Project owner facing a contractor who no longer returns to site: evidence, replacement, insurance
Abandoned construction site lawyer in Paris: prove it, have the works finished, claim on insurance.
When the contractor has left the site, no longer answers or announces its liquidation, an abandoned construction site lawyer in Paris helps the project owner establish the exact state of the works, choose between enforced completion and replacement, then check which insurance can pay for what remains to be done.
Before entrusting the rest of the works to another contractor, have the state of the site recorded and send a complete formal notice: the report fixes the evidence of the extra cost, and the formal notice, unless it is excused because impossible or pointless, opens the way to completion by a third party and to building-damage insurance before acceptance.
Abandoned construction site · Paris
Get a first analysis
Send the quotation or signed contract, the invoices and payments on account, dated photographs, the exchanges with the contractor and the building-damage insurance certificate if there is one: the firm will examine the evidence of abandonment and the route to replacement.
24 à 48 h
first legal
review
Kohen Avocats, Paris 17
Abandoned site: prove it, replace the contractor, get covered
Construction · Paris 17th
What an abandoned construction site lawyer in Paris does
- Paris Bar
- Construction and building works
- Project owner
Reda Kohen, lawyer (avocat) at the Paris Bar, examines the position of project owners, whether individuals or companies, whose building contractor has stopped coming to the site before completion.
Three questions drive this type of case. What has been done, and how can it be proved against an absent contractor. On what conditions can another contractor take over the works at the first contractor's expense. Which insurance responds, when no acceptance of the works has yet taken place.
Article 1222 of the French Civil Code (Code civil) allows the creditor, after formal notice, to have the obligation performed itself, provided the time and cost remain reasonable. Article L. 242-1 of the Insurance Code (Code des assurances) opens building-damage insurance (dommages-ouvrage) before acceptance where the contract has been terminated for non-performance following a formal reminder that went unheeded. Both provisions require solid evidence and steps taken in the right order.
Send what you have, even if incomplete: the firm will prioritise and complete the file with you as a matter of urgency on +33 6 46 60 58 22.
Official profile in the directory of French lawyers (CNB)Firm at 11 rue Margueritte, 75017 Paris
Recording the state of the site
A dated report, drawn up if possible in the presence of the contractor, describes what has been done, what is missing and what has been done badly. It is then used for the final account.
Having someone else finish the works
After formal notice, the project owner may entrust the rest of the works to another contractor and claim the cost incurred, within the limits of a reasonable time and price.
Finding the insurer that pays
Before acceptance, building-damage insurance responds only on strict conditions and the contractor's ten-year liability cover remains, in principle, closed. The firm checks the policies before any claim is made.
The rules
Replacing the contractor and triggering insurance: the rules in play
Five rules govern the project owner's response when the contractor abandons the site before acceptance.
- The party whose counterparty fails to perform may demand specific performance, request a price reduction, terminate the contract or obtain damages, and combine those remedies that remain compatible (Article 1217 of the Civil Code). Enforced specific performance requires prior formal notice (Article 1221 of the Civil Code).
- Once formal notice has gone unheeded, the project owner may entrust the works to a third party, if the time and cost remain reasonable, and then be reimbursed, or have the contractor ordered to advance the funding for that performance (Article 1222 of the Civil Code). Only the destruction of what has been done requires the prior authorisation of the judge; the advance of funds is requested before the works, reimbursement afterwards.
- Termination by notification is done at the project owner's own risk: the formal notice must announce the termination, and the notification must then state the reasons for it (Article 1226 of the Civil Code). The Court of Cassation accepts that formal notice may be omitted where the circumstances make it pointless (Cass. com., 18 October 2023, No. 20-21.579).
- Before acceptance, building-damage insurance covers the repairs where the contractor, given formal notice without result, has its contract terminated for non-performance (Article L. 242-1 of the Insurance Code). It covers only damage of the ten-year liability kind, which excludes bringing the work into conformity with what the contract provided for (CA Versailles, 4th ch., 7 November 2022, No. 20/01629).
