Construction defects — project owners and buyers
Construction defects lawyer in Paris: assessment, repair and compensation.
A construction defects lawyer in Paris starts by classifying the defect before any claim is issued. Ten-year liability, two-year warranty, one-year completion warranty or ordinary law: the answer determines the defendant, the time limit, the court and the evidence. The firm classifies the defect, has it assessed by an expert and pursues payment.
Each warranty has its own time limit: one year for the completion warranty, two years for the two-year warranty, ten years for the ten-year liability — all run from acceptance of the works. The classification is made before the first formal notice.
Construction defects · Paris
Get a first analysis
Project owner, buyer or contractor: the classification of the defect and the timetable decide the case. Send the contract, the acceptance report and the photos — reply within 24 to 48 business hours.
24 à 48 h
first legal
review
Kohen Avocats, Paris 17
Construction defects: what really decides the case
Real estate law · Paris 17th arrondissement
What a construction defects lawyer in Paris does
- Paris Bar
- Real estate law
- Firm in Paris 17th
Lawyer at the Paris Bar — construction defects, statutory warranties and expert assessment.
Three warranties apply after acceptance: the one-year completion warranty (garantie de parfait achèvement: defects noted at acceptance or notified, with the works carried out at the contractor's cost and risk after an unsuccessful formal notice), the two-year warranty (separable equipment) and the ten-year liability (structural soundness or unfitness for purpose, liability as of right). Compensation covers four heads of loss: repair works — costed by the expert, often indexed —, loss of enjoyment, related financial losses, and expert and procedural costs.
Send what you have, even if incomplete: the firm will prioritise and complete the file with you. In an emergency, call +33 6 46 60 58 22.
Official profile in the directory of French lawyers (CNB)Firm at 11 rue Margueritte, 75017 Paris
Classify before issuing proceedings
Compromised structural soundness or unfitness for purpose: ten-year liability (Article 1792). Failing separable equipment: two-year warranty (1792-3). Defect noted at acceptance or reported within the year: completion warranty (1792-6). Everything else: ordinary law.
Acceptance, the starting point
Express or tacit — taking possession and payment give rise to a presumption of it — acceptance triggers the three warranties and fixes every time limit.
Expert assessment, evidence that can be relied on against others
The urgent application under Article 145 of the Code of Civil Procedure establishes the defects, their causes and the costing, on an adversarial basis with all the parties involved and their insurers.
Classification
Four legal bases, four regimes
Four rules structure a construction defects claim.
- Ten-year liability (Article 1792 of the French Civil Code): liability as of right for defects that compromise structural soundness or make the building unfit for its purpose — no fault to prove.
- The two-year warranty (Article 1792-3) covers the proper functioning of separable equipment for two years; the completion warranty (Article 1792-6) covers for one year defects noted at acceptance or notified in writing.
- Acceptance — express or tacit — triggers everything: taking possession and payment give rise to a presumption of it (Cass. 3e civ., 18 April 2019, No. 18-13.734).
- The expert assessment under Article 145 of the Code of Civil Procedure establishes the evidence before any trial: defects, causes, responsibilities, costing.
The costing follows the principle of full compensation: repair works framed by quotes and the expert report — the judge often adopts the median figure, sometimes updated using the construction cost index —, loss of enjoyment, related losses and costs. Equipment that breaks down in extreme cold or heat can engage the installer's ten-year liability where the installation constitutes a building work (ouvrage) and the breakdown results from a construction defect (Cass. 3e civ., 12 November 2020, No. 19-18.213).
Your documents
What to send, depending on your situation
The acceptance report and the snags noted at acceptance determine the classification.
Position A
Project owner
- Works contract and accepted quotes
- Acceptance report and list of snags noted at acceptance
- Letters notifying the defects, dated photos
- Invoices and quotes for the remedial works
Position B
Buyer
- Notarial deed and mention of the ten-year warranties
- Builders' insurance certificates
- Technical expert report, if any
- Correspondence with the seller and the contractors
Frequent mistakes: the acceptance report or handwritten snags noted at acceptance not kept; the loss not declared to the building-damage insurer.
