If you are buying a house in France and the seller cannot show planning permission for an extension, ask for the council file and compare the approved drawings with the house as it stands. A permit for the original house may cover none of the later work. If the extension is essential to your purchase, ask the notaire (the French public officer handling the transfer) to record what the seller must produce and what happens if the paperwork or the building falls short. If you have already bought, preserve the advertisement, contract and plans before making changes to the property.
The clearest starting point is to separate three questions. What was built, and when? What did the planning authority authorise? What did the seller agree to deliver? The answers can differ. A veranda may be entirely visible during a viewing while the absence of approval is known only to the seller. A permit may exist while its drawings show a smaller extension. And a discount in the purchase price may reflect the buyer’s willingness to take on work without changing what the planning authority can require. Each question calls for different evidence. A French Supreme Court judgment published on 26 November 2026 illustrates why the date of completion and the history of the property matter when a municipality seeks demolition.
I. Check what the council authorised before you buy
A. Match the planning file to the building you viewed
Start with a list of the changes to the house. Include the rear extension, any enclosed terrace, the former garage now used as living space, and additions to a detached building. Record what each space is used for and why it matters to you. A covered area may have become a habitable room through several separate projects. The most recent set of plans may date only from the installation of new windows. An architect or surveyor can mark the current layout on a plan and compare it with each approved drawing. Photographs taken from similar angles are useful when a discrepancy concerns the footprint, roofline or distance to a boundary.
The distinction between a permis de construire (building permit) and a déclaration préalable (prior works declaration) matters. Article L421-1 of the French Planning Code sets out the general permit requirement for construction and refers to regulations identifying the works on existing buildings and changes in the authorised category of use that also require a permit. Article L421-4 refers to regulations determining which projects call for a prior declaration because of their dimensions, nature or location. Ask the planning adviser to identify the type of approval required for the actual project and to explain which rules applied when the work was carried out. A floor-area figure taken from a general guide cannot answer that question on its own.
Request the property address, the parcel references and every application number the owner has. Ask the mairie (town hall) or the competent planning office about the documents available in its files. The useful set consists of the decision, the drawings filed with it, and any later decision or drawings modifying it. Include the relevant pages from the seller’s deed and its annexes. Older addresses and parcel references may differ from current ones. If the office finds nothing on a first search, record which address, dates and references were checked, and ask the seller for material that might narrow the search. An inconclusive search should remain an open question in the purchase file.
Read the documents by function. A receipt shows that material was filed. The decision and drawings tell you what the authority agreed to. A déclaration attestant l’achèvement et la conformité des travaux (declaration of completion and conformity) records a declaration made to the authority. Article L462-1 of the Planning Code provides for a declaration to the town hall attesting completion and conformity with the permit or prior declaration. Article L462-2 describes the competent authority’s power to inspect the work and, when the work departs from the approval, to require a modification application or compliance. Keep the completion declaration and any subsequent letter alongside the approval. Read the plans as well, because they show which work the paperwork concerns.
A certificate under Article R462-10 of the Planning Code has a specific purpose. In the circumstances set out in that article, it certifies that conformity with the permit or declaration was not challenged. Ask for the certificate to be matched to the relevant project reference. A certificate for an earlier addition does little to explain an enclosure built afterwards. Keep a record of what the architect actually saw, especially when a remote viewing or a video tour makes it difficult to check the boundary wall, external dimensions or extent of the roof.
Suppose the seller supplies a permit with a drawing of an open terrace, while the listing shows a heated dining room at the same location. Record the two versions in the file and ask who enclosed the terrace and whether a separate application was made. If the seller sends a tax statement or an updated floor plan, keep it for what it may tell you about the chronology or the advertised area. Keep looking for the planning decision and drawings. In a remote purchase, ask the adviser to identify each room by reference to both the listing and the plan, since the names used for a room can change between an advertisement, a deed and a planning application.
B. Establish what could happen if the work has no approval
Put the file into one of three working categories. The first is work with approval that appears to match the building. The second is work for which an approval exists but the building appears to depart from it. The third is work for which you have yet to find the required approval. The next step in the first category may be a final document check. In the second, have a professional describe and measure the differences. In the third, establish which procedure applied before asking whether an application can be made now. Include every phase of the project. The kitchen extension and the extra storey above it may have different planning histories.
A property visit can also reveal facts that matter to a possible application. For example, the roof may project over the boundary shown on a plan, the windows may face a neighbouring garden, or the proposed room may depend on keeping a separate entrance. Have an adviser check the plan local d’urbanisme (local planning plan), mapped constraints and any relevant restrictions in the title. Ask what drawings the authority would need and whether any physical alterations would have to form part of the proposal. A planning assessment should describe the building as it is and the outcome you need. An assessment based on an earlier or smaller design answers a different question.
