Applicant or contract holder: rejected bid, urgent application, unpaid sums

Public procurement lawyer in Paris: challenge the rejection of a bid and obtain payment.

A terse rejection letter, a bid dismissed as abnormally low, a questionable scoring, a contract signed too early or a buyer slow to pay: in each case, a public procurement lawyer in Paris looks for the specific route, pre-contractual urgent application, contractual urgent application, challenge to the validity of the contract, damages claim or urgent application for an interim payment, each with its own time limit.

The pre-contractual urgent application must be brought before the contract is signed. In a formal procedure, the buyer may in principle sign eleven days after the rejection letter is sent electronically, and sometimes without waiting: send it to us the day you receive it.

Public procurement · Paris

Get a first analysis

Send the rejection letter, the consultation rules, your bid and your exchanges with the buyer or, for unpaid sums, the contract, the payment requests and the invoices: the firm will examine the route open to you and the time that remains.

24 à 48 h

first legal
review

€80incl. VAT

Preliminary review of your case. Examination of your documents and a first written analysis by Reda Kohen, within 24 to 48 business hours. Payment is made online after this form is sent.

  • Up to 1 GB of documents, folders and subfolders accepted
  • Secure payment, no banking data stored
  • Terms and fee agreement

Click or drag your files here
All formats accepted (PDF, Word, images, etc.)

Sending...

Payment constitutes a request for immediate performance of your analysis. Your data is used only to process your request. Terms · Privacy policy.

In the media

  • Lexbase

Kohen Avocats, Paris 17

Public procurement: what really decides the case

Reda Kohen, lawyer at the Paris Bar
Reda KohenLawyer at the Paris Bar

Public law · Paris 17th

What a public procurement lawyer in Paris does

  • Paris Bar
  • Public law
  • Public procurement

Reda Kohen, lawyer (avocat) at the Paris Bar, can act alongside companies that respond to public buyers' tenders and then perform the contract they win.

This page takes the point of view of the bidding company. The firm examines the rejection letter, the consultation rules and the bid, then checks whether a breach by the buyer may have harmed the company, which alone opens the pre-contractual urgent application under Article L. 551-10 of the Code of Administrative Justice (Code de justice administrative).

Once the contract is awarded, the question often becomes financial. The firm checks the payment period, the late-payment interest due automatically, the fixed recovery allowance and the quickest route to obtain a sum that the buyer does not seriously dispute.

Send what you have, even if incomplete: the firm will prioritise and complete the file with you. In an emergency, call +33 6 46 60 58 22.

Official profile in the directory of French lawyers (CNB)Firm at 11 rue Margueritte, 75017 Paris

Act before signature

The pre-contractual urgent application suspends signature of the contract from the moment it is notified to the buyer. After signature, only narrower routes remain open.

Limited review by the judge

The judge does not re-score the bids. The judge penalises a breach of the rules on publicity and competitive tendering, a distortion of the facts or a manifest error.

Payment has its own rules

Thirty days to pay in principle, late-payment interest that runs without formality and an allowance of 40 euros: the buyer's delay can be quantified from the day after the due date.

The rules

Rejection, urgent application, payment: the applicable rules

Five rules structure the defence of a company that is first a bidder and then a contract holder.