- Ten-year liability presupposes acceptance of the works, by agreement or by the court, pronounced in the presence of both parties (Article 1792-6 of the Civil Code). Without acceptance, the contractor's ten-year liability and its insurer's cover cannot be triggered (CA Paris, pole 4, ch. 5, 20 March 2024, No. 21/05972).
Abandonment is not acceptance. As long as the work has not been accepted, the case is handled on a contractual footing, and building-damage insurance steps in only after a formal notice that went unheeded, unless excused, and an effective termination of the contract.
Your documents
The documents to gather according to your objective
The same facts serve two distinct steps: quantifying what the contractor owes, and obtaining the insurer's cover.
Objective A
Have the works finished and claim the extra cost
- Quotations, contract, amendments, schedule and signed general conditions, with the agreed price and time
- Paid invoices, stage-payment requests and proof of payment of the payments on account
- Report by a commissaire de justice (court-appointed bailiff), dated photographs and site meeting minutes
- Formal notice with proof of receipt, then comparative quotations from the replacement contractor
Objective B
Obtain an insurer's cover
- Building-damage insurance contract and certificate, or proof that there is none
- Ten-year liability and public liability insurance certificate supplied by the contractor
- Letter terminating the contract and, in the event of insolvency proceedings, the judgment opening them and proof of what became of the contract
- Claim notification, the insurer's acknowledgement of receipt and any reply received
Do not let the new contractor demolish or rework the first contractor's work before it has been described: without an initial record, the extra cost and the defects become hard to prove.
The firm also handles:
- Court-appointed expert assessment
- Construction defects and snags
- Building works contracts
- Single-family house construction contract
The method
How the firm supports you
Record the position, give formal notice, organise the takeover, then address the claim to the right debtor.
Step 1
Reading the contract and dating the abandonment
The firm reviews the quotation, the general conditions and the exchanges, identifies the contractor's last visit and checks that no unpaid sum owed by the project owner justified suspending the works.
Step 2
Fixing the evidence of the state of the works
Depending on urgency, it recommends a report by a commissaire de justice with the contractor summoned to attend, or an expert assessment sought from the urgent applications judge before any proceedings.
Step 3
Giving formal notice in the proper form
The letter sets a reasonable time limit, lists the works expected and announces termination and the use of another contractor, so as to satisfy both the Civil Code and the Insurance Code.
Step 4
Organising the takeover and the claim
The firm prepares the termination, the claim notification, the application for an interim payment or for authorisation in urgent proceedings, and, if the contractor is in insolvency proceedings, the filing of the claim.
Before acceptance, a single well-drafted letter can serve three purposes: it gives formal notice within the meaning of the Civil Code, prepares the termination and meets the first condition of building-damage insurance before acceptance, which then requires termination of the contract.
The timetable
The timeline of an abandoned construction site
From the contractor's last visit to completion by a third party, the order of the steps matters as much as their content.
Works stop
From the first days. Note the date of the last visit, photograph the site and keep the messages and calls that went unanswered.
Report
Have a report drawn up of the state of progress and of the materials left on site, inviting the contractor to attend.
Formal notice
Send a registered letter that sets a reasonable time limit and announces termination of the contract and the use of another contractor.
Termination and claim notification
If the works do not resume, notify a reasoned termination and notify the claim to the building-damage insurer if a policy was taken out.
Court measure
If the matter is contested, seek an expert assessment or an interim payment in urgent proceedings before letting the new contractor alter the work.
Completion by a third party
Entrust the rest of the works to the chosen contractor, keep the quotations and invoices, then present the final account against the defaulting contractor or its liquidator.
The checks
What the firm checks before acting
A premature step can turn the situation against the project owner.
- Cause of the stoppage: genuine abandonment, or suspension linked to an unpaid stage payment or a late payment by the project owner.
- Acceptance: taking possession together with full or almost full payment, which would give rise to a presumption of tacit acceptance of the unfinished work, and the elements capable of rebutting that presumption.
