{"id":2183600,"date":"2026-11-28T21:53:35","date_gmt":"2026-11-28T20:53:35","guid":{"rendered":"https:\/\/kohenavocats.fr\/2026\/11\/28\/buying-watermill-france-check-water-rights\/"},"modified":"2026-11-28T21:53:35","modified_gmt":"2026-11-28T20:53:35","slug":"buying-watermill-france-check-water-rights","status":"publish","type":"post","link":"https:\/\/kohenavocats.fr\/en\/2026\/11\/28\/buying-watermill-france-check-water-rights\/","title":{"rendered":"Buying a Watermill in France: How to Check the Water Rights Before You Sign"},"content":{"rendered":"<p>A French watermill is one of the most seductive properties a foreign buyer can find: thick stone walls, a mill race running under the house, a weir humming at the bottom of the garden and, in the listing, three words that seem to add real value: <em>avec droit d&#8217;eau<\/em> (with water rights). Many buyers from the United Kingdom, Ireland, North America or elsewhere picture a right to turn the wheel again, to install a small turbine and sell electricity, or simply to keep the water flowing past the terrace. Under French law, that phrase may describe something very valuable, something that disappeared decades ago, or something the seller never owned at all.<\/p>\n<p>The water right attached to an old mill is a legal object with its own rules. It is a right to use the driving force of the river, not ownership of the water. It is attached to the hydraulic works rather than to the building as such. It can survive a century of disuse, yet it can be lost through the ruin of the essential works, through a change of use, or through a former owner&#8217;s renunciation buried in an old deed. Even when it exists, it does not exempt the owner from the river police rules, known in French as the <em>police de l&#8217;eau<\/em> (water police), which govern fish passage, minimum flows and the maintenance of the weir.<\/p>\n<p>This guide explains, for a foreign buyer, how to check before signing whether a French mill still carries a water right and what that right covers, and then what changes after completion: the obligations towards the administration, the relationship with neighbours who share the river, and the remedies against a seller who described the mill inaccurately. It relies on the French Environmental Code (<em>Code de l&#8217;environnement<\/em>), the Energy Code (<em>Code de l&#8217;\u00e9nergie<\/em>), the Civil Code (<em>Code civil<\/em>), decisions of the Conseil d&#8217;\u00c9tat, France&#8217;s highest administrative court, including its decision of 10 October 2025 and the amended regulation in force since 8 August 2026, and judgments of the Cour de cassation, the highest civil court. It describes the general rules. The answer for a particular mill depends on its history, its documents, the state of its works on the day of the visit and the terms of the contract, which prevail over any general analysis.<\/p>\n<h2>I. Before you sign: does the mill still carry a water right, and what exactly does it cover?<\/h2>\n<h3>A. What a French water right is, how it is proved and what the administration can and cannot do with it<\/h3>\n<p>French law distinguishes two main sources of a mill&#8217;s right to use the river. The first and oldest is the <em>droit fond\u00e9 en titre<\/em> (right founded on ancient title). The Conseil d&#8217;\u00c9tat restated its definition in its <a href=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000052381463\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000052381463\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">decision of 10 October 2025, n\u00b0 495104<\/a>: such rights cover water intakes on non-state-owned rivers established under an act predating the abolition of feudal rights during the French Revolution, intakes on state-owned rivers founded on rights acquired before the Edict of Moulins of 1566, and, whatever the status of the river, intakes operated under rights acquired through the sale of national property after the Revolution. The same decision states their legal nature in one sentence: \u00ab Les droits fond\u00e9s en titre constituent des droits d&#8217;usage de l&#8217;eau qui ont le caract\u00e8re de droits r\u00e9els immobiliers. \u00bb In plain English, they are rights to use the water that are treated as rights in land, attached to the property and its works rather than to a person.<\/p>\n<p>The second source is an administrative authorisation granted later, typically a nineteenth-century prefectoral order or royal ordinance fixing a <em>r\u00e8glement d&#8217;eau<\/em> (water regulation) for the mill. For small installations, <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000023987173\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000023987173\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">article L. 511-9 of the Energy Code<\/a> provides that \u00ab Les installations hydrauliques autoris\u00e9es \u00e0 la date du 18 octobre 1919 et dont la puissance ne d\u00e9passe pas 150 kilowatts demeurent autoris\u00e9es conform\u00e9ment \u00e0 leur titre \u00bb, without any limit in time other than the possibility of their suppression under the water police rules. In other words, a small mill authorised before the 1919 hydroelectricity law keeps its authorisation, but that authorisation remains exposed to the powers of the administration. The two sources can coexist on the same site: in the case decided by the Conseil d&#8217;\u00c9tat on <a href=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000046112945\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000046112945\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">28 July 2022 (n\u00b0 443911)<\/a>, a hydroelectric plant on the Creuse had a right founded on ancient title for 48 kW and, in addition, an authorisation dating from a royal ordinance of 1842 assessed at 136 kW. A buyer must therefore ask which of the two is being sold, and for what power.