  1. As soon as it has made its choice, the buyer notifies each rejected candidate or tenderer without delay of the rejection of its application or bid (Articles L. 2181-1 and R. 2181-1 of the Public Procurement Code). In a formal procedure, this notification states the reasons for the rejection and, if the award has been made, the name of the successful bidder, the reasons for its selection and the date from which it may sign (Article R. 2181-3 of the Public Procurement Code); in an adapted procedure, the reasons are provided on request, within fifteen days of its receipt (Article R. 2181-2 of the Public Procurement Code). The Council of State (Conseil d'État) holds that the absence of this information is a breach, but that it disappears if the information is provided sufficiently early before the judge rules (CE, 27 September 2024, No. 490697).
  2. In a formal procedure, at least eleven days must separate the sending of the rejection notice and signature, sixteen days if it is not sent electronically (Article R. 2182-1 of the Public Procurement Code), except for a contract awarded to the only operator that took part in the consultation and for contracts based on a framework agreement (Article R. 2182-2 of the Public Procurement Code). This period applies only to contracts subject to a formal procedure with publication in the Official Journal of the European Union; it does not apply to the design-management contract concluded with the winner of a restricted design contest (CE, 13 March 2025, No. 498701).
  3. The judge in pre-contractual urgent proceedings is seised before the contract is concluded (Article L. 551-1 of the Code of Administrative Justice); the contract may no longer be signed once the matter has been referred to the judge (Article L. 551-4 of the Code of Administrative Justice). The judge may order the buyer to comply with its obligations, suspend the procedure, annul the award decisions and strike out irregular clauses (Article L. 551-2 of the Code of Administrative Justice).
  4. An abnormally low bid is one whose price is manifestly underestimated and likely to jeopardise proper performance of the contract; the buyer must ask for justifications before rejecting it (Articles L. 2152-5 and L. 2152-6 of the Public Procurement Code). The urgent applications judge exercises only a review for manifest error over this rejection (CE, 23 December 2025, No. 507574).
  5. The contracting authority pays in principle within thirty days of receipt of the payment request (Article R. 2192-10 of the Public Procurement Code and Article R. 2192-12 of the Public Procurement Code), fifty days for public health establishments and sixty for certain public enterprises (Article R. 2192-11 of the Public Procurement Code); for the balance of a works or design-management contract, the period runs from receipt of the final general statement of account (Article R. 2192-16 of the Public Procurement Code). Failing that, late-payment interest and a fixed allowance of 40 euros are due automatically (Article L. 2192-13 of the Public Procurement Code and Article D. 2192-35 of the Public Procurement Code).

These periods are calculated from precise dates: the sending of the rejection letter, notification of the urgent application to the buyer, receipt of the payment request. An uncertain date must be proved before acting.

Your documents

What to send, depending on your position

The date on which each document was sent matters as much as its content: it fixes the time limits that are still open.

Position A

Your application or bid has been rejected

  • Rejection letter with its date and method of sending, electronic or postal
  • Public tender notice, consultation rules and specifications
  • Your complete bid, including the technical statement and the price schedule
  • Request for price justification received, your reply and any exchange with the buyer

Position B

You are the contract holder and are awaiting payment

  • Deed of undertaking, special administrative clauses (CCAP) and the general administrative terms (CCAG) referred to
  • Payment requests, invoices and proof of their date of receipt
  • Service orders, acceptance records and draft final statement of account
  • Special subcontracting deeds and notifications of assignment of receivables

Do not leave a request for price justification unanswered: the bid may be rejected for insufficient justification, and the judge reviews this rejection only to a limited extent.

The firm also handles:

  • Public law
  • Administrative court
  • Administrative law
  • State liability

The method

How the firm supports you

Measure the time remaining, identify the relevant breach, choose the court and the claim.

Step 1

Date the rejection letter

The firm reconstructs the chronology of the consultation, the date on which the notification was sent and the date from which the buyer may sign.

Step 2

Identify the breach that causes harm

Information given to candidates, criteria and scoring method, abnormally low bid, conflict of interest: only a breach capable of having harmed the company opens the urgent application.

Step 3

Refer the matter to the judge and notify the buyer

The application is filed with the administrative court, then notified to the buyer in accordance with Article R. 551-1 of the Code of Administrative Justice, which triggers the suspension of signature.

Step 4

Quantify and recover

After the award or performance, the firm quantifies the loss from the wrongful exclusion or the receivable, the late-payment interest and the fixed allowance, then sends the prior claim or refers the matter to the judge in urgent proceedings for an interim payment.

A late or ineffective ground weakens the application. The urgent application is built on few breaches, chosen because they may have harmed the company, even indirectly by favouring a competitor.

The timetable

The chronology of a contested consultation

From the rejection letter to the judge's decision or to payment.

  1. Rejection letter

    Day 0. Note the date and method of sending; in a formal procedure, check that the reasons, the name of the successful bidder and the date from which signature is possible are stated.

  2. Request for reasons

    If the letter is incomplete or if the procedure was an adapted one, ask for the reasons, which are due within fifteen days of receipt of the request; the characteristics of the successful bid are due only if your bid was not rejected as irregular, unacceptable or inappropriate.

  3. Pre-contractual urgent application

    Before signature, refer the matter to the judge and notify the application to the buyer; signature is then suspended until the decision is notified.