- Formal notice: reasonable time limit, works listed, express mention of termination and proof of the date the letter was received.
- Insurance: whether building-damage insurance exists, the activities declared by the contractor, the exclusions in its public liability policy.
- The contractor's status: striking-off, reorganisation or liquidation, the appointed representative and the time limit for filing the claim.
Summary
Situation, evidence, response
Six common situations and the first priority each imposes on the project owner.
Situation
The tradesman no longer comes and no longer answers
Decisive evidence: Report by a commissaire de justice, dated photographs, unanswered messages.
Timing: Act before any other contractor works on the existing structures.
Useful action: Formal notice announcing termination and replacement, then reasoned termination.
Situation
A competitor can finish at once
Decisive evidence: Joint record of the state of the works, comparative quotations, formal notice that had no effect.
Timing: Reasonable time and cost within the meaning of Article 1222 of the Civil Code.
Useful action: Court application for an advance of funds before the works, or completion by the third party followed by a claim for reimbursement.
Situation
The contractor is in judicial liquidation
Decisive evidence: Opening judgment, its publication, state of the site on that date.
Timing: Filing of the claim within the statutory time limits, claim notification without waiting.
Useful action: Formal notice to the liquidator to take a position on the contract, admission of the claim in the liabilities, then building-damage insurance once the contract is terminated.
Situation
Building-damage insurance has been taken out
Decisive evidence: Policy, formal notice, effective termination of the contract, damage of the ten-year liability kind.
Timing: Notification period set by the policy, then the two-year limitation period of Article L. 114-1 of the Insurance Code.
Useful action: Complete claim notification, then checking the sixty-day and ninety-day time limits.
Situation
Single-family house construction
Decisive evidence: Contract, delivery guarantee certificate, delay or stoppage recorded.
Timing: The guarantor gives the builder formal notice, then acts fifteen days later.
Useful action: Approach the delivery guarantor, who designates the person responsible for finishing the works.
Situation
The premises were occupied despite being unfinished
Decisive evidence: Dates of moving in, payments made, written reservations.
Timing: Settle the position on acceptance quickly.
Useful action: Establish the absence of any intention to accept or, conversely, request acceptance with reservations.
Frequently asked questions
Your questions: abandoned construction site
Is a report by a commissaire de justice needed to prove that the site has been abandoned?
The law imposes no particular form, but a bailiff's report remains the most useful document. It fixes the date, the state of progress, the materials left on site and the absence of any crew at work. Photographs, messages and site meeting minutes then supplement it.
In a case decided at Montpellier, the bailiff (huissier de justice) had noted "the unfinished works, the existence of numerous defects and the absence of any worker on the site" (our translation) (CA Montpellier, 3rd civil ch., 30 January 2025, No. 20/03986). That report, followed by a formal notice and a notification of the use of another contractor, made it possible to build the account between the parties. The court also took into account a clause of the contract that required such a report in the event of abandonment.
The report does not replace technical analysis: it describes what can be seen, without saying why a piece of work is defective. Where construction defects are at issue, it is a useful preparation for an expert assessment. Have it drawn up before the contractor called in to take over the works intervenes, failing which the initial state disappears and the sharing of liability becomes uncertain.
Also check the general conditions of the quotation or contract: some contracts provide for the form of the report, its notification to the contractor or a waiting period before replacement. Complying with these terms avoids a dispute over the regularity of the process.
Must the contractor be summoned to the report or to the amicable expert assessment?
Summoning the contractor is not always mandatory, but it changes the value of the document. A report or expert assessment carried out in the contractor's absence is still put before the court and debated by the parties; however, it carries less weight when it stands alone.
The Third Civil Chamber of the Court of Cassation holds that, except in cases provided for by law, "the judge may not base a decision exclusively on a non-judicial expert assessment carried out at the request of one of the parties" (our translation) (Cass. 3e civ., 14 May 2020, No. 19-16.278). The same judgment specifies that this rule applies even if the assessment was carried out in the presence of the parties. An amicable expert assessment must therefore be corroborated by other evidence.
