Buying a flat in France: who pays for co-ownership works already voted?

Individuals, businesses and directors. Reda Kohen practises real estate law, company law and business law in Paris. First analysis: €80 incl. VAT, personal reply within 24 hours.

100% confidential · Legal professional privilege · No obligation

Paris Bar Real estate, company and business law CNB listing on avocat.fr
Reda Kohen, lawyer admitted to the Paris Bar
Reda Kohen
Lawyer admitted to the Paris Bar

A flat in France can come with a share of a roof or façade bill even when the work was approved before you first saw the property. Ask for the resolution and its instalment schedule before you sign. For works outside the annual operating budget, article 6-2 of the decree of 17 March 1967 assigns each provision to whoever is the co-owner when the sum becomes payable. A clause in the sale agreement can put the cost on the seller between the two of you, while the co-owners’ association can still collect an instalment from you under the statutory rule. That distinction follows from article 6-3 of the same decree.

The figures you need are the share allocated to the flat, the amounts already payable, the amounts still to fall due and any further work awaiting a vote. They come from different documents. This guide explains how to reconcile them, what to put into the sale agreement and how to handle an unexpected bill after completion. It concerns the resale of an existing flat under copropriété (French co-ownership of a building), including purchases made from abroad.

I. How the building’s works bill follows a sale

A. Identify the charge and find the date it becomes payable

The syndicat des copropriétaires (co-owners’ association) manages the shared interests of the building through the syndic (its appointed manager). A call issued by the manager may represent routine operating costs, an instalment for a specific project or a contribution to a reserve. Before deciding whether the buyer or seller pays a demand, label each line according to what it funds. Several different lines can appear together on a single statement, even where the amounts fall under different rules.

Article 6-2, paragraph 2, of the 1967 decree describes the person liable for provisions outside the operating budget as « celui, vendeur ou acquéreur, qui est copropriétaire au moment de l’exigibilité ». This means the seller or buyer who is the co-owner when payment becomes due. Under article 14-1 II of the law of 10 July 1965, the owners’ meeting determines the payment arrangements for these works. Look for the dates or events specified in the resolution. The date shown on the envelope, the date the contractor sends its invoice and the date the installation is finished can each differ from the date when a provision falls due.

The vote can approve staggered payments. For example, the minutes may say that one portion is payable on a fixed date and another at the start of the works. Ask for written confirmation of whether the second event has occurred and which call implements the resolution. If the paperwork shows two timetables, request the later minutes or other documentation that explains the change. A contractor’s provisional timetable may help the buyer plan cash flow, while the resolution and any later decision are the documents to read for the association’s payment arrangements.

Ordinary operating provisions follow a separate limb of the rule. The payable provision for the budget falls on the seller under article 6-2, paragraph 1. Under article 14-1 I of the 1965 law, the provision becomes due on the first day of each quarter unless the owners’ meeting sets a different period, in which case it becomes due on the first day of that period. A proportional split for the quarter agreed on completion is a settlement between buyer and seller under article 6-3. Keep it separate from any agreement about the roof or façade.

The Cour de cassation, Third Civil Chamber, 20 May 2021, no. 20-15.633, applied the budget rule to a forced auction. It upheld liability for the ordinary provision that had fallen due on 1 October, before the transfer on 5 October, even though most of the quarter lay ahead. The court partly quashed the ruling on other sums. The point relevant to a resale is the court’s treatment of the provision as a charge tied to when it became payable rather than a bill accruing day by day. The decision concerned a budget provision, so use article 6-2, paragraph 2, for the special works instalments discussed here.

There may also be a credit or shortfall once the accounts are approved. Article 6-2, paragraph 3 puts that difference on the account of whoever is co-owner when approval takes place. If your draft agreement deals with a named project but says nothing about the annual reconciliation, ask how the two figures should be handled and whether the parties want a separate provision for the accounts. In the budgeting worksheet, leave a separate line for this item so that you can distinguish it from an announced call for works.