The firm also draws on:
- Building-damage insurance
- Ten-year liability insurers
- Bailiff's report
- Amicable adversarial expert assessment
The method
How the firm supports you
The right legal basis avoids a plea of inadmissibility; the expert assessment determines the amount of damages.
Step 1
First discussion and classification
Contract, acceptance report, snags, letters, photos: first review and choice of legal basis within 24 to 48 business hours.
Step 2
Report and preparation
Bailiff's report, amicable expert assessment where appropriate, identification of the builders and insurers, limitation timetable.
Step 3
Article 145 urgent application for an expert assessment
Writ of summons against all the parties involved, appointment of the expert, monitoring of the expert's operations, written submissions to the expert.
Step 4
Compensation
Settlement on the basis of the report or proceedings on the merits; joint and several (in solidum) orders against the builders and insurers, and monitoring of enforcement.
Parallel declaration to the building-damage insurer where the policy exists: pre-financing of the repairs without waiting for liability to be determined.
The timetable
The timeline of a construction defects claim
All time limits run from acceptance of the works.
Discovery
Day 0. Recording of the defect, dated photos, preservation of the evidence of when it appeared.
Formal notice
Day 15 to day 45. Joint inspection requested from the contractor, declaration to the building-damage insurer, bailiff's report.
Article 145 urgent application
Day 60 to day 120. Urgent application for an expert assessment against all the parties involved and their insurers.
Expert assessment
Months 3-12. Adversarial expert operations, classification of the defect, costing of the repairs, written submissions.
After the report
Settlement or proceedings on the merits; judgment and joint and several (in solidum) orders.
Limits of the warranties
One year for the completion warranty, two years for the two-year warranty, ten years for the ten-year liability — from acceptance, express or tacit.
The checks
What the firm checks before acting
No claim is issued without these points having been checked.
- Date of acceptance, express or tacit, and the time remaining for each warranty.
- Classification: ten-year liability, two-year warranty, completion warranty or contractual liability.
- Whether the defect was apparent or latent on the day of acceptance, and the snags noted.
- Full identification of the builders and their insurers.
- Amount: multiple quotes, adversarial report, loss of enjoyment and related losses.
- Declaration to the building-damage insurer and coordination with the pre-financing.
Summary
Situation, evidence, time limit, action
The most frequent configurations at the firm, to quickly set the priority and the procedural tool.
Situation
Roof leaks two years after acceptance
Decisive evidence: Bailiff's report, dated photos, technical certificate, quote for the remedial works.
Time limit: Before the ten-year period under Article 1792-4-1 expires.
Useful action: Article 145 CPC urgent application for an expert assessment, then a claim on the merits under the ten-year liability.
Situation
Roller shutters failing after one year
Decisive evidence: Letters notifying the defect, replacement quote, expert certificate.
Time limit: 2 years from acceptance (Article 1792-3).
Useful action: Proper-functioning warranty claim against the contractor.
Situation
Snags noted at acceptance not remedied
Decisive evidence: Acceptance report with snags noted, unsuccessful formal notices.
Time limit: 1 year from acceptance (Article 1792-6).
Useful action: Completion warranty, works carried out at the contractor's cost and risk.
Situation
No acceptance report
Decisive evidence: Proof of full payment, taking of possession, letters.
Time limit: 10 years from tacit acceptance.
Useful action: Action seeking a finding of presumed tacit acceptance, then a claim under the ten-year liability.
Situation
Contractor in judicial liquidation
Decisive evidence: Ten-year liability insurance certificate, works contract, proof of claim.
Time limit: 10 years from acceptance.
Useful action: Direct action against the ten-year liability insurer.
Situation
Structural cracks after 6 years
Decisive evidence: Engineering consultancy report, chronological photos, quote for the remedial works.
Time limit: 10 years from acceptance.
Useful action: Article 145 CPC urgent application against the builder, the architect and the insurers.
Practical cases from the firm
Anonymised examples. The figures correspond to real cases, rounded for discretion.
