By Reda Kohen, lawyer admitted to the Paris Bar
A business tenant in England, United Kingdom, should trace the full route of an electric vehicle charging cable before ordering equipment or booking installation. A parking space assigned to the tenant may sit outside the leased premises. Even when the space is included, the proposed cable may pass through a shared wall, a plant room or a car park that the landlord controls. A plan showing the bay alone will rarely answer who can authorise the work or who will need access once the charger is in use.
The search term “electric vehicle” drew interest in the United Kingdom. The discussion that follows gives general information about English law for business premises. It considers a tenant that wants to put a charger in a shared commercial car park, either for its own vehicles and staff or for a wider group of users. The same project raises separate questions about the tenant’s property rights, the building work and the proposed equipment. An approval for one part of the project can leave another unresolved.
The starting documents are the signed lease, the parking plan and any separate parking agreement. Put those alongside a drawing from the proposed installer, from the supply to the bay. That comparison shows where permission may be needed and gives both sides a basis for agreeing who pays, who maintains the equipment and what happens when the tenant leaves.
I. What can the tenant authorise in a shared car park?
A. Trace the bay, the cable route and the supply
Start with the description of the premises in the lease and the plan it incorporates. A unit and two bays may be leased together. A different lease may give the tenant a right to park in two spaces anywhere in a shared car park. Some sites use a separate parking licence or allocate bays through an estate manager. The distinction matters even if the same vehicles have parked in the same places for years. Read whether the lease identifies fixed bays, whether management can reallocate them and whether the parking document ends at the same time as the lease. A charger fixed beside a numbered bay can become unusable to the tenant if the tenant later has to park elsewhere.
Ask for a drawing that shows the intended placement of the equipment, the source of the supply and the parts of the site the cable needs to cross. Mark each change of control. In a multi-let building the cable might leave the tenant’s unit, pass along a retained wall, enter a shared distribution room and cross a section of pavement before reaching the charger. The people who can approve work on each of those areas may be different. The drawing should also show the cabinet or meter, where an installer would need to dig or drill, and where someone would stand to service the equipment. Give the plan a date and a version number so that everyone can agree to the same route.
Compare that route with the lease provisions on alterations, service media, access and signage. Read the definitions and schedules as well as the tenant’s obligations. A clause about internal alterations may tell the tenant little about cutting into a shared surface. A right to use existing ducts may describe a different activity from opening a new trench or installing a new duct. A right to enter a shared car park to reach the premises may say nothing about access for a repair crew or about bringing a lifting vehicle onto the site. For each segment, record the provision or written permission on which the design depends. If the documents leave a segment unresolved, ask who controls it before treating the route as agreed.
Check who can give the approval. An immediate landlord may itself occupy under a headlease. The estate manager may arrange access for contractors while a separate owner controls permanent works. The installer can explain whether a proposed connection is technically feasible. Its quote will usually leave the property’s contractual approvals unaddressed. Where the landlord’s reply refers to consent from a superior landlord or another party, record exactly which part of the proposal that consent covers and ask who will obtain it. Early confirmation can save the cost of moving a planned charger after the chosen cable route has already been priced.
A shared car park gives a simple illustration. A tenant has the exclusive use of two bays. A cable from the tenant’s meter would reach those bays only by crossing a route used by delivery vehicles. Another design starts from a communal supply and would need a separate metering arrangement. The first option may be easier to account for each month but harder to build and repair. The second raises questions about reserved capacity, how the landlord measures electricity and who can access the meter. The lease and a route plan help the parties choose which of those questions they can resolve. A distance shown on a quote cannot settle them.
The site plan may need to be read against a later parking allocation or licence for alterations. Compare the dates and check which document the parties signed. If a past consent shows a duct location, ask whether later works moved or blocked the duct. Keep the proposed drawing separate from the record of what was actually installed. A facilities team taking over the building should be able to trace the equipment from the bay to its isolator without guessing from a faded label. For property matters in Paris, see the firm’s Paris real estate practice. The commercial parking and building requirements discussed here concern England.
B. Specify what the permission covers once the charger is working
Distinguish permission for the physical work from the continuing arrangements for using the charger. The first can identify the drawing, working area, contractor, reinstatement of surfaces and inspection when work finishes. For the second, describe the users, hours, operator, supply and maintenance access. If a charger is to serve two tenants, identify who may occupy the bays while charging and how each business obtains access. If another tenant might later join, say who can agree the change and what work or extra capacity it would require. These provisions matter even at a site where the installation itself takes little time.
