You bought a stone house in the Dordogne after a full renovation, or a newly refitted flat in the 17th arrondissement of Paris. The builder handed over the keys, you paid the final invoice from London or New York, and for a few months everything gleamed. Then autumn arrives: damp patches spread across the living-room wall, the brand-new boiler keeps cutting out, the electric shutters jam halfway, and the bathroom tiling sounds hollow underfoot. The builder answers politely that he is very busy, then stops answering at all. Most foreign owners in this position either give up and pay another tradesman, or threaten a lawsuit they are not equipped to bring. Both reactions waste two of the strongest weapons French construction law gives you: the one-year perfect-completion guarantee and the two-year equipment guarantee. This guide explains how each one works, what the acceptance inspection changes, and how an owner who lives abroad can still enforce them before the clocks run out.
Two preliminary points frame everything. First, the deadlines examined below run from a single event, the réception (formal acceptance of the works), whether written down or merely implied by your behaviour — the one-year guarantee runs one year from acceptance under article 1792-6 of the Civil Code and the equipment guarantee at least two years from acceptance under article 1792-3. Second, these guarantees concern works ordered for a building — a renovation, an extension, a new house built under a works contract — and they sit alongside, not inside, the ten-year structural warranty and the hidden-defects regime that apply when you simply buy an existing property. Readers disputing defects with a builder, an architect or a renovation company in Paris can also turn to our Paris real estate law team for construction and renovation disputes for advice on their file.
I. The one-year perfect-completion guarantee: your snagging year
During the first year after acceptance, the builder owes you the broadest and simplest of all French construction guarantees. It covers practically every defect you can see or discover, with one procedure and one sanction. Foreign buyers lose it most often for a single reason: they trigger the starting event without realising it, then let the year expire while negotiating politely.
A. The acceptance inspection that starts every clock
Acceptance is the legal act that closes the works phase and opens the guarantees phase. Article 1792-6 of the Civil Code defines it in one sentence: “La réception est l’acte par lequel le maître de l’ouvrage déclare accepter l’ouvrage avec ou sans réserves.” In plain English, acceptance is the act by which the project owner — you, the maître de l’ouvrage (person who commissioned the works) — declares that you accept the works, with or without a snag list. Everything depends on how carefully that moment is handled.
In practice, acceptance takes the form of a walk-through inspection ending in a signed procès-verbal de réception (acceptance report). List every visible defect in that report as a réserve (reservation): a cracked tile, a door that does not close, paint splashes, a missing seal, a radiator that stays cold. Be exhaustive rather than polite, because the official guidance of the French administration warns that an apparent defect you fail to record is treated as accepted and can no longer be claimed under the guarantees, while defects invisible at the time remain claimable according to their nature; the English-language page on post-works guarantees at service-public.gouv.fr: guarantees after receipt of the works states the rule in exactly those terms. Never sign a blank or pre-filled report, never accept the sentence “no visible defect” dictated by the builder while you are rushing to catch a flight, and bring someone competent with you — an architect, a surveyor, or at minimum a friend who has done works before and photographs everything with dates.
The trap for absent owners is that acceptance does not need a signature. French courts recognise tacit acceptance where the owner moves in and pays the full price, treating that combined behaviour as an unequivocal decision to accept. On 12 November 2020 the Third Civil Chamber of the Court of Cassation approved judges who had fixed tacit acceptance at the date when taking possession and full payment came together, holding that “elle a pu en déduire que la réception tacite résultait de la prise de possession jointe au paiement intégral”, which means the court could properly deduce tacit acceptance from taking possession combined with payment in full: Cass. 3e civ., 12 Nov. 2020, No. 19-18.213. For a foreign buyer, the scenario writes itself: you transfer the balance from abroad before travelling, collect the keys on arrival, sleep in the house — and the one-year clock has started without a single defect recorded. To keep control, inspect before you pay the balance, record reservations at that inspection, and make any final payment refer expressly to the signed report. Where the builder refuses a joint inspection, acceptance can be sought in court, because the same article provides that acceptance takes place at the request of the most diligent party, amicably or failing that judicially.
Once acceptance exists, with or without reservations, defects discovered afterwards must be notified in writing during the guarantee year. Keep every notification as a lettre recommandée avec accusé de réception (registered letter with signed return receipt), sent to the builder’s business address and, where one was appointed, copied to the architect. Emails and telephone calls help the relationship; only the registered letter proves the date if the file goes to court.