The anonymised examples below illustrate the range of situations handled. The figures correspond to real cases but have been rounded for discretion.
Project owner awarded €38,500 for remedying roof leaks
Detached house delivered four years earlier with a defective waterproofing membrane on the flat roof. Article 145 CPC urgent application for an expert assessment, expert appointed, report finding the roofer liable under the ten-year liability. Claim on the merits and order against the insurer to pay €38,500 for the works and €4,800 for loss of enjoyment.
Action: Article 145 CPC + ten-year liability. Result: project owner compensated, building repaired.
Tacit acceptance found, project owner's claim dismissed
Renovation of a Paris flat with no acceptance report. Project owner suing 9 years after completion and disputing the defects. The court finds tacit acceptance by taking possession and full payment of the balance. Claim held time-barred beyond the 10 years running from tacit acceptance.
Action: classification of acceptance. Result: contractor cleared of ten-year liability.
Court-appointed expert assessment ordered, settlement agreement at €22,000
New house with defects appearing after acceptance in the facade rendering. Article 145 CPC urgent application for an expert assessment, expert appointed with a full mission. On the expert's first conclusions, a settlement agreement was signed between the parties for €22,000, avoiding proceedings on the merits. Repairs carried out within six months.
Action: Article 145 urgent application + settlement. Result: prompt compensation without a trial.
Frequently asked questions
Your questions: construction defects
Which defects fall under the ten-year builder's liability?
The ten-year liability (garantie décennale) covers defects which, appearing after acceptance, compromise the structural soundness of the building or make it unfit for its purpose, in accordance with Article 1792 of the French Civil Code. Typical cases are roof or facade leaks that compromise habitability, structural cracks affecting the load-bearing structure, waterproofing defects in balconies and terraces, serious failures of geothermal heating or central air conditioning forming part of the building, and ground defects and differential settlement.
The case law applies the unfitness criterion strictly: a purely aesthetic or comfort-related defect is not enough. The Third Civil Chamber found this liability engaged for an undersized air-conditioning system that broke down in extreme cold or heat (Cass. 3e civ., 12 November 2020, No. 19-18.213, published in the Bulletin).
How long after acceptance can you bring a claim?
The time limit for bringing a claim against builders under the ten-year liability is ten years from acceptance of the works, under Article 1792-4-1 of the Civil Code. This period applies to defects falling under Articles 1792 and 1792-2.
For defects affecting separable items of equipment, the proper-functioning warranty under Article 1792-3 of the Civil Code runs for two years from acceptance. The completion warranty under Article 1792-6 is limited to one year. The starting point is the same for all: the date of acceptance, express or tacit.
Is a court-appointed expert assessment essential?
It almost always is where the defect is disputed, where its classification (ten-year, two-year, contractual) is open to debate or where the technical origin remains to be established. A court-appointed expert assessment provides an adversarial report that can be relied on against the other parties, on which the judge can base the decision.
The project owner can apply to the urgent applications judge under Article 145 of the Code of Civil Procedure, which provides that if there is a legitimate reason to preserve or establish, before any proceedings, the evidence of facts on which the outcome of a dispute may depend, legally admissible investigative measures may be ordered
(our translation). Where the measure concerns a building, the court of the place where it is situated has sole jurisdiction.
What can you do if the builder refuses to come and inspect the defects?
The builder's refusal to attend the site or to reply to letters is not an obstacle. The project owner must build the evidence by independent means: bailiff's report, dated photos, third-party statements, an amicable assessment by a technical control office, quotes for the remedial works.
Once these items are gathered, the lawyer applies for a court-appointed expert assessment by urgent application under Article 145 of the Code of Civil Procedure. The procedure leads to the appointment of an independent expert who will examine the defects on an adversarial basis, identify their causes and cost the remedial works. The report produced at the hearing on the merits largely determines the outcome of the dispute.
Does acceptance without snags noted mean losing all remedies?
No. Acceptance without snags noted cures only the defects that were apparent on the day of acceptance. Defects that were latent on that date and appear afterwards remain covered by the ten-year liability, by the two-year proper-functioning warranty or by ordinary contractual liability, depending on their nature.