Be careful with assurances based on age. Article L421-9 of the Planning Code provides that, when a building has been completed for more than ten years, an initial planning irregularity cannot ordinarily be the basis for refusing a permit or opposing a prior declaration. The article sets out exceptions, including where the building was erected without obtaining any building permit when one was required. It also lists other exceptions, including certain protected locations and certain risks. The rule concerns the grounds for a decision on an application. To assess whether it helps you, establish the completion date and identify exactly what was required and what was obtained.
A separate provision concerns action by the local authority. Under Article L480-14 of the Planning Code, the municipality or intermunicipal authority competent for the local planning plan may ask the civil court to order removal or compliance for the kinds of irregular work specified in the article. That action is subject to a ten-year limitation period running from completion of the work, as the same article expressly provides. Keep dated photographs, contractor invoices and completion records if the timing is disputed. The date on which the seller bought the house may have little to say about when the extension was finished.
The Third Civil Chamber illustrated how that evidence can matter in a judgment published in the Bulletin on 26 November 2026, no. 24-20.767. Permission to restore the existing structure had been granted, but an application to extend it was refused and the work went ahead. The municipality later brought a civil demolition action. On the evidence accepted by the appeal court, the work continued into 2008. The Cour de cassation upheld the finding that the municipality’s action, brought on 18 December 2017, was within ten years of completion. It treated the lower court’s reasoning that the earlier criminal complaint with a civil-party application had interrupted the limitation period as erroneous and unnecessary to the result. The judgment also held that the 2010 law extending the territorial scope of the municipality’s civil action applied to earlier completed works, subject to the action being brought within ten years of completion. If there is an earlier dispute in the property file, ask for the underlying papers showing what the authority challenged and what the court decided.
Having some form of permit is only part of the analysis in a demolition dispute. In its judgment of 3 April 2025, no. 23-15.213, the Third Civil Chamber of the Cour de cassation (France’s highest court for civil and criminal cases) sent back a dispute over a wooden chalet. The lower court had dismissed a neighbour’s demolition claim without checking, as it had been asked to do, whether the chalet complied with the permit. The judgment required that examination and left the outcome of the demolition claim to be decided on remand. The statutory framework in Article L480-13 specifically addresses buildings erected in conformity with a permit. For a buyer, the point is to compare what the authority approved with what was built before anyone relies on the protection associated with the permit.
Build your purchase decision around the practical consequence of each result. If the extension would need to be reduced, ask for a sketch and an estimate covering the junction with the main house, drainage, heating and finishes. If an application could preserve only part of the room, reassess the house on that basis. Tell the lender how the affected space was described to the valuer and ask whether uncertainty over its status changes the bank’s assessment. Discuss separately what the insurer needs to know about the work. For a remote buyer, it helps to put the cost of an application, any remedial work and the effect on available living space in one document before discussing the price. If the conversion added space, ask the notaire which property and tax records to review and whether anything should be referred to a tax adviser.
II. Protect the purchase in writing and preserve your options after signing
A. Agree who will resolve an uncertain extension before completion
Raise the issue before signing the compromis de vente (preliminary sale agreement). If an agreement has already been signed, obtain the complete signed version and all annexes before discussing a further commitment. Compare the provisions describing the property, the seller’s declarations about work, the conditions and the arrangements for the deposit. Include any plan identified in the contract. Article 1602 of the Civil Code requires the seller to explain clearly what they undertake and provides that an obscure or ambiguous term is construed against the seller. Record the exact extension, where it is and which drawings are relevant. That gives both parties a clearer basis for deciding whether the evidence supplied satisfies the agreement.
Ask which outcome the buyer actually needs. If it is proof of an existing approval, decide what documents will establish it and how differences in the drawings will be handled. If the seller must obtain a new planning decision, identify who will appoint the architect, pay for the application, supply signatures and respond to requests from the authority. If the decision would require a change to the built extension, decide whether the seller must complete the alterations and produce evidence of them. Where the extension is being bought for a particular use, describe that use in the instructions to the person drafting the contract. A buyer who needs a dining room open to the main house may have little use for an approval covering only a covered outdoor area.
Discuss a condition suspensive (condition precedent) if completion is to depend on an uncertain event. Article 1304 of the Civil Code defines this kind of condition. Agree the event objectively, the evidence by which it will be established, the contract dates and what happens to the deposit if it fails. If the parties are asked to cooperate, record who must do what and preserve copies of communications. Article 1304-3 provides that a condition precedent is deemed fulfilled if the party with an interest in it prevented its fulfilment. Ask the drafter to coordinate this clause with any separate condition relating to finance, since the planning file and the loan file may progress at different speeds.
In a cross-border purchase, send the relevant plan and the actual proposed clause to anyone advising you. Short translations of the agent’s emails tend to omit qualifications. Ask for an explanation in English of the documents, the obligations and what would happen under the French wording in each possible outcome. An adviser familiar with French real estate purchases and disputes can review the signed documents alongside the planning material. Buyers familiar with exchange and completion in England and Wales should identify which French document is being signed and what it commits them to on its own terms. The labels used in a property agent’s English correspondence vary.