<\/p>\n<p>How is an ancient right proved when nobody has a feudal charter in the attic? The Conseil d&#8217;\u00c9tat answered that question in its <a href=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000050473854\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000050473854\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">decision of 6 November 2024, n\u00b0 474191<\/a>: \u00ab Une prise d&#8217;eau est pr\u00e9sum\u00e9e \u00e9tablie en vertu d&#8217;un acte ant\u00e9rieur \u00e0 l&#8217;abolition des droits f\u00e9odaux d\u00e8s lors qu&#8217;est prouv\u00e9e son existence mat\u00e9rielle avant cette date. \u00bb This means that the owner does not need to produce the original seigneurial deed; it is enough to prove that the water intake physically existed before the abolition of feudal rights. In practice, that proof comes from old maps, the chain of earlier deeds and the nineteenth-century official inventories of hydraulic works, such as the 1879 departmental statement of irrigations and hydraulic factories examined by the Conseil d&#8217;\u00c9tat in its <a href=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000043897167\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000043897167\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">decision of 3 August 2021, n\u00b0 431392<\/a>. A seller who advertises a water right should be able to hand over at least part of that historical file before the preliminary contract is signed.<\/p>\n<p>The rule is stricter on a <em>cours d&#8217;eau domanial<\/em> (state-owned river). <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006361405\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006361405\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article L. 3111-2 of the General Code of Public Property<\/a> makes the river public domain inalienable, subject only to rights and concessions regularly granted before the Edict of Moulins of February 1566 and to lawfully completed sales of national property. The Cour de cassation applied that rule in a <a href=\"https:\/\/www.courdecassation.fr\/decision\/5fca4b2345949c4fa83897a8\">judgment of its third civil chamber of 9 July 2020, n\u00b0 18-23.786<\/a>: \u00ab La propri\u00e9t\u00e9 d&#8217;un ouvrage implant\u00e9 sur le lit d&#8217;un cours d&#8217;eau d\u00e9pendant du domaine public fluvial ne peut \u00eatre fond\u00e9e, conform\u00e9ment \u00e0 l&#8217;article L. 3111-2 du code g\u00e9n\u00e9ral de la propri\u00e9t\u00e9 publique, que sur des droits r\u00e9guli\u00e8rement accord\u00e9s avant l&#8217;\u00e9dit de Moulins de f\u00e9vrier 1566 et des ventes l\u00e9galement consomm\u00e9es de biens nationaux. \u00bb The court explained that ownership of a structure built in the bed of a state-owned river can only rest on those historic rights. In that case, the land sold as national property in March 1792 did not yet include any mill, since the construction of the mill was only authorised by a departmental decision of April 1792, and the court of appeal was entitled to reject the sale as a source of rights over the disputed weir. Dates matter: a mill built just after the sale of national land does not inherit the status that the sale might have given an existing mill.<\/p>\n<p>Once the right exists, it has concrete effects in today&#8217;s law. Under the water police rules, <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000033932831\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000033932831\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">article L. 214-6 of the Environmental Code<\/a> provides that installations declared or authorised under water legislation predating 4 January 1992 are deemed declared or authorised, and adds: \u00ab Il en est de m\u00eame des installations et ouvrages fond\u00e9s en titre. \u00bb An ancient mill does not need a new water authorisation simply to exist. Under energy law, <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000054355215\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000054355215\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">article L. 511-4 of the Energy Code<\/a> excludes from the hydroelectric authorisation regime \u00ab Les usines ayant une existence l\u00e9gale \u00bb, an expression the Conseil d&#8217;\u00c9tat uses as an equivalent of works founded on ancient title. The owner of such a mill can therefore produce power within the limits of the right without applying for the ordinary hydroelectric authorisation, but remains subject to the environmental rules discussed in Part II.