Whether a defect was apparent or latent is assessed by reference to a reasonably diligent project owner, at the precise time of acceptance. Damage is apparent only if not just its visible manifestation but also its causes and consequences were foreseeable. This analysis is decisive in a dispute.
How do you prove tacit acceptance?
The Third Civil Chamber has laid down a clear rule: taking possession of the building and paying for the works give rise to a presumption of the project owner's unequivocal intention to accept it, with or without snags noted (Cass. 3e civ., 18 April 2019, No. 18-13.734, published in the Bulletin).
The Court of Cassation has also held that completion of the whole of the building is not a condition for taking possession of a unit and its acceptance
and that payment for all the works on a unit and its taking of possession by the project owner give rise to a presumption of tacit acceptance
(our translation) (Cass. 3e civ., 30 January 2019, No. 18-10.197, published in the Bulletin). Where taking possession and payment occur at different times, the date adopted is that of the last event.
Who pays for the court-appointed expert in an Article 145 urgent application?
The party requesting the assessment deposits with the court's cashier an advance intended to cover the expert's fees and expenses. This deposit is set by the order appointing the expert, generally between €1,500 and €5,000 for an ordinary construction case. The claimant may not be the one who ultimately bears the cost.
At the merits stage, the costs, of which the expert's fees form part, are in principle borne by the losing party. If the builder is ordered to pay, the builder reimburses the deposit to the claimant. The key is to argue the legitimate reason carefully at the application stage: without that, the measure may be refused and the deposit paid for nothing.
Can the project owner carry out the works at their own expense and be reimbursed?
The rule is that the owner should avoid carrying out the remedial works before the court-appointed expert assessment, save in a clearly established emergency. Altering the premises can compromise the identification of the causes, cause the evidence to disappear and weaken the proceedings. The builder will systematically resist payment, arguing that it was impossible to examine the defect on an adversarial basis.
If there is an emergency (active water damage, structural danger, danger to people), the project owner can have the state of the premises recorded by a bailiff before any intervention, keep the removed items and photograph everything. The completion warranty under Article 1792-6 of the Civil Code allows, after an unsuccessful formal notice, the works to be carried out at the builder's cost and risk.
Does building-damage insurance cover construction defects?
Building-damage insurance (dommages-ouvrage) pre-finances the repair of defects falling under the ten-year liability. It pays without first determining liability, which spares the project owner from waiting for the outcome of the dispute with the builder. The insurer then seeks recovery from the builder at fault and the builder's ten-year liability insurer.
Triggering the cover requires a loss declaration within the time limits. The insurer has 60 days to notify its position on cover, then 90 days to offer compensation. Failure to meet these time limits is heavily penalised. For more detail, see the building-damage insurance page.
What can you do if the contractor is in liquidation?
The contractor's liquidation does not prevent a claim under the ten-year liability. The project owner must file a claim with the creditors' representative within the statutory time limits, but the main action must be brought against the builder's ten-year liability insurer. This insurance is compulsory and remains available even if the company has disappeared.
The ten-year insurance policy, taken out when the works start, remains attached to the building for ten years. The loss declaration is made directly to the insurer, which cannot rely on the company's situation to refuse cover. The difficulty is often to identify the insurer when the company has ceased trading: the insurance certificate provided at the start of the works is a document that must be kept.
Is the architect jointly and severally liable?
An architect who has been given a design or works-supervision assignment is also subject to ten-year liability where the defects result from a fault in design, supervision or coordination. The architect is liable in solidum with the contractors who took part in carrying out the works, which allows the project owner to sue any one of the builders for the whole of the damage.
The allocation between the architect and the contractors is made through claims for contribution, according to each party's own faults. The Third Civil Chamber strictly applies joint and several liability where the defects compromise structural soundness or make the building unfit for its purpose, regardless of the precise share of each party involved.
How is loss of enjoyment calculated?
Loss of enjoyment corresponds to the total or partial deprivation of the normal use of the property. It is calculated in euros per month, in proportion to the rental value of the property and to the surface area or function actually lost. A main room made uninhabitable by leaks increases the calculation; an unusable balcony results in a lower amount.