  4. The judge's decision

    The judge rules in principle within twenty days and may not rule before the sixteenth day following the sending of the award decision, or the eleventh if it was sent electronically.

  5. Contract signed

    The contractual urgent application remains possible within thirty-one days of the award notice published in the OJEU or, for a contract based on a framework agreement, of notification of its conclusion; failing that, within six months of conclusion.

  6. Performance and payment

    Each payment request is in principle settled within thirty days of receipt, subject to the specific period applying to certain buyers or to the balance of works; beyond that, late-payment interest and the fixed allowance run automatically.

The checks

What the firm checks before acting

A poorly targeted action costs the company time and may be held against it.

  • Procedure followed: adapted, formal, negotiated or design contest, since the suspension period and the contractual urgent application depend on it.
  • Exact date: sending of the rejection letter, any signature of the contract, publication of an award notice.
  • Regularity of your own bid: completeness, reply to a request for justification, compliance with the specifications.
  • Breach connected with your exclusion: criteria, scoring method, the successful bidder's bid, the buyer's impartiality.
  • Quantified receivable: dated payment request, due date, amount of late-payment interest and of the fixed allowance.

Summary

Situation, evidence, response

Common situations of a company dealing with a public buyer.

Situation

Bid rejected, contract not yet signed

Decisive evidence: Dated rejection letter, consultation rules, bid submitted and analysis report if obtained.

Time limit: Before signature, which may in principle take place eleven days after the electronic sending of the rejection in a formal procedure.

Useful action: Pre-contractual urgent application, notified to the buyer to suspend signature.

Situation

Abnormally low bid rejected

Decisive evidence: Request for justification, detailed reply, price breakdowns, supplier quotes.

Time limit: To bring a pre-contractual urgent application, refer the matter to the judge before the contract is signed.

Useful action: Pre-contractual urgent application based on the buyer's manifest error of assessment.

Situation

Scoring that appears inconsistent

Decisive evidence: Published scoring grid, weighting of criteria and sub-criteria, scores obtained.

Time limit: To be checked as soon as the detailed reasons are received.

Useful action: Challenge a method that neutralises a criterion or a distortion of the bid, not the assessment of its value.

Situation

Contract signed during the suspension

Decisive evidence: Acknowledgement of receipt of the notification of the urgent application, date of signature of the contract.

Time limit: Thirty-one days after the award notice in the OJEU or the notification of a contract based on a framework agreement, six months failing that.

Useful action: Contractual urgent application seeking nullity, termination or a financial penalty.

Situation

Wrongful exclusion, contract performed

Decisive evidence: Ranking of bids, reasons for the exclusion, accounts allowing the lost margin to be quantified.

Time limit: Two months after the publicity measures for the contract in order to challenge its validity.

Useful action: Action challenging validity combined with a claim for damages.

Situation

Unpaid contract invoices

Decisive evidence: Payment requests, acknowledgements of receipt, reminders and statement of account.

Time limit: Interest is due from the day after the payment period expires, thirty days in principle.

Useful action: Quantified prior claim, then urgent application for an interim payment if the receivable is not seriously contestable.

Frequently asked questions

Your questions: public procurement

My bid has been rejected: what must the buyer's letter contain?

The rejection letter is not a mere formality. The buyer must notify its decision without delay to each rejected candidate or tenderer (Article R. 2181-1 of the Public Procurement Code). In a formal procedure, this notification states the reasons for the rejection; when it is sent after the award, it also gives the name of the successful bidder, the reasons that led to the choice of its bid and the date from which the buyer may sign (Article R. 2181-3 of the Public Procurement Code).

In an adapted procedure, the company obtains the reasons for the rejection on request, within fifteen days of its receipt; if its bid was not inappropriate, irregular or unacceptable, the buyer also communicates the characteristics and advantages of the successful bid and the name of the successful bidder (Article R. 2181-2 of the Public Procurement Code). In a formal procedure, the tenderer whose bid was not rejected on one of these grounds obtains, within the same period, the characteristics and advantages of the successful bid (Article R. 2181-4 of the Public Procurement Code).

A failure to provide information does not by itself lead to annulment. In a road works case, the Council of State held that late information, fifteen months after the call-for-tenders committee made its choice, was not in itself a breach, and that the reasons provided during the proceedings, sufficiently early before the order, deprived the ground of any effect; the company's application was dismissed (CE, 27 September 2024, No. 490697). The firm therefore first checks what is missing, then the time remaining to obtain it and make use of it.