For any call that falls close to signing, compare the due date in the resolution with the transfer information in the sale papers and obtain confirmation that the manager was notified. Article 6 of the 1967 decree requires notification of the transfer to the manager without delay and specifies the information to include. Where dates are close or the demand is still addressed to the seller, show the notary the call and the transfer record together. The name printed on a demand can simply reflect the manager’s records when the demand was prepared.

B. Reconcile the meeting minutes, financial disclosures and lot figures

Start with the minutes of the assemblée générale (owners’ general meeting). The strongest entry for budgeting is a numbered resolution that approves a project, identifies a cost or quote and states how the money will be called. A reference to a deteriorating roof, a request for quotes or an agreement to commission a survey should prompt its own follow-up. Track what was actually authorised as well as what the residents discussed. Where several resolutions concern the same project, keep the one commissioning a survey, the one authorising the main contract and the one approving any later changes in separate rows.

For covered sales of lots in a residential or mixed residential building, article L. 721-2 of the Construction and Housing Code sets out the documents and financial information to provide to the buyer. With a preliminary agreement, the article generally requires delivery by signature and includes the last three years’ meeting minutes, except where the seller could not obtain them from the manager. It also provides for disclosure of specified financial information and, where applicable, the adopted multi-year works plan or an existing draft in its absence. The statute has exceptions, including for certain documents where the buyer already owns a lot in the building or the sale concerns an ancillary lot. Check how the rule applies to the entire package if you are buying a flat together with a cellar or parking space.

The pre-sale pack helps you identify exposure before committing. Close to completion, compare it with the état daté (dated financial statement). Under article 5 of the 1967 decree, the manager sends this statement to the notary before the relevant transfer deed, at the notary’s or transferring owner’s request. It has three parts. The first lists sums that may remain due from the seller. The second lists sums the association may owe the seller. The third lists sums expected to fall on the new owner, including provisions outside the forecast budget that are still to become payable. The article allows approximate figures where indicated and takes account of the fact that the accounts are still to be settled.

Read the part concerning the incoming owner against the calls listed in the minutes. If the statement shows €4,200 for a lot and the spreadsheets say €6,200, ask the manager to explain the difference in writing. It may be an earlier instalment on the seller’s side, an amount drawn from the reserve, a different key for allocating the expense, or a revised quote that the spreadsheet has picked up before anyone reconciled it with the resolutions. Compare the same lot, resolution and stage of payment in each document. The building’s total project price has little value for your cash planning until you know the amount allocated to the lots you are acquiring.

Give the fonds de travaux (works reserve fund) its own column. Article 14-2-1 of the 1965 law provides for the owners’ meeting to allocate reserve money to eligible spending and specifies what happens to contributions on a transfer. Amounts paid into the fund are attached to the lots and stay with the association on sale. The buyer may agree to pay the seller an equivalent amount in addition to the price. For budgeting, ask how much the meeting has allocated to the particular project, what is still to be collected and whether the deed separately provides for a payment to the seller in respect of the fund. Record amounts on the same basis so that an allocated reserve contribution is counted only once.

Keep an estimate for works still under discussion alongside the confirmed instalment schedule. A roof report can expose a foreseeable cost even where the minutes show that owners postponed the vote. Ask whether the agenda for the next meeting is available and whether it includes the same scope as the estimate you were given. If you are comparing two flats, put the outstanding calls and the possible future work on separate lines for each one. An apartment with a lower asking price may require substantially more cash after completion. Keep the translated estimate with its original date so that you can distinguish it from the final amount in a later resolution.

For a purchase from abroad, ask for the complete original PDFs and a translation or explanation of the operative paragraphs, then keep the originals alongside your notes. Focus on the exact resolution number, the approved scope, the lot identifiers and the call schedule. Words such as devis (contractor’s quote), appel de fonds (call for payment) and exigible (payable) identify different documents or stages. If you have a proxy signing for you, agree in advance which change in the expected bill must be referred back to you and make sure the notary knows whom to contact when sending revised completion figures.