<\/p>\n<p>Those limits are what French lawyers call the <em>consistance l\u00e9gale<\/em> (legal capacity) of the right. In its <a href=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000043897167\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000043897167\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">decision of 3 August 2021, n\u00b0 431392<\/a>, the Conseil d&#8217;\u00c9tat held that a right founded on ancient title in principle keeps the capacity it had at the origin, and that \u00ab A d\u00e9faut de preuve contraire, cette consistance est pr\u00e9sum\u00e9e conforme \u00e0 sa consistance actuelle. \u00bb In other words, unless someone proves otherwise, the right is presumed to cover what the works allow today. The same decision added that this capacity corresponds not to the useful power actually extracted but to the maximum theoretical power, calculated with the formula now found in <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000054355210\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000054355210\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">article L. 511-5 of the Energy Code<\/a>: the height of the fall multiplied by the maximum flow of the diversion and by the intensity of gravity. In that case, the administration had fixed the capacity at 66.24 kW, the owner claimed 544 kW, and the administrative court of appeal had relied on the 1879 inventory without checking whether the flow it recorded was a mean flow or the maximum flow diverted; the Conseil d&#8217;\u00c9tat set that judgment aside. For a buyer whose business plan depends on selling electricity, the difference between those two figures is the whole value of the project.<\/p>\n<p>The administration becomes involved as soon as the buyer wants to do anything with the works. Under <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000054636776\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000054636776\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">article R. 214-18-1 of the Environmental Code<\/a>, in its version in force since 8 August 2026: \u00ab Le confortement, la remise en eau ou la remise en exploitation d&#8217;installations ou d&#8217;ouvrages existants fond\u00e9s en titre ou autoris\u00e9s avant le 16 octobre 1919 pour une puissance hydro\u00e9lectrique inf\u00e9rieure \u00e0 150 kW sont port\u00e9s, avant leur r\u00e9alisation, \u00e0 la connaissance du pr\u00e9fet avec tous les \u00e9l\u00e9ments d&#8217;appr\u00e9ciation. \u00bb Strengthening the works, putting water back into the race or restarting operation must therefore be notified to the prefect before the works begin, with the supporting file. On that basis, the same article allows the prefect to recognise the right and its legal capacity, to record that the right has been lost through ruin or change of use and set, where appropriate, requirements for restoring the site, to modify or revoke the operating authorisation under the conditions of article L. 214-4, and to impose additional requirements. A buyer who plans to restore a mill should expect the existence of the right to be examined at that moment, and should therefore examine it before signing rather than after.<\/p>\n<p>One power has disappeared. Until August 2026, the same article allowed the prefect to modify or revoke \u00ab le droit fond\u00e9 en titre ou l&#8217;autorisation \u00bb. In its <a href=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000052381463\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000052381463\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">decision of 10 October 2025, n\u00b0 495104<\/a>, the Conseil d&#8217;\u00c9tat distinguished the right to use the water from the authorisation to operate the works and held: \u00ab L&#8217;abrogation de l&#8217;autorisation d&#8217;exploiter susceptible d&#8217;\u00eatre prononc\u00e9e sur le fondement du II de l&#8217;article L. 214-4 du code de l&#8217;environnement est ainsi sans incidence sur le maintien du droit d&#8217;usage de l&#8217;eau attach\u00e9 \u00e0 l&#8217;installation. \u00bb It annulled the government&#8217;s refusal to repeal the words allowing the prefect to revoke the right itself and, in the same <a href=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000052381463\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000052381463\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">decision of 10 October 2025<\/a>, ordered the Prime Minister to repeal or amend them within six months of its notification. The version of <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000054636776\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000054636776\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">article R. 214-18-1<\/a> in force since 8 August 2026 now refers only to modifying or revoking the authorisation. The practical message for a buyer is double: the administration can still regulate the operation of the works and can still record that a right has already been lost, but it cannot decide on its own to extinguish a right that still exists.