What is the time limit for bringing a pre-contractual urgent application?

The pre-contractual urgent application must be brought before the contract is concluded (Article L. 551-1 of the Code of Administrative Justice). No fixed period runs from the rejection letter: the limit is signature. In a formal procedure, however, the buyer may sign eleven days after the rejection notice is sent, sixteen days if it was not sent electronically (Article R. 2182-1 of the Public Procurement Code), except for a contract awarded to the only operator that took part or a contract based on a framework agreement (Article R. 2182-2 of the Public Procurement Code). For a contract awarded in an adapted procedure, this minimum period does not apply and signature may be quicker.

Referring the matter to the administrative court is not enough to protect the company if the buyer is unaware of it. The person bringing the action must notify the contracting authority, the notification being deemed made on receipt (Article R. 551-1 of the Code of Administrative Justice). From the moment the matter is referred, the contract may not be signed until the judge's decision is notified (Article L. 551-4 of the Code of Administrative Justice).

The Council of State has clarified that the suspension runs from receipt of a fax or an email sent to the competent department, even outside opening hours. A local authority that had signed on the very morning of such a communication was ordered to pay a penalty of €10,000 (CE, 27 May 2020, No. 435982). The firm therefore prepares the application and its notification together, for sending on the same day.

What can the company obtain from the judge in pre-contractual urgent proceedings?

The judge may order the buyer to comply with its obligations, suspend the performance of any decision relating to the award, annul those decisions and strike out irregular clauses or requirements intended to appear in the contract (Article L. 551-2 of the Code of Administrative Justice). The judge rules in principle within twenty days and may not rule before the sixteenth day following the sending of the award decision, reduced to the eleventh day where it is sent electronically to all operators (Article R. 551-5 of the Code of Administrative Justice).

Annulment generally applies to the procedure from the stage at which the breach arose. In the Colas France case, the Council of State annulled the rejection of the bid and the procedure at the bid analysis stage, ordering the buyer to resume it at that stage if it intended to proceed (CE, 9 October 2026, No. 514694). In the Experis case, the procedure was annulled from the examination of applications, with an obligation to exclude the competitor in a conflict of interest (CE, 3 April 2026, No. 510005).

The judge does not award the contract to the applicant company and grants no compensation in this context. Only a company that had an interest in concluding the contract and is likely to be harmed by the breach may bring the action (Article L. 551-10 of the Code of Administrative Justice). The firm therefore formulates claims limited to what the judge can order, and reserves the question of damages for another procedure.

My bid was rejected as abnormally low: can it be defended?

An abnormally low bid is one whose price is manifestly underestimated and likely to jeopardise proper performance of the contract (Article L. 2152-5 of the Public Procurement Code). Before rejecting it, the buyer must require clarifications and justifications (Article L. 2152-6 of the Public Procurement Code). The justifications may relate to the method of performance, technical solutions, exceptionally favourable conditions or the originality of the bid (Article R. 2152-3 of the Public Procurement Code).

The defence is prepared from the request for justification. In the Colas France case, the buyer relied mainly on comparison with the other bids, without producing the basis of its estimated bills of quantities, whereas the company had broken down the prices queried and produced quotes: the Council of State held the rejection to be vitiated by a manifest error of assessment and annulled the procedure at the bid analysis stage (CE, 9 October 2026, No. 514694).

The opposite outcome is also possible. In the Eurofins case, prices three to four times lower than those of the same company a few years earlier were justified only by a pooling of collection rounds held to be ineffective; the Council of State upheld the rejection of the bid and dismissed the company's application, recalling that the urgent applications judge reviews only for manifest error (CE, 23 December 2025, No. 507574). The firm helps the company to reply point by point, with quantified and verifiable price breakdowns.

Can the judge review the score given to my bid?

No, not as such. The buyer may define its scoring method for each of the published criteria. The judge in pre-contractual urgent proceedings does not rule on the assessment of the value of a bid or on the respective merits of the bids, which rules out a simple discussion of the scores obtained (CE, 24 November 2023, No. 473674).