The Paris Court of Appeal accordingly accepted reports made in the contractor's absence because they were confirmed by the court-appointed expert assessment ordered afterwards (CA Paris, pole 4, ch. 5, 20 March 2024, No. 21/05972). Summoning the contractor by registered letter, stating the date, time and purpose of the report, therefore remains the best precaution.
If the contractor does not attend, its absence is recorded in the report. It will hardly be able to complain afterwards that the project owner did not involve it in describing the site.
Can the urgent applications judge record the abandonment and authorise completion by another contractor?
Yes, where the contractor's obligation is not seriously contestable. Article 835 of the Code of Civil Procedure (Code de procédure civile) allows the urgent applications judge (juge des référés) to award an interim payment or order performance of an obligation to do something. Article 145 of the same code also allows an expert assessment to be ordered before any proceedings, in order to preserve evidence of the state of the works.
The President of the judicial court of Mulhouse recorded the abandonment of a site, setting its provisional date "at a date whose final determination is a matter for the trial judges" (our translation) (TJ Mulhouse, urgent applications, 6 May 2025, No. 25/00156). By the same order, the President authorised the project owner to have the works completed by third-party contractors at the defaulting contractor's expense, up to a stated provisional limit.
This route has its limits. The urgent applications judge at Lyon refused such an authorisation, on the ground that the claim based on Article 1222 of the Civil Code was seriously contestable "since acceptance put an end to the works contract that had given rise to it" (our translation) (TJ Lyon, urgent applications, 3 February 2026, No. 25/00161). This decision, unfavourable to the project owner, shows that an acceptance that has already taken place closes the route under Article 1222: remedial work then falls under the one-year completion warranty of Article 1792-6 of the Civil Code, which requires a formal notice given after acceptance, a condition the judge found had not been met in that case.
Urgent proceedings are therefore suited to a simple, documented abandonment, before any acceptance. Where the facts are disputed, an expert assessment ordered in urgent proceedings is often the first step.
Can the works be finished without waiting for the judge's authorisation?
Article 1222 of the Civil Code does not make recourse to a third party subject to the judge's prior consent. Only the demolition of work carried out in breach of the contract still requires that consent. Three conditions remain: a prior formal notice, a reasonable time and a reasonable cost.
The project owner may advance the price of the replacement contractor and then claim reimbursement. Alternatively, before the works, it may ask the court to order the defaulting contractor to advance the necessary sums. In the first case, the judge reviews afterwards whether the time and cost were reasonable, in light of the compared quotations and the urgency; in the second, the judge assesses this before ordering the advance.
On the basis of that provision, the Paris judicial court held that the abandonment "forces the claimants to call on a third-party contractor to finish the works and to bear an additional cost to complete the works" (our translation) (TJ Paris, 6th ch. 2nd sect., 3 October 2025, No. 24/05642). As the contractor was in insolvency proceedings, the court admitted the project owners' claim in the liabilities, without ordering payment.
Acting alone has a price: if the time allowed was too short or if the new quotation appears excessive, the reimbursement may be reduced. A precise formal notice and two comparable quotations limit that risk.
Who pays the extra cost when the new contractor is more expensive?
The extra cost is the difference between the price needed to finish the works and the part of the original price still to be paid. It is a harm that can be made good by damages (Article 1231-1 of the Civil Code), provided it is justified by quotations, invoices and a precise record of the works already carried out.
The Montpellier Court of Appeal proceeded in this way: starting from the balance of the original contract, it deducted the cost of the works carried out by third parties, the remedial work to be expected and the penalties, before setting the sum due (CA Montpellier, 3rd civil ch., 30 January 2025, No. 20/03986). The court partly overturned the judgment and ordered the defaulting contractor to pay the balance thus established, also deducting the additional project management costs linked to completion.
The calculation therefore requires a joint basis: a record of the works carried out on the day of abandonment, valued at the contract price. Without that record, the contractor can argue that the new quotation includes services that were not in its own contract.