<\/p>\n<h3>B. How a right is lost, who owns the mill race, and what the deeds must say<\/h3>\n<p>The central question before signing is whether the right still exists. The Conseil d&#8217;\u00c9tat has laid down a stable test. In its <a href=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000050473854\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000050473854\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">decision of 6 November 2024<\/a>, it repeated that a right founded on ancient title is lost when the driving force of the river can no longer be used by its holder because the essential works intended to use the fall and volume of the river are ruined or have changed purpose, while neither a long period without use nor the dilapidation of the mill building is enough on its own. It then defined ruin: \u00ab L&#8217;\u00e9tat de ruine, qui conduit en revanche \u00e0 la perte du droit, est \u00e9tabli lorsque les \u00e9l\u00e9ments essentiels de l&#8217;ouvrage permettant l&#8217;utilisation de la force motrice du cours d&#8217;eau ont disparu ou qu&#8217;il n&#8217;en reste que de simples vestiges, de sorte que cette force motrice ne peut plus \u00eatre utilis\u00e9e sans leur reconstruction compl\u00e8te. \u00bb The decisive point is therefore not the state of the house but the state of the hydraulic works: the weir, the intake, the head race and the tail race, the sluice gates.<\/p>\n<p>Two decisions show where the line falls. In its <a href=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000038411782\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000038411782\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">decision of 24 April 2019, n\u00b0 420764<\/a>, the Conseil d&#8217;\u00c9tat upheld a ruling that a mill on the Ba\u00efse had kept its right although its weir, 25 metres long, had an 8-metre breach covering almost 30 square metres: the necessary works were more than a simple repair, but they did not amount to a complete reconstruction. In the 2024 case, by contrast, the right attached to a mill on the Indre was held lost: the weir had been completely erased, only the stone abutments remaining on each bank, the entrance of the head race no longer existed, the head and tail races were largely filled in and overgrown, and the two mill sluice gates were too dilapidated to work, so that the river&#8217;s force could no longer be used without a complete reconstruction of the essential elements, even though the main mill building was still standing. A buyer visiting a mill should look at the weir and the races at least as carefully as at the roof, and should photograph what exists on the day of the visit.<\/p>\n<p>Change of use leads to the same result. In its <a href=\"https:\/\/www.courdecassation.fr\/decision\/5fca4b2345949c4fa83897a8\">judgment of 9 July 2020, n\u00b0 18-23.786<\/a>, the Cour de cassation approved a court of appeal which had held that \u00ab si un droit d&#8217;eau fond\u00e9 en titre ne se perd pas par le non-usage, il dispara\u00eet lorsque la force motrice du cours d&#8217;eau n&#8217;est plus susceptible d&#8217;\u00eatre utilis\u00e9e par son d\u00e9tenteur, du fait de la ruine ou du changement d&#8217;affectation des ouvrages essentiels destin\u00e9s \u00e0 utiliser la pente et le volume de ce cours d&#8217;eau \u00bb. In that case, an ancient mill had been entirely remodelled and converted into offices, so that the essential work had changed purpose, and the right no longer existed when the company that later sold the site had acquired it. A mill turned into a house decades ago may be in exactly the same position.<\/p>\n<p>A right can also be renounced, sometimes by an owner long dead. In a <a href=\"https:\/\/www.courdecassation.fr\/decision\/607977899ba5988459c49fb5\">judgment of 28 November 2012, n\u00b0 11-20.156<\/a>, published in the court&#8217;s official Bulletin, the Cour de cassation upheld a finding of renunciation where the former owner had signed in 1969 an agreement with the national association of French millers, ceased milling, undertaken to dismantle the equipment and received an indemnity in return; the court of appeal had noted that \u00ab le moulin s&#8217;\u00e9tait trouv\u00e9 effectivement d\u00e9mont\u00e9 et en cessation totale et volontaire d&#8217;activit\u00e9 \u00bb, and was entitled to deduce that the owner had given up the use of the river&#8217;s driving force. A buyer should ask whether the mill was ever the subject of a closure agreement and look for it in the chain of title, because it may have ended the right long before the current owner bought.<\/p>\n<p>The renunciation may also sit in an ordinary sale deed. In a <a href=\"https:\/\/www.courdecassation.fr\/decision\/5fca62a1cd9db94aae9c7990\">judgment of 14 November 2019, n\u00b0 16-18.601<\/a>, the Cour de cassation examined a case where a family had divided an estate containing two watermills fed by the same diversion channel. The buyer of one mill had accepted a clause stating that \u00ab le vendeur ne pourra \u00eatre tenu envers l&#8217;acqu\u00e9reur de conduire quelque d\u00e9bit que ce soit provenant du ruisseau la Mansonesque \u00bb. The court approved the court of appeal for having deduced that she \u00ab avait renonc\u00e9 sans \u00e9quivoque au droit d&#8217;eau qu&#8217;elle d\u00e9tenait \u00bb, notwithstanding any failure by the notary to advise her. The claim against the notary failed as well, because it was not proved that she would not have signed if she had been warned that the renunciation was final. A short clause about the flow, inserted decades ago when nobody intended to restart the mill, can therefore decide the value of the property today.