Two grounds remain useful. First, a scoring method is irregular if the elements taken into account have no connection with the criteria, or if the way those elements are combined deprives the criteria of their effect or neutralises their weighting. Second, the judge checks that the buyer has not distorted a bid by disregarding or manifestly altering its terms. The Council of State set out these rules in a case concerning self-service bicycles in Saint-Malo, where it annulled the order that had reconstructed the technical score of the excluded bidder, then dismissed its application: scores with decimals reflecting verbal assessments on a five-point scale did not, in themselves, make the method irregular (CE, 24 November 2023, No. 473674).

Criticism of a scoring therefore requires the grids, the weighting of the sub-criteria and the analysis report. The firm relies on this ground only where a precise discrepancy between the bid and its scoring can be demonstrated, with supporting documents, and where it may have harmed the company, even indirectly by favouring a competitor, which is what the judge in pre-contractual urgent proceedings looks for (CE, 23 December 2025, No. 507574).

My own bid was irregular: can I still act?

The buyer rejects irregular, unacceptable or inappropriate bids (Article L. 2152-1 of the Public Procurement Code). A bid is irregular if it does not comply with the requirements of the consultation documents, in particular because it is incomplete, or if it breaches the applicable legislation (Article L. 2152-2 of the Public Procurement Code).

The rule has a useful exception. In a cleaning contract in Martinique, the judge in contractual urgent proceedings had refused to examine the irregularity of the successful bidder's bid on the ground that the applicant's bid was itself irregular. The Council of State overturned this reasoning: the irregularity of the excluded competitor's bid does not prevent it from relying on that of the successful bidder, in particular where it stems from an abnormally low price. It annulled the lot concerned, whose price was more than 60 % below the buyer's estimate (CE, 27 May 2020, No. 435982).

The firm therefore first checks the regularity of the company's bid, then that of the successful bid. Where both pose a difficulty, the irregularity of the successful bidder can still be invoked, alongside the other grounds that the judge in contractual urgent proceedings may penalise, such as a signature made during the suspension (Article L. 551-20 of the Code of Administrative Justice).

The contract has already been signed: is a contractual urgent application still possible?

Once the contract has been concluded, the judge in contractual urgent proceedings may be seised (Article L. 551-13 of the Code of Administrative Justice). This route is not open to a company that has already brought a pre-contractual urgent application where the buyer respected the suspension and complied with the decision given (Article L. 551-14 of the Code of Administrative Justice). It must be brought no later than the thirty-first day following publication in the OJEU of an award notice or, for a contract based on a framework agreement or a dynamic purchasing system, notification of its conclusion; failing that, within six months from the day after conclusion (Article R. 551-7 of the Code of Administrative Justice).

The judge declares the contract null where the required publicity or publication in the OJEU was entirely absent, and in certain cases of premature signature that deprived the company of the pre-contractual urgent application and affected its chances (Article L. 551-18 of the Code of Administrative Justice). Where the contract was signed before the required period expired or during the suspension, the judge may also terminate it, shorten its term or impose a financial penalty (Article L. 551-20 of the Code of Administrative Justice).

The sanctions linked to premature signature presuppose that the suspension period applied; nullity for lack of required publicity does not depend on it (Article L. 551-18 of the Code of Administrative Justice). The Council of State dismissed an architect's action against a design-management contract concluded after a restricted contest, that contract not being subject to the period in Article R. 2182-1, even though the municipality had set itself a period that it did not observe (CE, 13 March 2025, No. 498701). The firm therefore first checks the applicable procedure.

How can the validity of a public contract be challenged after signature?

Beyond the contractual urgent application, the excluded competitor may bring a full-jurisdiction action before the contract judge challenging the validity of the contract or of certain severable clauses, where appropriate combined with claims for damages. This action must be brought within two months of appropriate publicity measures, in particular a notice stating the conclusion of the contract and how it may be consulted (CE, 19 July 2023, No. 465308).

Without sufficient publicity, the action remains subject to a reasonable period from the time the contract became known. In the Seateam aviation case, the Council of State confirmed that an action brought almost five years after an award notice stating the subject of the contract and the parties was out of time, the court having applied a period of one year (CE, 19 July 2023, No. 465308). The company's application was dismissed.