Other losses, such as a delay in moving in, additional rent or storage costs, must be proved separately, document by document. They are not to be confused with the cost of completion.
Must the project owner still pay for the works carried out before the abandonment?
In principle yes, for works that were carried out and are compliant. Abandonment gives rise to compensation, but it does not erase the price of what was properly done. The final account sets off the sums owed on each side.
The Court of Cassation quashed a judgment that had fully compensated the project owner while releasing the owner from paying the balance for the works carried out. It recalls that "damages awarded to a victim must make good the harm suffered, without resulting in either loss or gain for the victim" (our translation), and notes that the court had thus compensated the same harm twice (Cass. 3e civ., 14 May 2020, No. 19-16.278). This outcome, unfavourable to the project owner, calls for a rigorous account.
Conversely, the project owner must not pay for what has not been done. The Montpellier Court of Appeal deducted from the balance of the contract the works entrusted to third parties, which left a balance in the project owner's favour (CA Montpellier, 3rd civil ch., 30 January 2025, No. 20/03986).
Before withholding a payment, therefore, check the value of the works carried out and their compliance. An unjustified withholding can be presented by the contractor as the cause of the stoppage of the works.
Can building-damage insurance be called on before acceptance?
Yes, but only in the case provided for by Article L. 242-1 of the Insurance Code: before acceptance, the contractor must have been given formal notice without result, and its contract must then have been terminated because it was not performing its obligations. The two conditions are distinct, and the insurer checks both.
The Court of Cassation specifies that "it is only when, after formal notice, the contractor fails to perform its obligations and the contract is terminated that the building-damage insurer's cover may be sought for damage of the ten-year liability kind" (our translation) (Cass. 3e civ., 13 February 2020, No. 19-12.281). The cover therefore does not extend to everything that remains to be done: it concerns damage of ten-year gravity.
The Clermont-Ferrand judicial court held that "the conditions for triggering building-damage cover before acceptance are met" (our translation) after two unsuccessful formal notices and then the contractor's liquidation (TJ Clermont-Ferrand, 15 September 2025, No. 25/02010). Conversely, on the extent of the cover, the Versailles Court of Appeal dismissed the claim of the guarantor subrogated to the project owners' rights, the insurer not being bound to cover works to bring the structure into conformity with the contractual provisions (CA Versailles, 4th ch., 7 November 2022, No. 20/01629).
Before the claim is notified, the firm therefore checks the nature of the damage, the date of termination and the policy taken out.
Is formal notice necessary if the contractor is in judicial liquidation?
Not always. For building-damage insurance before acceptance, the Court of Cassation dispenses with this formality "where it proves impossible or pointless, in particular where the contractor has ceased trading" (our translation) (Cass. 3e civ., 13 February 2020, No. 19-12.281). The same judgment refers to a judicial liquidation that entails termination of the works contract. Since 15 February 2009, the opening of a liquidation no longer in itself terminates a contract in progress: the project owner may give the liquidator formal notice to take a position, the contract being terminated by operation of law if there is no answer within one month (Article L. 641-11-1 of the Commercial Code).
In the general law of contract, the Commercial Chamber likewise holds that "such a formal notice need not, however, be served where it follows from the circumstances that it would be pointless" (our translation) (Cass. com., 18 October 2023, No. 20-21.579). The judgment concerned a site where one party's conduct had made it impossible to continue the relationship.
These dispensations remain exceptions assessed case by case. In practice, a formal notice sent to the contractor's registered office, then to the representative or liquidator where one has been appointed, costs little and closes the debate. It also makes it possible to date the refusal to perform precisely.
Insolvency proceedings require an additional step: filing the claim with the creditors' representative within the time limits set by decree (Article L. 622-24 of the Commercial Code). The extra cost of completion and the other losses are declared there, if necessary on an estimate.
Within what time limit must a claim be notified to the building-damage insurer before acceptance?
