend his professionalism!
Translated from French
I turned to Maître Kohen for a complex real estate dispute and I highly recommend his firm. He is very professional; he thoroughly analyzed my case from the very first appointment and clearly explained the possible options. Thanks to his expertise, we achieved a very favorable outcome. Responsive, a good teacher, and committed, he is a lawyer you can truly trust. Yours faithfully, Miss Maazaz
Translated from French
Very satisfied! I would like to thank Maître Esther Cornu here, who managed to resolve a very complicated dispute in a divorce and family law matter...Thanks to Maître Cornu, a judgment was handed down in my favour even though it was far from a foregone conclusion...So I recommend this law firm
Translated from French
A precise and concrete analysis and an immediate response. Excellent.
Translated from French
I highly recommend this lawyer for his professionalism, honesty, and transparency. He helped me successfully and guided me through the process with great care and expertise. What I particularly appreciated was his honest approach and the fact that he recommended practical, cost-effective options instead of immediately pushing for the most expensive solution. He genuinely focused on finding the right approach for my situation. I’m very grateful for his support and would definitely recommend him to anyone looking for a trustworthy and professional lawyer in France.
Thank you for this detailed, precise help, with a proposal at the end on whether or not to continue (very quick response as well)
Translated from French
Very good advice given by Maître Cornu during our meeting on 16 October.
Translated from French
Very professional and responsive service. The lawyer quickly and carefully checked the validity of my wife’s residence permit in light of a specific legal regime. His work gave us clarity, whereas the usual administrative procedures were long and ambiguous. I appreciated his efficiency and professionalism, and I recommend his services.
Translated from French
I would like to warmly thank Maître Esther Cornu for her professionalism, her availability and the quality of her support. In a case of particular importance for my professional future, she showed great responsiveness, rigour and a gift for explaining things, taking the time to answer my questions precisely and to explain the various legal steps to me. I particularly appreciate the clarity of her analyses, her seriousness and her commitment in following up my case. Many thanks to Maître Esther Cornu for listening and for her support. I highly recommend!
Translated from French
I was pleasantly surprised by the responsiveness of Mr Reda Cohen, who took the time to answer my questions about my case instantly. It has become so rare these days to find a lawyer who is so available, responsive and attentive, even when it is simply a matter of answering questions. His answers are clear, precise and reassuring. You can tell that he takes the time to understand the situation and to provide relevant answers. Beyond his excellent ratings on Google, it is above all this availability and this seriousness that make the difference. Many thanks to Mr Reda Cohen for his professionalism and his responsiveness. I highly recommend!
Translated from French
A huge thank you to Maître Esther Cornu from Kohen Avocats for her support during a particularly difficult time. Her attentiveness, empathy, and humanity touched me deeply. She was able to answer my questions with clarity and sensitivity, while demonstrating great professionalism and fully respecting the confidentiality of the case. Beyond her professional qualities, I met a deeply humane lawyer whose support made a real difference. I sincerely recommend her.
Translated from French
Good experience. And good work, thank you for everything.
Translated from French
Saw Hassan on the TV news
Translated from French
very clear article
Translated from French
Loading…
Your cookies
We use cookies to measure the effectiveness of our campaigns and improve the site. You can change your choice at any time.