The grounds are limited. Apart from defects of public policy, the excluded competitor may rely only on breaches of the award rules directly related to its exclusion. The Council of State nevertheless overturned a court that had dismissed, for a company whose bid was regular, the complaint based on the irregular performance periods in the successful bidder's bid: that breach was directly related to the exclusion (CE, 21 July 2022, No. 456472). The firm selects grounds with regard to that link.

Can damages be obtained after a wrongful exclusion?

Yes, where the irregularity of the procedure directly caused the loss. The judge first examines whether the candidate had no chance at all of winning the contract: in that case, no compensation is due. Otherwise, the candidate is entitled to reimbursement of the costs of preparing the bid. If the candidate had a serious chance of winning the contract, it is compensated for its loss of profit, which includes those costs, unless the buyer abandons the contract for a reason of general interest (CE, 2 December 2019, No. 423936).

The loss of profit must be certain. For a catering contract concluded for twelve months, renewable twice, the Council of State limited the compensation to the initial period, possible renewals not being certain; the award was reduced to 66,666.66 euros (CE, 2 December 2019, No. 423936).

The assessment of chances is concrete. In the Vert Marine case, a court had held that the company had no chance at all because of the lower value of its bid and its reservations about the project. The Council of State annulled that judgment: once the successful bidder's irregular bid was set aside, that of Vert Marine, whose regularity was not disputed, was the only one left (CE, 12 February 2026, No. 501708). The firm reconstructs the ranking and quantifies the margin from the company's accounts.

Can a conflict of interest on the buyer's side lead to annulment of the procedure?

Yes. The buyer may exclude a candidate whose application creates a conflict of interest that cannot be remedied by other means. A conflict of interest exists where a person who takes part in the procedure, or may influence its outcome, has a financial, economic or personal interest likely to compromise their impartiality or independence (Article L. 2141-10 of the Public Procurement Code).

The Council of State applied this to a framework agreement for IT services. The managing director of the buyer's project-management support company was the spouse of the head of one of the tenderers. That company had visited the candidates' premises and read the bids. The judge found a conflict of interest, held that the failure to exclude was a breach likely to harm the competitor, annulled the procedure at the examination of applications and ordered the exclusion of the tenderer concerned (CE, 3 April 2026, No. 510005).

Other exclusions are possible, for example against a company that, during the previous three years, had to pay damages or was penalised by termination for a serious or persistent breach of its obligations in performing an earlier public procurement contract (Article L. 2141-7 of the Public Procurement Code). The firm examines these links from public documents and information obtained in the procedure, without speculation about individuals.

The public buyer pays late: what interest and allowance can be claimed?

The period provided for in the contract may not exceed the regulatory period (Article L. 2192-10 of the Public Procurement Code), set at thirty days in principle (Article R. 2192-10 of the Public Procurement Code), at fifty days for public health establishments and at sixty days for certain public enterprises (Article R. 2192-11 of the Public Procurement Code). This period runs in principle from receipt of the payment request by the buyer or, depending on the contract, by the project manager (Article R. 2192-12 of the Public Procurement Code); for the balance of a works or design-management contract, it runs from receipt of the final general statement of account (Article R. 2192-16 of the Public Procurement Code), and it may be interrupted once if the request is incomplete or incorrect (Article R. 2192-27 of the Public Procurement Code).

From the day after the due date, the delay automatically triggers late-payment interest and gives entitlement to a fixed allowance for recovery costs (Article L. 2192-13 of the Public Procurement Code). The rate is that of the European Central Bank's most recent main refinancing operations, in force on the first day of the calendar half-year in which the interest began to run, plus eight percentage points (Article R. 2192-31 of the Public Procurement Code). Interest runs until the principal is paid (Article R. 2192-32 of the Public Procurement Code) and the fixed allowance is 40 euros (Article D. 2192-35 of the Public Procurement Code).

The firm calculates interest invoice by invoice.

How can a sum owed by the public buyer be obtained quickly?

The urgent applications judge may award an interim payment to the creditor, even without a claim on the merits, where the existence of the obligation is not seriously contestable; the judge may make payment subject to a guarantee (Article R. 541-1 of the Code of Administrative Justice). This route suits an accepted invoice, a settled balance or late-payment interest calculated on undisputed dates.

An application seeking payment of a sum of money is in principle admissible only after the administration has made a decision on a prior claim; the two-month time limit for challenge does not apply to measures taken to perform a contract (Article R. 421-1 of the Code of Administrative Justice). The prior claim must therefore be sent and quantified before any referral to the court on the merits.