If the seller proposes that you take on the planning issue for a lower price, compare the cost of keeping the extension, altering it or losing some of its use. Put a realistic allowance against design work, physical alterations and any impact on borrowing or resale, including the prospect of paying to investigate a problem that cannot be resolved as you hoped. Ask which risks the contract allocates to you. If regularisation is important to affordability or to the layout your family needs, consider making the transaction conditional on a clearly described result. Record a decision based on the documents you have and identify the questions still open.
B. If you have bought, establish the discrepancy and the basis of any claim
Preserve the signed deed, preliminary agreement, annexes, sales particulars, photographs, and messages in which you asked about the extension. Obtain a dated planning response and have drawings compared against measurements on site. Write down how you discovered the issue and what was said when you raised it with the seller or the agent. Preserve the state of the building in photographs before starting non-urgent works. If the authority has sent correspondence, keep the envelope and attachments as well as the letter. If you need to reply, seek advice on the notice itself and the planning file. Urgent safety work and preservation of evidence can be addressed together by documenting the building and taking professional advice.
One possible claim concerns the seller’s obligation de délivrance conforme (duty to deliver property conforming to the sale agreement). In its judgment of 11 September 2025, no. 23-17.751, the Third Civil Chamber applied Article 1604 of the Civil Code and said that the seller must deliver property « conforme à la convention des parties et, sauf stipulation contraire, à la réglementation en vigueur ». In English, the property must conform to the parties’ agreement and, unless they agreed otherwise, to the rules in force. The buyers in that case had discovered unpermitted work in a co-owned building. The court quashed the judgment rejecting their claims because the reasons given did not adequately exclude a failure to deliver conforming property. It sent the case back for reconsideration, leaving the underlying claims to be decided.
That decision gives buyers a way to frame the question even when the work predates the seller’s ownership or the deed is silent about a particular permit. Examine the actual contractual wording and the applicable rule, together with evidence about the state of the building. If your agreement contains an express reservation, read it against the particular works and the statements elsewhere in the deed. In a sale that expressly includes an enlarged kitchen with identified approved drawings, evidence that the kitchen extends beyond those drawings belongs in the same file as the contractual description. Distinguish the cost of fixing that discrepancy from the cost of improvements you planned independently.
A second line of inquiry is what the seller knew and disclosed. Article 1112-1 of the Civil Code requires disclosure of certain information known to one party that is decisive for the other’s consent, where the other party legitimately lacks the information or trusts the contracting partner. It allocates proof by requiring the person who says information was owed to show that it was due, and the other party to show that it was supplied. A visible extension is one fact. Whether a relevant planning refusal was disclosed is a separate factual question. A dated message asking specifically for the refusal or permit, together with the reply and contract annexes, can help establish what each party knew.
Article 1137 addresses dol (fraud inducing consent), including intentional concealment of information known to be decisive for the other party. Article 1130 asks whether the party would have declined to contract or would have contracted on substantially different terms, taking the parties and circumstances into account. An old application signed by a seller, a dated refusal, and a written assurance about the room can each clarify the facts. An archive gap alone establishes little about intent. If a claimant seeks to have the sale set aside, Article 1178 describes how nullity is established and provides for restitution following annulment.
A claim for vices cachés (hidden defects) has its own test. Article 1641 of the Civil Code addresses hidden defects that make the property unfit for its intended use or reduce that use so substantially that the buyer would have paid less or declined to buy. If an extension also leaks or shows structural movement, record the physical condition separately from the planning issue. The documents that establish the size of an approved room will serve a different purpose from a report about defective foundations. Explain how each problem affects use, what an expert has found, and which expenditure it has caused. If more than one legal basis appears relevant, assess each against the facts and the deed before making a demand.
Decide what you want to achieve and quantify it. Evidence might include the cost of drawings and an application, priced alternatives for compliance, and an independent assessment of the property with and without the disputed area. Ask for estimates detailed enough to distinguish rectification from betterment. Article 1231-1 of the Civil Code provides for damages where appropriate for non-performance or delay, subject to the terms of the article. A monetary settlement with a seller may help fund work. The planning question still needs its own resolution with the competent authority. Preserve separate records of any proposal to settle and any application or decision concerning the building itself.
Conclusion
Before buying a French house with an extension, get the approval and the drawings, compare them with the building, and ask for any discrepancy to be recorded in the sale documents. Where the purchase depends on keeping the extension as built, agree what evidence will satisfy that requirement and who will obtain it. If you discover the discrepancy after completion, conserve the sale papers, plans and dated evidence, and establish the actual effect on the property before deciding what to ask of the seller. The planning file tells you what the authority approved. The contract and surrounding evidence tell you which promises were made and which facts were disclosed. You need both to decide how to proceed.