II. How to allocate the cost and deal with a disputed bill

A. Put the economic agreement into the sale papers

Once you have the payment schedule, decide which instalments the buyer and seller will ultimately bear. Under article 1103 of the Civil Code, « Les contrats légalement formés tiennent lieu de loi à ceux qui les ont faits. » A lawfully formed contract binds the parties who made it. In this setting, article 6-3 of the decree limits the effect of an agreement that changes the statutory allocation to the parties to the sale. Draft with two questions in mind. Who will pay the association’s demand under article 6-2? How and when will the other party bear any portion assigned to them by the deal?

Put the arrangement into the compromis de vente (bilateral preliminary sale agreement) or other preliminary agreement, as applicable, and check that the final deed reflects it. Use the building address, lot numbers and the date and number of each resolution. Specify whether the amount is a fixed allowance, a cap or a reimbursement based on specified calls. If the figure includes taxes appearing on the contractor’s quote or a fees line separately approved for administering the project, describe what is included. Ask how the calculation should treat any credits, an unused allowance and later spending for additional work. Clear arithmetic makes a clause easier to apply if the contractor changes or the seller moves abroad.

For example, assume a roof resolution allocates €6,000 to the flat, split into €1,800 already payable before the transfer, €2,400 payable after it and a further €1,800 payable later. Assume the seller is the co-owner for the first instalment and the buyer for the other two, and that the figures already reflect any reserve money assigned to the project. Under article 6-2, paragraph 2, the association collects the first amount from the seller and €4,200 from the buyer. If the parties agree that the seller bears all €6,000, the completion papers can provide for a €4,200 adjustment between the parties, subject to the terms they agree and article 6-3. This keeps the amount the seller has already been charged out of the buyer’s reimbursement calculation.

Suppose the association later approves a further €900 for the same roof, after a different contractor identifies an extra item. If you want the seller to cover that amount, discuss expressly whether the agreement reaches a later vote, how closely the additional work must relate to the original scope and whether there is a cap. If the parties only intend to cover the initial resolution, record that intention. Fix an evidence procedure for any post-sale payment, including which documents the buyer supplies, which currency is used and the contractual payment date. If the buyer would have to advance the full amount first, check whether the proposed structure leaves enough cash to cover an unexpectedly early call under the approved schedule.

The Bordeaux judicial court’s judgment of 15 May 2025, no. 23/09505, illustrates the point. The deed assigned work voted up to the sale to the sellers and work voted later to the buyer. The court awarded the buyer the sellers’ share it found due for the costs covered at the time of sale, while declining to charge the sellers for additional works approved later. This was a first-instance decision on the particular deed and resolutions. Its practical lesson is to identify the additional scope or cost overrun expressly if the deal is meant to cover it.

If a meeting is scheduled between signing the preliminary agreement and completion, agree how the seller will send the agenda, quotes and subsequent minutes. Discuss with the notary whether the seller will provide a proxy where appropriate, who will decide how to respond to a new resolution, and what happens to the settlement figures if the project is approved. A power to attend or vote should be documented separately from the allocation of the resulting cost. Keep one written version of the cost allocation and have both parties verify that the completion statement uses it. The English-language overview of French real estate law also explains the legal context for purchases and property disputes.

B. Follow the evidence if a demand arrives after completion

Start by requesting a breakdown in writing from the manager. Ask for the lot ledger, the resolution authorising the amount, the provision’s payable date and the account on which it was posted. Request a copy of any document showing that the charge was revised or moved to a later date. A statement labelled “balance carried forward” gives you less information than the underlying entries. If the problem appears to be an omitted payment, supply the transfer reference or receipt and ask for a corrected statement. If it appears to be the seller’s debt, give the notary and manager the documents that show where the charge was recorded and when the transfer was notified.

Read the reimbursement clause independently of the request to the manager. Article 1353 of the Civil Code places the burden of proving an obligation on the person asking for its performance and the burden of proving payment or another discharge on the person who says the obligation has ended. Preserve the signed deed, schedule, notices and proof of what each party paid. If you are requesting reimbursement, itemise the instalment, the clause you rely on and the relevant resolution, and explain how the total was calculated. Keep the proof of sending with any response. If you receive a formal demand or court papers, bring the complete file promptly so that the specific procedure and applicable dates can be checked on their own facts.