In a works contract, the closing of accounts follows the provisions of the CCAG to which the contract refers. Under the 2014 CCAG Works, the Council of State held that a tacit general statement of account could not arise if the draft final statement had been sent only to the project owner, without transmission to the project manager; the company's appeal on a point of law was dismissed (CE, 25 June 2018, No. 417738). The firm checks the applicable version of the CCAG and the recipients of each communication before arguing that a receivable is established.

Subcontractor on a public contract: who pays and before which court should action be brought?

A direct subcontractor that has been accepted, and whose payment terms have been approved by the buyer, is paid directly by the buyer for the part of the contract it performs, and any waiver of this direct payment is deemed unwritten (Article L. 2193-11 of the Public Procurement Code). The direct payment threshold is set at 600 euros including all taxes, except for certain defence contracts (Article R. 2193-10 of the Public Procurement Code).

The choice of court is decisive. The Court of Cassation has held that "disputes relating to the direct payment to the subcontractor, by the delegated project owner, of the price of works carried out under a public works contract, which, not concerning the performance of a private-law agreement between the parties, require an assessment of the conditions in which a contract for the carrying out of public works was performed, fall within the jurisdiction of the administrative court" (our translation) (Cass. 3e civ., 25 April 2024, No. 22-22.912); it declared the judicial courts to lack jurisdiction over the subcontractor's claim.

The assignment of receivables follows a distinct rule. Notification of an assignment or pledge under a public contract is sent to the public accountant responsible for payment named in the contract (Article R. 2191-55 of the Public Procurement Code), in the form laid down by Article R. 313-17 of the Monetary and Financial Code (Code monétaire et financier). The Court of Cassation holds that the latter provision "applies only to assignments of receivables held against public-law legal entities" (our translation) (Cass. 3e civ., 8 December 2021, No. 20-16.152); as the assigned debtor was the main contractor, the assignment did not have to be notified to the accountant, and that company's appeal on a point of law was dismissed.

A rejected bid or an unpaid contract? Take stock today.

Send the rejection letter, the consultation rules or the payment requests left unanswered: the firm identifies the route still open and the time limit to meet.

The latest news.

What our clients say

4,9289 Google reviews
kader ladjouzi
1 month ago

Best real estate law and business law lawyer in Paris. A humane and attentive lawyer, with a wonderful team. Thank you, Maître KOHEN

Translated from French

Janou SAMUEL
2 months ago

Thank you to Maître KOHEN for his analyses of recent case law on fraudulent non-disclosure in property sales. It reassures me about an action for annulment that I am considering after buying a house affected by serious defects intentionally concealed by the seller and not reported by the estate agent; also defects (rising damp) characterised by spreading through-cracks and damp stains, not reported by the estate agent… Worse, defects concealed by the latter or at his instigation, under a coat of paint and by polystyrene tiles glued to the ceiling of a bedroom. And the said estate agent drafted the preliminary contract, which of course contains no information about any of these defects. Just to add that, being 77 years old and suffering from cognitive impairment, I am certain that the estate agent thought I would not be able to discover the deception and above all to establish the fraudulent intent, still less to bring legal proceedings given the complexity and length of the procedure... That is why I am opting for the criminal route, insofar as the intentional concealment of the defects by the seller and then by the estate agent amounts to the fraudulent manoeuvres of art. 313-1 of

Translated from French

Paul MALIK (powlo)
5 months ago

Maître Reda KOHEN assisted me in a dispute concerning a sale agreement with a defaulting party. He provided professional and responsive support, and I highly recommend him.

Translated from French

Rayan Kallout
6 months ago

I highly recommend Maître Reda Kohen. Thanks to his explanations, I was able to recover my security deposit in a situation that seemed blocked. He was responsive, clear, and very professional. A big thank you for his invaluable help!

Translated from French

Naji Jouahri
6 months ago

Excellent support from Maître Kohen in a case combining business law and real estate law. Clear legal analysis from the first meeting, right through to the hearing. Professional and accessible lawyer, I highly recommend his firm in Paris 17.

Translated from French

Halim Tunde
6 months ago

Maître Kohen assisted me in recovering unpaid debts from a defaulting tenant. Procedure mastered from start to finish, from the payment order to eviction. Human, attentive, and always reachable. Thank you for your work.