The lawyer builds the calculation from several elements: affected surface area, period of unavailability, comparative rental value of equivalent properties, and photos and reports dating the appearance and persistence of the disturbance. The court-appointed expert generally confirms the reality of the disturbance, the final amount being a matter for the judge. For serious defects in a main residence, the usual ranges run from €200 to €1,200 per month depending on the seriousness and duration.
When does the ten-year limitation period start to run?
The ten-year period set by Article 1792-4-1 of the Civil Code runs from acceptance of the works. Acceptance is the act by which the project owner declares that they accept the building, with or without snags noted, under Article 1792-6 of the Civil Code.
Where there is no acceptance report, the judge looks for tacit acceptance, which requires an unequivocal intention to accept. Where taking possession and full payment occur at different times, the date adopted is that of the last event (Cass. 3e civ., 12 November 2020, No. 19-18.213, published in the Bulletin). The stakes are decisive: a case in which acceptance is not established can lose all the statutory warranties.
Can you settle before the court-appointed expert assessment?
Yes, and it is often desirable where liability is clear and the cost of the repairs is measured. A settlement agreement signed in accordance with Articles 2044 et seq. of the Civil Code has the force of res judicata between the parties and avoids the costs and delays of proceedings on the merits.
Negotiation is generally more effective when the defects have already been examined, either by an amicable expert or by a full bailiff's report. A premature settlement, signed without a technical study, exposes the project owner to later discoveries that are not covered. The lawyer drafts a settlement that precisely delimits the defects covered and expressly reserves future losses.
Which court has jurisdiction over construction defects in Paris?
The Paris judicial court (tribunal judiciaire) has jurisdiction over ten-year liability claims where the building is located in Paris. The territorial jurisdiction rule rests on the location of the building in real property matters, and on the defendant's domicile. For an urgent application for an expert assessment, where the measure concerns a building, Article 145 of the Code of Civil Procedure requires the court of the place where the building is located.
For sites in the inner suburbs, the judicial court of Bobigny, Créteil, Nanterre or Versailles may have jurisdiction depending on the municipality. The firm, located at 11 rue Margueritte 75017 Paris, regularly appears before all of these courts and coordinates court-appointed expert assessments throughout the jurisdiction of the Paris court of appeal.
Sources and related pages
Official texts and related pages
The sources for this page and the firm's related areas of practice.
Further reading
Page updated on 11 June 2026.
A construction defect to be repaired? Act today.
Project owner, buyer or contractor: the classification of the defect and the timetable decide the case. Send the contract, the acceptance report and the photos — reply within 24 to 48 business hours.
The latest news.
What our clients say
Best real estate law and business law lawyer in Paris. A humane and attentive lawyer, with a wonderful team. Thank you, Maître KOHEN
Translated from French
Thank you to Maître KOHEN for his analyses of recent case law on fraudulent non-disclosure in property sales. It reassures me about an action for annulment that I am considering after buying a house affected by serious defects intentionally concealed by the seller and not reported by the estate agent; also defects (rising damp) characterised by spreading through-cracks and damp stains, not reported by the estate agent… Worse, defects concealed by the latter or at his instigation, under a coat of paint and by polystyrene tiles glued to the ceiling of a bedroom. And the said estate agent drafted the preliminary contract, which of course contains no information about any of these defects. Just to add that, being 77 years old and suffering from cognitive impairment, I am certain that the estate agent thought I would not be able to discover the deception and above all to establish the fraudulent intent, still less to bring legal proceedings given the complexity and length of the procedure... That is why I am opting for the criminal route, insofar as the intentional concealment of the defects by the seller and then by the estate agent amounts to the fraudulent manoeuvres of art. 313-1 of
Translated from French
Maître Reda KOHEN assisted me in a dispute concerning a sale agreement with a defaulting party. He provided professional and responsive support, and I highly recommend him.
Translated from French
I highly recommend Maître Reda Kohen. Thanks to his explanations, I was able to recover my security deposit in a situation that seemed blocked. He was responsive, clear, and very professional. A big thank you for his invaluable help!