B. Making the builder come back: notice, deadline, self-help
The one-year guarantee, the garantie de parfait achèvement (perfect-completion guarantee), obliges the builder to repair every defect you flagged at acceptance and every defect that appears during the year after. Article 1792-6 of the Civil Code states its scope as follows: “La garantie de parfait achèvement, à laquelle l’entrepreneur est tenu pendant un délai d’un an, à compter de la réception, s’étend à la réparation de tous les désordres signalés par le maître de l’ouvrage, soit au moyen de réserves mentionnées au procès-verbal de réception, soit par voie de notification écrite pour ceux révélés postérieurement à la réception.” In other words, the builder is bound for one year from acceptance to repair all defects, whether listed in the acceptance report or notified in writing later. The duration runs one year from acceptance, so a defect discovered in month eleven must still be notified before the anniversary, and the notification must be written.
The procedure then follows three steps. First, agree with the builder on the time needed for the repairs; the article requires the repair periods to be fixed by mutual agreement. Second, if there is no agreement or the agreed deadline passes unmet, serve a mise en demeure (formal demand to perform) by registered letter, setting a final reasonable deadline — typically two to four weeks depending on the works — and stating that you will have the works done by another company at his expense. Third, once that demand has gone unanswered, the statute authorises self-help: “En l’absence d’un tel accord ou en cas d’inexécution dans le délai fixé, les travaux peuvent, après mise en demeure restée infructueuse, être exécutés aux frais et risques de l’entrepreneur défaillant.” (article 1792-6). That means the repair works may, after an unsuccessful formal demand, be carried out at the cost and risk of the defaulting builder. Obtain at least two detailed quotes, keep every invoice, photograph the defects before and after, and have the replacement tradesman’s report describe precisely which reserved or notified defect each item corrects. The builders’ liability behind this mechanism is ordinary contract liability: on 15 April 2021 the Third Civil Chamber recalled that “le débiteur est condamné, s’il y a lieu, au payement de dommages-intérêts, soit à raison de l’inexécution de l’obligation, soit à raison du retard dans l’inexécution”, meaning the debtor is ordered to pay damages for non-performance or delay, unless the failure comes from an outside cause: Cass. 3e civ., 15 Apr. 2021, No. 19-25.748.
One formal point decides many files: the demand must come from you or your authorised agent. On 7 September 2022 the Third Civil Chamber held that a formal demand addressed to the builder before termination of his contract had to come from the project owner or his agent, ruling that “la mise en demeure qui, en application de l’article L. 242-1 du code des assurances, devait être adressée à l’entrepreneur avant la résiliation de son contrat, devait émaner du maître de l’ouvrage ou de son mandataire”, which means the demand must emanate from the owner or the owner’s representative: Cass. 3e civ., 7 Sept. 2022, No. 21-21.382. A letter from a well-meaning neighbour, tenant or concierge proves nothing; a written mandate to your property manager, in French, authorising him to serve demands on the builder, proves everything. Foreign owners should sign that mandate before leaving France.
Two limits close the picture. Normal wear and the effects of ordinary use are excluded: “La garantie ne s’étend pas aux travaux nécessaires pour remédier aux effets de l’usure normale ou de l’usage.” (article 1792-6). A carpet worn by a year of tenants, limescale in a kettle, a garden wall dirtied by weather — none of that is a construction defect. And where the builder still refuses, the administration’s guidance recommends attempting mediation first, then referring the matter to the court within the year covered by the guarantee, as explained on service-public.gouv.fr: guarantees after receipt of the works. Do not let the anniversary pass while “discussions continue”: beyond the year, the perfect-completion guarantee is gone, and only the narrower two-year and ten-year regimes remain.
II. The two-year equipment guarantee and where it ends
When the first year expires, owners often assume nothing remains except the ten-year structural warranty, and resign themselves to replacing a dead boiler or jammed shutters at their own cost. That assumption is expensive. For a second year, a separate guarantee covers equipment that can be removed or replaced without damaging the building — and the boundary between the two-year, ten-year and no-guarantee zones has been redrawn by recent case law in the owner’s favour.
A. Which equipment the two-year guarantee covers
The garantie de bon fonctionnement, universally called the garantie biennale (two-year proper-functioning guarantee), covers equipment that does not form an inseparable part of the structure. Article 1792-3 of the Civil Code provides: “Les autres éléments d’équipement de l’ouvrage font l’objet d’une garantie de bon fonctionnement d’une durée minimale de deux ans à compter de sa réception.” The remaining equipment items of the building therefore carry a proper-functioning guarantee of at least two years from acceptance — “at least” because the contract may extend it, and many manufacturer warranties run longer, but the legal floor is two years from the acceptance date, not from the purchase date, the invoice date or the date you moved in.