Two time limits are to be distinguished. The policy sets the time limit for notifying the claim, which cannot be less than five working days, and forfeiture for late notification can be relied on only if the insurer proves that the delay caused it harm (Article L. 113-2 of the Insurance Code). Next, actions arising from an insurance contract are time-barred after two years from the event that gave rise to them (Article L. 114-1 of the Insurance Code). For damage arising before acceptance, this starting point is not the same as the mere discovery of the damage.
The Court of Cassation has held that, where the contractor is put into judicial liquidation, the event that starts the time running is the opening of the insolvency proceedings entailing termination of the contract (Cass. 3e civ., 13 February 2020, No. 19-12.281). In that case, the delivery guarantor was subrogated to the project owner's rights; the court of appeal, which had declared the action time-barred, was overturned. The liquidation, opened in 2008, then entailed termination of the contract; today, Article L. 641-11-1 of the Commercial Code removes that automatic effect, and it is the date of effective termination that must be established.
Once the claim notification is received, Article L. 242-1 of the Insurance Code governs the insurer's response: sixty days to rule on the principle of cover and, if it accepts, ninety days to put forward an offer of compensation, both periods running from receipt of the notification. Failing that, the insured may incur the necessary expenses after notifying the insurer.
The safest course remains to notify the claim as soon as the contract is terminated or the insolvency proceedings are opened, together with the formal notice, the report and the list of damage.
Does the tradesman's ten-year liability insurance cover an abandoned site?
In principle no, as long as the work has not been accepted. Ten-year liability under Article 1792 of the Civil Code and the compulsory insurance under Article L. 241-1 of the Insurance Code are tied to acceptance. Abandoning an unfinished site is first and foremost a failure to perform the contract.
The Paris Court of Appeal so held in a case unfavourable to the project owner: it refused tacit acceptance and then judicial acceptance, holding that "ten-year liability cover, in the absence of acceptance, cannot be called on" (our translation) (CA Paris, pole 4, ch. 5, 20 March 2024, No. 21/05972). It also set aside the public liability policy, which excluded the insured's poor performance of its professional obligations.
The tradesman's professional liability policy must therefore be read line by line. Depending on the cover and exclusions actually taken out, it may cover damage caused to third parties or to existing structures, and exclude the cost of redoing the insured's own work, as in the case decided in Paris.
Ask the contractor, or its liquidator, without delay for the insurance certificates in force on the date the site opened. They are what later make it possible to identify the insurer and the exact nature of the cover taken out.
Can taking possession and paying almost everything amount to acceptance of the unfinished work?
It is a real risk. According to the Court of Cassation, "taking possession of the work and paying for the works give rise to a presumption of the project owner's unequivocal intention to accept it, with or without reservations" (our translation) (Cass. 3e civ., 18 April 2019, No. 18-13.734). An acceptance, even a tacit one, can change the applicable regime and close off certain routes.
The presumption can be rebutted. Before the Paris Court of Appeal, the project owner had barred the contractor from the site, disputed the quality of the works and had the uninhabitability of the dwellings recorded (CA Paris, pole 4, ch. 5, 20 March 2024, No. 21/05972). The court inferred an equivocal intention, then refused judicial acceptance: "The court cannot therefore pronounce acceptance of works that are not in a state to be accepted" (our translation) (CA Paris, pole 4, ch. 5, 20 March 2024, No. 21/05972).
Depending on the objective pursued, two strategies point in different directions. If the aim is to have a third party finish the works at the contractor's expense on the basis of Article 1222 of the Civil Code, any appearance of acceptance must be avoided, because acceptance ends the works contract; after it, only the remedial work under the one-year completion warranty remains enforceable, after a fresh formal notice. If the aim is to open the statutory guarantees, an express acceptance with detailed reservations may be considered, after checking that it can cover all of the works or, for a partial acceptance, a package or a coherent whole.
The firm examines the dates of moving in, the payments and the letters exchanged before recommending one or the other.
In a single-family house construction contract, what must the delivery guarantor do?