<\/p>\n<p>The second question is who owns the <em>bief<\/em> (mill race) and its banks. <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006428873\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006428873\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article 546 of the Civil Code<\/a> gives the owner of a thing the right to whatever is united to it as an accessory, naturally or artificially; this is the right of accession. On that basis, French courts presume that the owner of a mill owns the artificial channel bringing water to it and taking it away, together with the strips of land along each bank needed for upkeep, known as <em>francs-bords<\/em>. The presumption has limits. In a <a href=\"https:\/\/www.courdecassation.fr\/decision\/60794e549ba5988459c48e27\">judgment of 12 July 2006, n\u00b0 05-14.001<\/a>, published in its Bulletin, the Cour de cassation held that \u00ab la pr\u00e9somption de propri\u00e9t\u00e9, au profit du propri\u00e9taire d&#8217;un moulin, du bief artificiel qui \u00e9coule l&#8217;eau en ses parties sup\u00e9rieure d&#8217;amen\u00e9e et inf\u00e9rieure d&#8217;\u00e9vacuation ainsi que de la bande de terrain longeant chaque rive, \u00e9tait \u00e9cart\u00e9e lorsque le bief n&#8217;\u00e9tait que l&#8217;am\u00e9nagement direct ou la transformation rudimentaire d&#8217;un cours d&#8217;eau dont il recueillait toutes les eaux \u00bb. Where the race takes the whole stream, it is treated as the stream itself, not as an accessory of the mill. In the 2019 case, the presumption was also set aside because the shared channel served as head race for one mill and tail race for the other, and so had not been created for the exclusive benefit of either.<\/p>\n<p>The presumption also yields to the history of the property and to the words of the deed. In a <a href=\"https:\/\/www.courdecassation.fr\/decision\/613727bfcd5801467742d8de\">judgment of 22 March 2011, n\u00b0 10-14.645<\/a>, the mill had lost any function other than housing before the buyers acquired it, and their deed made no reference to the canal; the court of appeal was entitled to deduce that \u00ab le bief appartenait pour moiti\u00e9 \u00e0 chacune des parties \u00bb, each riparian owner holding half of the bed, which is the ordinary rule of <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006833156\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006833156\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">article L. 215-2 of the Environmental Code<\/a> for non-state-owned watercourses, save title or prescription to the contrary. In another <a href=\"https:\/\/www.courdecassation.fr\/decision\/61372859cd58014677430a52\">judgment of 28 November 2012, n\u00b0 11-24.191<\/a>, the court approved the rejection of a claim to the canal because the mill had not worked for some forty years, its hydraulic installations had been dismantled, and the buyers&#8217; own deed showed that \u00ab n&#8217;avait pas \u00e9t\u00e9 acquis un moulin mais une maison \u00e0 usage d&#8217;habitation comportant un jardin et un terrain \u00bb. The same judgment nevertheless quashed the decision on a different point: the buyers could still claim an easement over the upstream land under articles 693 and <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006430407\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006430407\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">694 of the Civil Code<\/a>, which create an easement by <em>destination du p\u00e8re de famille<\/em> (easement arising when a single owner divides land) where a visible sign of the easement existed at the time of division, and the court of appeal had overlooked its own finding that the upstream owner had recovered the cranks used to operate the lock gate.<\/p>\n<p>Split mill estates generate the most difficult disputes. A first-instance judgment of the Auxerre judicial court of 25 August 2025 (n\u00b0 22\/00519), delivered subject to any appeal, illustrates the risk for both sides. A former mill estate had been divided: one buyer acquired the house, a meadow, an island and the parcel described in the deed as the \u00ab bief \u00bb, while a hydroelectric operator acquired the mill building with a small power plant authorised by a 2018 prefectoral order. When the house owners fenced their land, the operator claimed ownership of the head race, the intake grid, the cleaning platform and three-metre strips along the banks. The court accepted that these works had been built for the exclusive needs of the mill, but held that the presumption of article 546 was rebutted by the house owners&#8217; title, which expressly included the parcel forming the race. The operator&#8217;s alternative claim to an easement failed because it had to bring, as the <a href=\"https:\/\/www.courdecassation.fr\/decision\/68b5e933c1dca99f2639c154\">judgment of 25 August 2025<\/a> puts it, \u00ab la triple preuve que les fonds ont appartenu \u00e0 un auteur commun, qu&#8217;il existait un signe apparent de servitude au jour de la division et que l&#8217;acte de division ne contient aucune stipulation contraire \u00bb, and it had produced only extracts of the dividing deed. Whichever side of such a division you buy, the full dividing deed and every easement it creates must be read before signing.