The distinction that allocates each defect to its regime turns on separability. Article 1792-2 of the Civil Code treats equipment as inseparable from the structural works — foundations, frame, shell, roofing and waterproofing — only where “sa dépose, son démontage ou son remplacement ne peut s’effectuer sans détérioration ou enlèvement de matière de cet ouvrage”, meaning its removal, dismantling or replacement cannot be performed without deterioration or removal of material from that structure. Everything else falls to the two-year guarantee. In an ordinary house or flat, the two-year list typically includes the boiler and water heater, radiators and their valves, taps and sanitary fittings, the intercom and videophone, electric shutters and their motors, kitchen appliances supplied with the works, and the ventilation unit. Tiling set in mortar, render, concealed pipework buried in the slab and waterproofing membranes usually count as inseparable, pushing their defects toward the ten-year regime where the damage is serious enough — while a floating parquet that can be lifted plank by plank, or a sanitary suite fixed with accessible joints, stays in the two-year zone.
The decisive question is what happens when faulty equipment makes the whole building unfit for its purpose — the classic boiler that leaves a winter house unheatable, or the shutters and waterproofing failure that leaves rooms unusable. On 21 March 2024 the Third Civil Chamber restated the Court’s modern position: since 2017, “les désordres affectant des éléments d’équipement, dissociables ou non, d’origine ou installés sur existant, relèvent de la responsabilité décennale lorsqu’ils rendent l’ouvrage dans son ensemble impropre à sa destination”, which means defects in equipment items, whether separable or not, original or fitted later onto an existing building, fall under ten-year liability when they render the building as a whole unfit for its purpose: Cass. 3e civ., 21 Mar. 2024, No. 22-18.694. The ten-year regime itself is strict liability: article 1792 of the Civil Code holds that “Tout constructeur d’un ouvrage est responsable de plein droit, envers le maître ou l’acquéreur de l’ouvrage, des dommages, même résultant d’un vice du sol, qui compromettent la solidité de l’ouvrage ou qui, l’affectant dans l’un de ses éléments constitutifs ou l’un de ses éléments d’équipement, le rendent impropre à sa destination.” Every builder is therefore automatically liable to the owner or buyer for damage, even from ground defects, that compromises structural soundness or renders the building unfit for its purpose. In practice, a dead heating system in January, a roof that lets water pour into bedrooms, or a lift permanently out of order in a building sold as accessible can each cross that threshold — but the assessment is made building by building, defect by defect, and a merely annoying malfunction stays in the two-year guarantee rather than opening the ten-year one.
Procedurally, the two-year claim mirrors the one-year claim: written notice to the builder by registered letter, a deadline for intervention at his expense, then mediation or court action within the guarantee period, as the administration’s English-language guarantees page confirms. Where a dommages-ouvrage (pre-financed damage insurance) policy was taken out — compulsory for whoever commissions construction works, under article L242-1 of the Insurance Code — declare the loss to that insurer as well as to the builder, because the policy pays for repairs without waiting for liability to be apportioned. Mind the insurer’s own clock: on 13 February 2020 the Third Civil Chamber recalled that “toutes actions dérivant d’un contrat d’assurance sont prescrites par deux ans à compter de l’événement qui y donne naissance”, meaning all actions under an insurance contract prescribe two years from the event giving rise to them, applying articles L114-1 and L242-1 of the Insurance Code: Cass. 3e civ., 13 Feb. 2020, No. 19-12.281. An owner who waits eighteen months “to see if it gets worse” before writing to anyone may discover that the insurance action is already half-expired.
B. Deadlines, paperwork and the traps for owners living abroad
Three clocks matter, and each one is unforgiving. The first is the one-year perfect-completion period from acceptance, described above. The second is the two-year equipment period from acceptance, which cannot be shortened by contract but can be extended by it — check the works contract and the equipment manufacturers’ own warranties, which sometimes add years to specific items. The third is the outer cut-off that extinguishes the builder’s construction liability altogether: article 1792-4-1 of the Civil Code provides that “Toute personne physique ou morale dont la responsabilité peut être engagée en vertu des articles 1792 à 1792-4 du présent code est déchargée des responsabilités et garanties pesant sur elle, en application des articles 1792 à 1792-2, après dix ans à compter de la réception des travaux ou, en application de l’article 1792-3 , à l’expiration du délai visé à cet article.” (article 1792-4-1). Any builder is therefore discharged ten years after acceptance for ten-year liability, and at the end of the two-year period for two-year liability. These are cut-off periods, not ordinary limitation periods a judge can extend for fairness: once expired, the claim is gone.