In a written consent or licence, identify who bears the cost of each part of the work. Separate the price of the unit from surveys, cabling, groundworks, changes to the supply and making good the car park. An installation quote may take for granted that a duct is clear and a supply is available. If a survey shows the duct is blocked, decide who can approve a different route and who bears the extra cost before the installer proceeds. Where the project depends on a shared electrical supply, specify the power available to the charger and who manages the arrangements if a second charger or another load is added. Record the points on which the parties are relying before they sign a non-refundable order.
The charging arrangements also need to work on an ordinary day. Decide who can take the equipment out of service, who investigates a fault and who pays to repair a surface opened for access to the cable. Where a landlord invoices the tenant for electricity, describe the readings or other agreed basis used to calculate the charge. Agree who can see those figures and how a disputed bill will be checked. If a charging operator supplies access through an account, find out who controls that account and how it would be transferred. A tenant that paid for a charger may still depend on estate staff for access to a locked plant room. Identify who can admit a maintenance contractor when those staff are unavailable.
Plan for the end of the lease while the route is still easy to change. The parties can discuss whether the charger stays, which brackets or bollards come out and whether they want to retain the underground cable or duct. If the equipment is to stay, record who takes over the maintenance arrangements and who holds the manuals and approvals. If removal is expected, identify the isolation point and the area to be repaired. Work out whether the removal would need to interrupt supply to anyone else. If the lease already specifies a reinstatement process, read the proposed consent against it and resolve any difference before the work begins. Keep one consistent set of documents for the people who will implement it.
Consider an occupier with only eighteen months left on its lease. A charger installed beside its office may make sense if another occupier can take it over, or if the landlord agrees in writing to keep the installation. Moving the same unit to a new building could involve new connection work and leave a trench or base behind. The choice goes to the financial case for installation as well as the consent. A schedule that allocates the equipment, keys, records, repair costs and any removal work lets the tenant and landlord compare realistic options while they can still change the design.
II. Which charging rules affect the work and equipment?
A. Check what the English building regulations require on this project
For building work in England, the relevant charging provisions are in Part 9B and Part S of Schedule 1 to the Building Regulations 2010. These provisions entered the regime through the Building Regulations etc. (Amendment) (England) Regulations 2021, which came into force on 15 June 2022 and apply in relation to buildings and building work in England. Use the consolidated regulations to check the current requirements. Begin by asking whether the charging work is part of a new building or a wider renovation and which parts of the site are included in that work. At an existing property, a tenant fitting one charger and a landlord renovating the whole building may be concerned with different parts of the same design.
Paragraph S4 of Schedule 1 deals with a new building that is neither residential nor mixed-use. Where the new building has more than ten parking spaces in the circumstances set out in regulation 44G, the provisions cover access to a charge point and provision for future charging through cable routes. The usual S4 calculation is one space with access to a charge point and cable routes for at least one fifth of the remaining spaces. Regulation 44G has specific rules for covered car parks and the order in which outdoor spaces are considered. Establish the site boundary and draw the outdoor and covered spaces separately before applying the rules. The building-wide count can differ substantially from the number of bays mentioned in an individual lease.
Paragraph S5 and regulation 44H deal with major renovation of an existing building that is neither residential nor mixed-use. Regulation 44K defines major renovation by reference to renovation of more than a quarter of the surface area of the building envelope. The envelope includes features such as the walls, floor, roof and windows. A large bill for interior works gives no measure of how much of that envelope is being renovated. The regulation also asks whether the project involves specified work to a car park or its electrical infrastructure, or to the electrical infrastructure of a building with an internal car park. Check whether there will be more than ten spaces within the site boundary on completion. Obtain the floor plans, the relevant scope of works and the completion layout before classifying the project.
The renovation rule also considers the cost of the required charge point and cable routes against the total renovation cost. Where the charging and routing cost exceeds seven per cent of that total, regulation 44H(3) exempts the building from the requirement to install the charge point and provides for a reduced cable-route obligation, subject to the cost condition it sets for those routes. It also matters whether all the spaces are covered. In practice, get separate figures for the charge point, the routes and the wider renovation. A single bundle of prices can hide which element drives the comparison. Ask the project team for the calculation and the car park drawing it used. A later change to the scope or location can change the inputs.