<\/p>\n<p>These decisions point to a concrete pre-contract checklist. Ask the seller for the historical proof of the right and any nineteenth-century water regulation; for any prefectoral decision recognising the right, fixing its capacity, recording its loss or imposing works; for any closure agreement or renunciation clause in the chain of title; for the complete deeds of any past division of the estate; and for photographs and invoices of works on the weir, gates and races. Check on site whether the weir and races still exist and function. Then make sure the <em>compromis de vente<\/em> (preliminary sale agreement) describes what is sold: the nature of the right, its legal capacity if it has been fixed, the works that carry it, the parcels that form the race and its banks, and the easements that benefit or burden the property, with the supporting documents annexed. Where the right is essential to your plans, you can negotiate a clause making the sale conditional on a satisfactory answer on these points, or a price adjustment. A lawyer can review these documents with you before you commit; our <a href=\"https:\/\/kohenavocats.fr\/en\/real-estate-law-attorneys-paris-75017\/\">real estate lawyers in Paris<\/a> regularly analyse French preliminary contracts and title deeds for foreign buyers.<\/p>\n<h2>II. After completion: obligations towards the administration, the neighbours and the seller<\/h2>\n<h3>A. Living with the water police: fish passage, minimum flow and maintenance<\/h3>\n<p>A water right gives a use; it does not exempt the works from the rules protecting the river. The most important of them is ecological continuity, organised by <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000043975402\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000043975402\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">article L. 214-17 of the Environmental Code<\/a>. That article provides for two lists of rivers drawn up for each basin. On rivers of the first list, no authorisation can be granted for new works that obstruct ecological continuity. On rivers of the second list, where the sufficient transport of sediment and the movement of migratory fish must be ensured, every work must be managed, maintained and equipped according to rules set by the administration in consultation with the owner, without calling into question its current or potential use, in particular for energy production. In its current version, in force since 25 August 2021, the text adds a sentence aimed specifically at mills: \u00ab S&#8217;agissant plus particuli\u00e8rement des moulins \u00e0 eau, l&#8217;entretien, la gestion et l&#8217;\u00e9quipement des ouvrages de retenue sont les seules modalit\u00e9s pr\u00e9vues pour l&#8217;accomplissement des obligations relatives au franchissement par les poissons migrateurs et au transport suffisant des s\u00e9diments, \u00e0 l&#8217;exclusion de toute autre, notamment de celles portant sur la destruction de ces ouvrages. \u00bb For a mill, compliance is therefore to be achieved by maintaining, managing and equipping the weir, not by destroying it.<\/p>\n<p>Timing depends on the history of the works. Under the III of <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000043975402\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000043975402\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">article L. 214-17<\/a>, the obligations attached to the second list apply to existing works that were regularly installed at the end of a five-year period after the publication of the lists, and an owner who filed a proposal for the necessary works with the water police services but could not complete them within that period has five additional years to do so. The Conseil d&#8217;\u00c9tat has refused that delay to works that had not complied with the earlier fish-passage obligations. In its <a href=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000046112945\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000046112945\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">decision of 28 July 2022<\/a>, it held that works subject to a previous duty to comply, whose operator had not met it within the period then allowed, cannot be regarded as regularly installed, so that the obligations applied to them as soon as the classification order was published. In that case, inspectors had recorded non-compliance in 2013, and the draft order imposing additional requirements was sent in 2015 to the company that had since become the new owner of the plant. A buyer therefore takes over not only the right but also the compliance history of the works.<\/p>\n<p>A buyer should also be wary of any listing that describes a mill as exempt from ecological continuity. A 2017 law had inserted into the Environmental Code an article L. 214-18-1 exempting watermills equipped to produce electricity from the rules of the second list. In the same <a href=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000046112945\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000046112945\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">decision of 28 July 2022<\/a>, the Conseil d&#8217;\u00c9tat held that this provision, insofar as it exempted existing mills regardless of their effect on ecological continuity and on eel migration, breached the objectives of the 2000 EU Water Framework Directive and the 2007 EU eel regulation, and that national authorities had a duty \u00ab de donner instruction \u00e0 leurs services de n&#8217;en point faire application tant que ces dispositions n&#8217;ont pas \u00e9t\u00e9 modifi\u00e9es \u00bb. The version history on L\u00e9gifrance shows that article L. 214-18-1 was then repealed with effect from 12 March 2023. An exemption argument based on the 2017 text should no longer be accepted at face value; the position actually applied to the works should be checked with the departmental water police service.