Translated from French

Cha
6 months ago

As a young student living in an apartment, my landlord tried to make me leave my accommodation even though he had sent me no termination notice. I therefore contacted Mr. Reda Kohen to help me as I couldn’t handle the situation alone. In just 3 days everything was resolved, Maître Kohen defended me and accompanied me with an irreproachable level of commitment and efficiency. I can only recommend his professionalism!

Translated from French

Asmaa Maazaz
7 months ago

I turned to Maître Kohen for a complex real estate dispute and I highly recommend his firm. He is very professional; he thoroughly analyzed my case from the very first appointment and clearly explained the possible options. Thanks to his expertise, we achieved a very favorable outcome. Responsive, a good teacher, and committed, he is a lawyer you can truly trust. Yours faithfully, Miss Maazaz

Translated from French

Contact Mobile
6 days ago

Very satisfied! I would like to thank Maître Esther Cornu here, who managed to resolve a very complicated dispute in a divorce and family law matter...Thanks to Maître Cornu, a judgment was handed down in my favour even though it was far from a foregone conclusion...So I recommend this law firm

Translated from French

Claude Frasson
1 week ago

A precise and concrete analysis and an immediate response. Excellent.

Translated from French

Basel Alali
1 week ago

I highly recommend this lawyer for his professionalism, honesty, and transparency. He helped me successfully and guided me through the process with great care and expertise. What I particularly appreciated was his honest approach and the fact that he recommended practical, cost-effective options instead of immediately pushing for the most expensive solution. He genuinely focused on finding the right approach for my situation. I’m very grateful for his support and would definitely recommend him to anyone looking for a trustworthy and professional lawyer in France.

beatrice lefevre
1 week ago

Thank you for this detailed, precise help, with a proposal at the end on whether or not to continue (very quick response as well)

Translated from French

Jean-pierre Steinmetz
2 weeks ago

Very good advice given by Maître Cornu during our meeting on 16 October.

Translated from French

John Roberts
2 weeks ago

Very professional and responsive service. The lawyer quickly and carefully checked the validity of my wife’s residence permit in light of a specific legal regime. His work gave us clarity, whereas the usual administrative procedures were long and ambiguous. I appreciated his efficiency and professionalism, and I recommend his services.

Translated from French

Jean-François PAPA
3 weeks ago

I would like to warmly thank Maître Esther Cornu for her professionalism, her availability and the quality of her support. In a case of particular importance for my professional future, she showed great responsiveness, rigour and a gift for explaining things, taking the time to answer my questions precisely and to explain the various legal steps to me. I particularly appreciate the clarity of her analyses, her seriousness and her commitment in following up my case. Many thanks to Maître Esther Cornu for listening and for her support. I highly recommend!

Translated from French

Hamid Agouz
3 weeks ago

I was pleasantly surprised by the responsiveness of Mr Reda Cohen, who took the time to answer my questions about my case instantly. It has become so rare these days to find a lawyer who is so available, responsive and attentive, even when it is simply a matter of answering questions. His answers are clear, precise and reassuring. You can tell that he takes the time to understand the situation and to provide relevant answers. Beyond his excellent ratings on Google, it is above all this availability and this seriousness that make the difference. Many thanks to Mr Reda Cohen for his professionalism and his responsiveness. I highly recommend!

Translated from French

Sandra Imbert
3 weeks ago

A huge thank you to Maître Esther Cornu from Kohen Avocats for her support during a particularly difficult time. Her attentiveness, empathy, and humanity touched me deeply. She was able to answer my questions with clarity and sensitivity, while demonstrating great professionalism and fully respecting the confidentiality of the case. Beyond her professional qualities, I met a deeply humane lawyer whose support made a real difference. I sincerely recommend her.

Translated from French

Мария Двирник
1 week ago
Moula Brahimi
1 week ago

Good experience. And good work, thank you for everything.

Translated from French

Faiza Traduction
1 week ago
Alain Arsaut
2 weeks ago

Saw Hassan on the TV news

Translated from French

Beaudrique Abao
2 weeks ago
Krep Events Traiteur Breton
3 weeks ago

very clear article

Translated from French

TOULEIMAT HACHEM
3 weeks ago