Translated from French
Excellent support from Maître Kohen in a case combining business law and real estate law. Clear legal analysis from the first meeting, right through to the hearing. Professional and accessible lawyer, I highly recommend his firm in Paris 17.
Translated from French
Maître Kohen assisted me in recovering unpaid debts from a defaulting tenant. Procedure mastered from start to finish, from the payment order to eviction. Human, attentive, and always reachable. Thank you for your work.
Translated from French
As a young student living in an apartment, my landlord tried to make me leave my accommodation even though he had sent me no termination notice. I therefore contacted Mr. Reda Kohen to help me as I couldn’t handle the situation alone. In just 3 days everything was resolved, Maître Kohen defended me and accompanied me with an irreproachable level of commitment and efficiency. I can only recommend his professionalism!
Translated from French
I turned to Maître Kohen for a complex real estate dispute and I highly recommend his firm. He is very professional; he thoroughly analyzed my case from the very first appointment and clearly explained the possible options. Thanks to his expertise, we achieved a very favorable outcome. Responsive, a good teacher, and committed, he is a lawyer you can truly trust. Yours faithfully, Miss Maazaz
Translated from French
Very satisfied! I would like to thank Maître Esther Cornu here, who managed to resolve a very complicated dispute in a divorce and family law matter...Thanks to Maître Cornu, a judgment was handed down in my favour even though it was far from a foregone conclusion...So I recommend this law firm
Translated from French
A precise and concrete analysis and an immediate response. Excellent.
Translated from French
I highly recommend this lawyer for his professionalism, honesty, and transparency. He helped me successfully and guided me through the process with great care and expertise. What I particularly appreciated was his honest approach and the fact that he recommended practical, cost-effective options instead of immediately pushing for the most expensive solution. He genuinely focused on finding the right approach for my situation. I’m very grateful for his support and would definitely recommend him to anyone looking for a trustworthy and professional lawyer in France.
Thank you for this detailed, precise help, with a proposal at the end on whether or not to continue (very quick response as well)
Translated from French
Very good advice given by Maître Cornu during our meeting on 16 October.
Translated from French
Very professional and responsive service. The lawyer quickly and carefully checked the validity of my wife’s residence permit in light of a specific legal regime. His work gave us clarity, whereas the usual administrative procedures were long and ambiguous. I appreciated his efficiency and professionalism, and I recommend his services.
Translated from French
I would like to warmly thank Maître Esther Cornu for her professionalism, her availability and the quality of her support. In a case of particular importance for my professional future, she showed great responsiveness, rigour and a gift for explaining things, taking the time to answer my questions precisely and to explain the various legal steps to me. I particularly appreciate the clarity of her analyses, her seriousness and her commitment in following up my case. Many thanks to Maître Esther Cornu for listening and for her support. I highly recommend!
Translated from French
I was pleasantly surprised by the responsiveness of Mr Reda Cohen, who took the time to answer my questions about my case instantly. It has become so rare these days to find a lawyer who is so available, responsive and attentive, even when it is simply a matter of answering questions. His answers are clear, precise and reassuring. You can tell that he takes the time to understand the situation and to provide relevant answers. Beyond his excellent ratings on Google, it is above all this availability and this seriousness that make the difference. Many thanks to Mr Reda Cohen for his professionalism and his responsiveness. I highly recommend!
Translated from French
A huge thank you to Maître Esther Cornu from Kohen Avocats for her support during a particularly difficult time. Her attentiveness, empathy, and humanity touched me deeply. She was able to answer my questions with clarity and sensitivity, while demonstrating great professionalism and fully respecting the confidentiality of the case. Beyond her professional qualities, I met a deeply humane lawyer whose support made a real difference. I sincerely recommend her.
Translated from French
Good experience. And good work, thank you for everything.
Translated from French
Saw Hassan on the TV news
Translated from French
very clear article
Translated from French
Loading…
Your cookies
We use cookies to measure the effectiveness of our campaigns and improve the site. You can change your choice at any time.