Owners who commissioned a detached house under the standard consumer building contract should know one more deadline, running in the opposite direction. On 6 March 2025 the Third Civil Chamber applied the consumer-law rule that “l’action des professionnels, pour les biens ou les services qu’ils fournissent aux consommateurs, se prescrit par deux ans”, meaning a professional’s action for goods or services supplied to a consumer prescribes in two years, in a dispute combining that rule with the Civil Code and the house-building reception provisions: Cass. 3e civ., 6 Mar. 2025, No. 23-20.075. Concretely, a builder who sues you for an old unpaid balance more than two years after it fell due may himself be out of time — a useful shield when a dormant file resurfaces just as you claim for defects, though set-off between the two claims requires careful handling.
Paperwork decides these disputes more often than legal theory. From the day of acceptance, keep a single file — physical or digital — containing the signed acceptance report with its reservations, every registered letter with its return receipt, dated photographs and short videos of each defect, the works contract and all quotes and invoices, the equipment manuals and warranty cards, and the dommages-ouvrage policy if one exists. Photograph meter readings and boiler error codes; keep the plumber’s or electrician’s written diagnosis, because a tradesman’s dated description of a sudden failure outweighs an insurer’s desk assessment. If you live abroad, give a person on the spot — property manager, architect, or trusted neighbour — a written mandate in French to attend inspections, receive registered letters and serve formal demands in your name, since only you or your agent can validly put the builder on notice. Calendar three dates the day you sign the acceptance report: the one-year anniversary, the two-year anniversary, and a reminder six weeks before each, because the one-year and two-year notifications must each be sent while their period still runs, as article 1792-6 and article 1792-3 respectively require.
Paris and Île-de-France add their own practical layer. For property inside Paris, defect claims go before the tribunal judiciaire de Paris (Paris judicial court), whose construction chamber handles a heavy renovation caseload; elsewhere in the region, the court of the property’s location applies. A factual record drawn up by a commissaire de justice (court enforcement officer, formerly known as a bailiff) — an independent official who visits, photographs and describes the defects — carries far more weight with insurers and judges than your own photographs, and in Paris several offices offer English-speaking staff for exactly this expatriate clientele. Where the amounts justify it, ask the court’s urgent-applications judge for a judicial expert to be appointed before repairs are carried out, so the evidence survives the works. And for co-owned Paris buildings, remember that defects in the common parts — roof, façade, stairwell, lift — must be pursued through the syndic (managing agent) and voted at a general meeting, which adds months: start that parallel track immediately rather than after your private claim. Owners facing a builder who has vanished or gone insolvent should turn promptly to the dommages-ouvrage insurer and check the builder’s ten-year liability policy, whose details must appear on his quotes and invoices. Our Paris real estate team handling defective-works and builder-insolvency files sees every year how a single registered letter sent in month eleven saves claims that polite emails in month fourteen cannot.
Conclusion
The one-year and two-year guarantees reward owners who act early and in writing, and punish those who negotiate orally while the calendar runs. Inspect before paying the balance, record every visible defect in the acceptance report, and notify later discoveries by registered letter well before each anniversary. Remember that moving in and paying in full can itself count as acceptance, that only you or your mandated agent can validly serve the formal demand, and that normal wear is never covered. Beyond the first year, sort each defect ruthlessly: separable equipment goes to the two-year guarantee, defects that make the building unfit for its purpose may reach the ten-year regime, and the insurer’s own two-year clock runs alongside yours. With the acceptance report, the registered letters, dated photographs and a local mandate in place, a foreign owner enforces these guarantees from anywhere in the world; without them, even the clearest defect becomes a donation to the builder.
Read also
- Buying a French House With a Septic Tank: SPANC Reports, the One-Year Upgrade Rule and Buyer Remedies
- Security Deposit Not Returned in France: Deadlines, Deductions, 10% Penalty and Recovery for Foreign Tenants and Landlords
- France's Rental Ban on F- and G-Rated Homes: A Foreign Landlord's Survival Guide