<\/p>\n<p>The second constraint is the minimum flow. Under <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000047299352\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000047299352\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">article L. 214-18 of the Environmental Code<\/a>, any work in the bed of a river must include devices maintaining a minimum flow that guarantees at all times the life, movement and reproduction of the species living in the water, and that flow may not, as a rule, be lower than one tenth of the river&#8217;s mean annual flow, subject to the exceptions listed in the article. The Conseil d&#8217;\u00c9tat clarified in its <a href=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000054153244\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000054153244\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">decision of 29 May 2026, n\u00b0 500309<\/a>, that where an installation is equipped with continuity devices which do not feed the turbines, \u00ab les d\u00e9bits qui leur sont d\u00e9di\u00e9s sont sans incidence sur la valeur du d\u00e9bit correspondant \u00e0 la puissance maximale brute dont l&#8217;exploitant est autoris\u00e9 \u00e0 disposer \u00bb. The water sent through a fish pass therefore does not reduce the flow on which the authorised maximum power is calculated, but the same decision recalls that the installation may only operate lawfully while respecting the minimum flow, both in the river bed and through the continuity devices. Any output figures supplied with the sale particulars should be checked against these constraints.<\/p>\n<p>The third constraint is maintenance. Under the II of <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000033932845\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000033932845\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">article L. 214-4 of the Environmental Code<\/a>, an authorisation may be revoked or modified without compensation in several cases, including where the works are abandoned or no longer regularly maintained. That power targets the operating authorisation, not the water right itself, as the Conseil d&#8217;\u00c9tat confirmed in 2025. Its exercise is also controlled. In its <a href=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000038396439\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000038396439\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">decision of 11 April 2019, n\u00b0 414211<\/a>, the Conseil d&#8217;\u00c9tat examined the case of a couple who had bought a mill in 2010 and whose 1876 water regulation had been revoked by the prefect in 2013. It held that lack of regular maintenance must be properly established, and that \u00ab Le juge saisi du bien-fond\u00e9 d&#8217;une telle abrogation statue au vu de la situation existante \u00e0 la date de sa d\u00e9cision. \u00bb The owners had cleared vegetation, silt, stones and debris from the weir, cleaned the water chambers, and a recent wheel and sluice gate had been installed; the court of appeal was wrong to treat those facts as a lack of regular maintenance. For a new owner, the lesson is to start maintaining the works quickly and to keep dated evidence of everything done.<\/p>\n<p>A related rule concerns a long stoppage. Under <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000033941122\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000033941122\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">article R. 214-45 of the Environmental Code<\/a>, the permanent cessation of the operation indicated in an authorisation or declaration, or a stoppage of more than two years, must be declared to the prefect by the operator or, failing that, the owner, within the month following the permanent cessation or change of use and at the latest one month before the stoppage of more than two years takes effect. The Conseil d&#8217;\u00c9tat held in its <a href=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000052381463\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000052381463\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">decision of 10 October 2025<\/a> that this rule concerns authorisations and declarations, and cannot apply to the right to use the water, which is distinct from them. A buyer who does not intend to operate the mill should nevertheless clarify, with the documents in hand, which authorisation or declaration the works are subject to and whether such a declaration is due.