A buyer who discovers a missing vote or material project information has a different issue. Compare the material actually supplied before signing with the papers that existed at the time. Under article 1112-1 of the Civil Code, a party who knows information decisive for the other’s consent must disclose it where the other legitimately lacks it or relies on that party. The text excludes estimates of the value of the performance and expressly addresses how the burden of proof is shared. A known decision to proceed, the minutes approving a large assessment and a contractor’s later price increase each raise different questions about the timing and content of the information.

Article 1137 of the Civil Code separately addresses dol (fraud inducing agreement). Its wording includes « la dissimulation intentionnelle par l’un des contractants d’une information dont il sait le caractère déterminant pour l’autre partie ». In other words, the provision covers deliberate concealment of information that the party knows is decisive for the other party. A demand received after completion establishes the existence of the demand. To support a disclosure or concealment argument, identify what was known when the parties agreed, by whom, how it was communicated and which evidence shows why it mattered to your decision. A dated request about major work, the response and the original attachment set are particularly useful documents to preserve.

Finally, identify what you want corrected. A duplicate call needs an accounting explanation. A valid call with a reimbursement agreement calls for proof of the other party’s contractual share. A missing document or disputed vote may raise a wider question about the sale or the association. For each item, write down the requested outcome, the person or body from whom it is sought, the amount and the document that supports it. That exercise also helps you avoid reopening a resolved item when several bills concern the same building project.

Conclusion

To budget for an existing French flat with works already approved, start with the resolution, the amount allocated to your lot and the dates or events that make each instalment payable. Compare those figures with the dated statement and ask the notary to record any separate allocation between seller and buyer in the deed. Where a project continues after completion, make sure the documents explain who bears a revised quote, an extra vote or an accounting adjustment. Keep enough cash for the amounts the association can collect from you even if the seller has agreed to bear them under the contract. The resulting record should let you match a later demand to the right resolution and show exactly how you reached your figure.

Source: Cour de cassation – “Judilibre” & “Légifrance” Open Data.

What our clients say

4,9216 Google reviews
kader ladjouzi
2 months ago

Best real estate law and business law lawyer in Paris. A humane and attentive lawyer, with a wonderful team. Thank you, Maître KOHEN

Translated from French

Janou SAMUEL
3 months ago

Thank you to Maître KOHEN for his analyses of recent case law on fraudulent non-disclosure in property sales. It reassures me about an action for annulment that I am considering after buying a house affected by serious defects intentionally concealed by the seller and not reported by the estate agent; also defects (rising damp) characterised by spreading through-cracks and damp stains, not reported by the estate agent… Worse, defects concealed by the latter or at his instigation, under a coat of paint and by polystyrene tiles glued to the ceiling of a bedroom. And the said estate agent drafted the preliminary contract, which of course contains no information about any of these defects. Just to add that, being 77 years old and suffering from cognitive impairment, I am certain that the estate agent thought I would not be able to discover the deception and above all to establish the fraudulent intent, still less to bring legal proceedings given the complexity and length of the procedure... That is why I am opting for the criminal route, insofar as the intentional concealment of the defects by the seller and then by the estate agent amounts to the fraudulent manoeuvres of art. 313-1 of

Translated from French

Paul MALIK (powlo)
6 months ago

Maître Reda KOHEN assisted me in a dispute concerning a sale agreement with a defaulting party. He provided professional and responsive support, and I highly recommend him.

Translated from French

Rayan Kallout
7 months ago

I highly recommend Maître Reda Kohen. Thanks to his explanations, I was able to recover my security deposit in a situation that seemed blocked. He was responsive, clear, and very professional. A big thank you for his invaluable help!

Translated from French

Naji Jouahri
7 months ago

Excellent support from Maître Kohen in a case combining business law and real estate law. Clear legal analysis from the first meeting, right through to the hearing. Professional and accessible lawyer, I highly recommend his firm in Paris 17.