The single-family house construction contract includes a delivery guarantee, given by an approved institution. Under Article L. 231-6 of the Construction and Housing Code (Code de la construction et de l'habitation), if the house is not delivered on the agreed date, the guarantor calls on the builder to deliver or to carry out the works. If there is no useful response within fifteen days, the guarantor takes on its obligations itself.
The provision then requires the guarantor to designate, under its own responsibility, the person who will finish the works. Once the house has reached the watertight stage, the guarantor may propose that the project owner conclude the completion contracts directly, and then pay the contractors directly.
The guarantor bears the cost in excess of the agreed price where it is indispensable to finish the house, although an excess limited to 5% of that price may apply. The Court of Cassation has specified that "an excess may be stipulated for exceeding the agreed price, but not for a price supplement" (our translation) (Cass. 3e civ., 1 October 2020, No. 18-24.050). The same judgment, however, approves the rejection of the project owners' claim for late-delivery penalties, the stoppage of the site being justified by unpaid stage payments.
The project owner therefore informs the guarantor in writing as soon as the works stop, first checking that its own payments are up to date.
Must the contract be terminated before the rest of the works are entrusted to another contractor?
Not necessarily under the Civil Code: Article 1222 of the Civil Code allows performance by a third party after a simple formal notice, without prior termination. Ending the contract remains a strategic choice, which prevents a second contractor from working on a package of which the first remains the holder. Termination by notification under Article 1226 of the Civil Code requires a formal notice that expressly announces the termination, followed by a reasoned notification.
This termination is done at the project owner's own risk: if the contractor disputes it, the project owner will have to prove the seriousness of the non-performance, under Article 1224 of the Civil Code and the same Article 1226. A report and unanswered messages then form the basis of that proof.
For building-damage insurance before acceptance, termination is a condition of cover, not a mere precaution (Article L. 242-1 of the Insurance Code). The Clermont-Ferrand judicial court examined in turn the absence of acceptance, the formal notice and the termination before granting the claim (TJ Clermont-Ferrand, 15 September 2025, No. 25/02010).
The formal notice may announce both the termination and the use of another contractor, and then be followed, if the conditions are met, by a reasoned notification of termination, together with an invitation to a joint report on the state of the works.
Sources and related pages
Official texts and related pages
The sources for this page and the firm's related areas of practice.
Further reading
Page updated on 1 November 2026.
A stalled site to be recorded and finished? Take stock today.
Send the contract, the payments, the photographs and the exchanges with the contractor: the firm checks the evidence of abandonment, the order of the steps and the insurance that can be called on.
The latest news.
What our clients say
Best real estate law and business law lawyer in Paris. A humane and attentive lawyer, with a wonderful team. Thank you, Maître KOHEN
Translated from French
Thank you to Maître KOHEN for his analyses of recent case law on fraudulent non-disclosure in property sales. It reassures me about an action for annulment that I am considering after buying a house affected by serious defects intentionally concealed by the seller and not reported by the estate agent; also defects (rising damp) characterised by spreading through-cracks and damp stains, not reported by the estate agent… Worse, defects concealed by the latter or at his instigation, under a coat of paint and by polystyrene tiles glued to the ceiling of a bedroom. And the said estate agent drafted the preliminary contract, which of course contains no information about any of these defects. Just to add that, being 77 years old and suffering from cognitive impairment, I am certain that the estate agent thought I would not be able to discover the deception and above all to establish the fraudulent intent, still less to bring legal proceedings given the complexity and length of the procedure... That is why I am opting for the criminal route, insofar as the intentional concealment of the defects by the seller and then by the estate agent amounts to the fraudulent manoeuvres of art. 313-1 of
Translated from French
Maître Reda KOHEN assisted me in a dispute concerning a sale agreement with a defaulting party. He provided professional and responsive support, and I highly recommend him.
Translated from French
I highly recommend Maître Reda Kohen. Thanks to his explanations, I was able to recover my security deposit in a situation that seemed blocked. He was responsive, clear, and very professional. A big thank you for his invaluable help!