A cable route has a particular meaning in regulation 44K. It provides a route from the supply to the intended position for cabling to be installed later. A route identified in the building’s records therefore calls for a practical follow-up. Check whether it exists where shown, whether it is available to this tenant and whether it can support the proposed installation. The technical standards in regulation 44J specify, for the charge points covered by Part 9B and Part S, a dedicated circuit, reasonable output for the intended parking spaces and compatibility with the vehicles that may require access. Ask for confirmation of the actual circuit and access arrangements for the proposed bay.
A site with flats above commercial units should be checked under the mixed-use provisions in regulation 44I and paragraph S6 instead of using the non-residential calculation across the entire site. Identify which spaces serve the dwellings and which serve the commercial premises. A label on the estate plan may be insufficient where residents and business visitors use some of the same spaces. Once the building team identifies what the project must provide, return to the lease to check whether the tenant can use the designated bay, where its installer may work and who is expected to fund the particular installation. The building provisions address the infrastructure the work must deliver. The property documents identify the rights and obligations of the particular occupier.
B. Decide who can use the charger and what evidence to retain
For an ordinary workplace charger bought for use in England, check the Electric Vehicles (Smart Charge Points) Regulations 2021. They came into force on 30 June 2022 and regulate the sale of relevant charge points. Regulation 3 sets the scope for units intended to charge cars or vans and excludes, among other categories, public charge points and rapid charge points as defined there. Use the specification of the actual unit rather than relying on the supplier’s description of it as a business charger. The proposed users matter to the classification, as does the power the unit can deliver. Separately, identify which party will buy the device if the installer, tenant and landlord are entering different contracts.
For a relevant unit, regulation 13 requires a statement of compliance to accompany the sale. It identifies the model or type and gives details of the seller, among other information. The regulation also provides for a technical file and requires a copy to be supplied if the person to whom the unit was sold asks for it. Match the statement to the model on the order and the unit delivered. If a contractor buys the device for a wider project, discuss how the tenant and landlord will receive the paperwork and how a later operator can obtain it. Keep the declaration with the site plan, equipment details and handover records so that procurement and property teams can refer to the same model.
If the plan is to let customers charge while they visit the site, examine the definition in the Public Charge Point Regulations 2023, which came into force on 24 November 2023. Regulations 2 and 3 ask who the charger is primarily intended for and provide specific inclusions and exclusions. The rules can include a point in a public car park even if the car park is limited to people buying particular goods or services. The workplace exclusion concerns use solely by employees and contractors at their workplace or by workplace visitors other than people intending to purchase goods or services. Restricted hours on their own do not settle the question. Compare the written access policy with the site signs and the people who will actually be allowed to use the unit.
The classification affects who needs to plan for operating obligations. Regulation 4 of the 2023 Regulations distinguishes the application of regulations 5 to 10 from that of regulation 11, and regulation 11 sets requirements for showing the price of public charging. The definition of operator covers the owner or a person operating the charger on the owner’s behalf. Before opening an existing workplace unit to customers, identify who will run it, which provisions apply to that arrangement and whether the consent allows that use. A change in users can also affect the lease discussions about access, queuing and signage, even if the charger hardware stays in the same position.
For example, a business park may want two bays for staff vehicles on weekdays and public charging for shoppers at other times. A label describing the equipment as a workplace charger does not answer who it is intended to serve. Give the operator the proposed hours and user groups before agreeing to a hardware model or setting a date to open it. Ask who can amend the access settings and how the parties will approve a later change. If a separate public operator is to take over, agree who can use the shared land and for how long. Check the dates against the occupier’s lease and what the operator will need when the occupier leaves.
Keep a file that a successor can use. It can contain the signed consent, its approved route drawing, the final installed route, the party responsible for the supply, the paperwork for the unit and the agreed access policy. Put the handover process in the file as well, including who controls keys, meter access and operator accounts. If the project later changes from employee-only to customer charging, save the revised approval and assessment alongside the original. That record helps a new facilities manager establish whether a proposed change concerns the permissions, the operating arrangements or both.
Conclusion
For a business tenant in England, the first decision is whether the lease and any separate parking document support the bay, cable route and continuing access that the charger will need. Plot each of them on the same drawing. Where the work crosses shared land or uses a communal supply, identify who controls that part of the project and settle the written arrangements before ordering the installation. Include costs, meter access, repair and what happens to the equipment at the end of the lease.
Check the linked building provisions against the actual work, especially where a major renovation or a new building brings several parking areas into the calculation. For the equipment, establish who will use it and who will operate it. Use those answers to decide which purchasing evidence and operating arrangements are required. Those steps give the tenant and landlord a common record of the installation they agreed to and the features they may have to revisit if the site changes.