Translated from French

Halim Tunde
7 months ago

Maître Kohen assisted me in recovering unpaid debts from a defaulting tenant. Procedure mastered from start to finish, from the payment order to eviction. Human, attentive, and always reachable. Thank you for your work.

Translated from French

Cha
7 months ago

As a young student living in an apartment, my landlord tried to make me leave my accommodation even though he had sent me no termination notice. I therefore contacted Mr. Reda Kohen to help me as I couldn’t handle the situation alone. In just 3 days everything was resolved, Maître Kohen defended me and accompanied me with an irreproachable level of commitment and efficiency. I can only recommend his professionalism!

Translated from French

Asmaa Maazaz
8 months ago

I turned to Maître Kohen for a complex real estate dispute and I highly recommend his firm. He is very professional; he thoroughly analyzed my case from the very first appointment and clearly explained the possible options. Thanks to his expertise, we achieved a very favorable outcome. Responsive, a good teacher, and committed, he is a lawyer you can truly trust. Yours faithfully, Miss Maazaz

Translated from French

chaymaa aouadi
8 months ago

I called upon Maître Reda Kohen, a real estate lawyer in Paris, and I am fully satisfied with his support. Very professional, responsive and attentive. He quickly analyzed my case, clearly explained the legal strategy and effectively defended my interests. Thanks to his expertise and determination, we obtained a very favorable outcome. I highly recommend Maître Kohen to anyone looking for a real estate lawyer in Paris.

Translated from French

Fatima Arbouhi
8 months ago

Excellent real estate lawyer. Professional, responsive and attentive, he perfectly met my expectations and accompanied me with great seriousness throughout my case. I highly recommend his services.

Translated from French

Laurent Joulaud
9 months ago

Maître Kohen helped us enormously in our case of eviction of a tenant who hadn't paid rent for many months. He was quick and efficient in drafting the summons and the various actions. He was also very clear about the different stages of the procedure and gave us almost instant feedback when he received documents to communicate. I highly recommend him.

Translated from French

H
10 months ago

The best real estate lawyer in Paris, I recommend without hesitation.

Translated from French

Sokona Dembele
10 months ago

Maître Kohen is an extremely competent and rigorous lawyer. His professionalism, responsiveness, and the quality of his support were remarkable—I weigh my words. Thanks to serious and perfectly mastered work, we obtained a favorable outcome despite a delicate case. He is the best real estate lawyer. I highly recommend him.

Translated from French

Hamid Agouz
1 month ago

I was pleasantly surprised by the responsiveness of Mr Reda Cohen, who took the time to answer my questions about my case instantly. It has become so rare these days to find a lawyer who is so available, responsive and attentive, even when it is simply a matter of answering questions. His answers are clear, precise and reassuring. You can tell that he takes the time to understand the situation and to provide relevant answers. Beyond his excellent ratings on Google, it is above all this availability and this seriousness that make the difference. Many thanks to Mr Reda Cohen for his professionalism and his responsiveness. I highly recommend!

Translated from French

Salon Sisters
1 month ago

Thank you, Maître Kohen, for your professionalism, your responsiveness and your seriousness. You handled my case perfectly, with a great deal of attentiveness, rigour and efficiency. I was very satisfied with your support and the work carried out. I recommend him without hesitation!

Translated from French

Frederic Lopes
1 month ago

Excellent professional. I strongly recommend him for his dedication and expertise.

Translated from French

Mitalie Talie
2 months ago

Great business law lawyer in Paris, attentive, available and understanding. I would come back if I have a problem.

Translated from French

Siko7801 rouger
2 months ago

Thank you for this very humane and professional advice. I strongly recommend.

Translated from French

Coralie Natation
2 months ago

I highly recommend Maître Kohen’s firm for its availability, its responsiveness and its very great professionalism. Thank you for the many pieces of advice and the efficiency of your firm!

Translated from French

Amir
8 months ago

Excellent expertise in real estate law from Me Reda Kohen

Translated from French

Beaudrique Abao
1 month ago
Krep Events Traiteur Breton
1 month ago

very clear article

Translated from French

Zakaria Airbnb
1 month ago
Gabriele
1 month ago