Translated from French
Excellent support from Maître Kohen in a case combining business law and real estate law. Clear legal analysis from the first meeting, right through to the hearing. Professional and accessible lawyer, I highly recommend his firm in Paris 17.
Translated from French
Maître Kohen assisted me in recovering unpaid debts from a defaulting tenant. Procedure mastered from start to finish, from the payment order to eviction. Human, attentive, and always reachable. Thank you for your work.
Translated from French
As a young student living in an apartment, my landlord tried to make me leave my accommodation even though he had sent me no termination notice. I therefore contacted Mr. Reda Kohen to help me as I couldn’t handle the situation alone. In just 3 days everything was resolved, Maître Kohen defended me and accompanied me with an irreproachable level of commitment and efficiency. I can only recommend his professionalism!
Translated from French
I turned to Maître Kohen for a complex real estate dispute and I highly recommend his firm. He is very professional; he thoroughly analyzed my case from the very first appointment and clearly explained the possible options. Thanks to his expertise, we achieved a very favorable outcome. Responsive, a good teacher, and committed, he is a lawyer you can truly trust. Yours faithfully, Miss Maazaz
Translated from French
Very satisfied! I would like to thank Maître Esther Cornu here, who managed to resolve a very complicated dispute in a divorce and family law matter...Thanks to Maître Cornu, a judgment was handed down in my favour even though it was far from a foregone conclusion...So I recommend this law firm
Translated from French
A precise and concrete analysis and an immediate response. Excellent.
Translated from French
I highly recommend this lawyer for his professionalism, honesty, and transparency. He helped me successfully and guided me through the process with great care and expertise. What I particularly appreciated was his honest approach and the fact that he recommended practical, cost-effective options instead of immediately pushing for the most expensive solution. He genuinely focused on finding the right approach for my situation. I’m very grateful for his support and would definitely recommend him to anyone looking for a trustworthy and professional lawyer in France.
Thank you for this detailed, precise help, with a proposal at the end on whether or not to continue (very quick response as well)
Translated from French
Very good advice given by Maître Cornu during our meeting on 16 October.
Translated from French
Very professional and responsive service. The lawyer quickly and carefully checked the validity of my wife’s residence permit in light of a specific legal regime. His work gave us clarity, whereas the usual administrative procedures were long and ambiguous. I appreciated his efficiency and professionalism, and I recommend his services.
Translated from French
I would like to warmly thank Maître Esther Cornu for her professionalism, her availability and the quality of her support. In a case of particular importance for my professional future, she showed great responsiveness, rigour and a gift for explaining things, taking the time to answer my questions precisely and to explain the various legal steps to me. I particularly appreciate the clarity of her analyses, her seriousness and her commitment in following up my case. Many thanks to Maître Esther Cornu for listening and for her support. I highly recommend!
Translated from French
I was pleasantly surprised by the responsiveness of Mr Reda Cohen, who took the time to answer my questions about my case instantly. It has become so rare these days to find a lawyer who is so available, responsive and attentive, even when it is simply a matter of answering questions. His answers are clear, precise and reassuring. You can tell that he takes the time to understand the situation and to provide relevant answers. Beyond his excellent ratings on Google, it is above all this availability and this seriousness that make the difference. Many thanks to Mr Reda Cohen for his professionalism and his responsiveness. I highly recommend!
Translated from French
A huge thank you to Maître Esther Cornu from Kohen Avocats for her support during a particularly difficult time. Her attentiveness, empathy, and humanity touched me deeply. She was able to answer my questions with clarity and sensitivity, while demonstrating great professionalism and fully respecting the confidentiality of the case. Beyond her professional qualities, I met a deeply humane lawyer whose support made a real difference. I sincerely recommend her.
Translated from French
Good experience. And good work, thank you for everything.
Translated from French
Saw Hassan on the TV news
Translated from French
very clear article
Translated from French
Loading…
Your cookies
We use cookies to measure the effectiveness of our campaigns and improve the site. You can change your choice at any time.