<\/p>\n<p>Mills also benefit from protections linked to heritage. The III of <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000054715661\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000054715661\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">article L. 211-1 of the Environmental Code<\/a> states that the balanced management of water resources does not prevent the preservation of hydraulic heritage, in particular hydraulic mills and their outbuildings, where they are protected as historic monuments, within the surroundings of monuments or remarkable heritage sites, or by the local plan under article L. 151-19 of the Planning Code, and the IV of article L. 214-17 requires continuity measures to respect the objectives of that protection. Whether the mill benefits from such protection is worth checking before signing, because it will carry weight in any discussion with the administration about the equipment to be installed.<\/p>\n<h3>B. Neighbours, liability and claims against the seller<\/h3>\n<p>A mill owner is also a riparian owner, with the duties that come with it. Under <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006833156\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006833156\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">article L. 215-2 of the Environmental Code<\/a>, the bed of a non-state-owned river belongs to the owners of both banks, each owning half up to an imaginary line in the middle, save title or prescription to the contrary. Under <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006833171\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006833171\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">article L. 215-14<\/a>, \u00ab le propri\u00e9taire riverain est tenu \u00e0 un entretien r\u00e9gulier du cours d&#8217;eau \u00bb, which the article describes as maintaining the river in its profile of equilibrium and allowing the natural flow of water, notably by removing log jams, debris and silt deposits and by pruning bank vegetation. Fishing rights follow the same logic: under <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000033035351\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000033035351\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">article L. 435-4 of the Environmental Code<\/a>, \u00ab Dans les cours d&#8217;eau et canaux non domaniaux, les propri\u00e9taires riverains ont, chacun de leur c\u00f4t\u00e9, le droit de p\u00eache jusqu&#8217;au milieu du cours d&#8217;eau ou du canal, sous r\u00e9serve de droits contraires \u00e9tablis par possession ou titres. \u00bb A listing that mentions private fishing therefore describes a right shared with the owner opposite, unless a title says otherwise.<\/p>\n<p>The riparian right is not the mill&#8217;s right. <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006429882\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006429882\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article 644 of the Civil Code<\/a> allows a landowner whose property borders running water to use it as it passes to irrigate the land, and one whose property the water crosses to use it within that stretch provided it is returned to its ordinary course on leaving. That is a right to use water for the land, not a right to exploit the river&#8217;s driving force. A house beside a river, even a former mill, does not carry a right to restart a turbine unless a right founded on ancient title or an authorisation still attaches to the works.<\/p>\n<p>Liability towards neighbours depends first on who owns the works. <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000032041546\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000032041546\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article 1244 of the Civil Code<\/a> provides: \u00ab Le propri\u00e9taire d&#8217;un b\u00e2timent est responsable du dommage caus\u00e9 par sa ruine, lorsqu&#8217;elle est arriv\u00e9e par une suite du d\u00e9faut d&#8217;entretien ou par le vice de sa construction. \u00bb In the 2020 case already discussed, an owner whose buildings had been damaged blamed the malfunction of a weir regulating the river level; the claimants relied on this article, but the Cour de cassation upheld the dismissal of their claim because the weir had not belonged to the defendants, so they could not be responsible for the consequences of its ruin through lack of maintenance (<a href=\"https:\/\/www.courdecassation.fr\/decision\/5fca4b2345949c4fa83897a8\">Cass. 3e civ., 9 July 2020, n\u00b0 18-23.786<\/a>). Ownership of the weir, the gates and the races was therefore the decisive question in that dispute. The same uncertainty that affects the value of a water right before purchase can determine, after purchase, who answers for flooding, erosion or a falling water level. Knowing exactly which works you are buying, and in what condition, is also a way of knowing what you may have to answer for.<\/p>\n<p>When the mill turns out to be different from what was described, several remedies against the seller may be discussed, depending on the facts and the wording of the deed. The first is the pre-contractual duty to inform. <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000032007138\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000032007138\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article 1112-1 of the Civil Code<\/a> provides: \u00ab Celle des parties qui conna\u00eet une information dont l&#8217;importance est d\u00e9terminante pour le consentement de l&#8217;autre doit l&#8217;en informer d\u00e8s lors que, l\u00e9gitimement, cette derni\u00e8re ignore cette information ou fait confiance \u00e0 son cocontractant. \u00bb The parties cannot limit or exclude that duty, and a breach may lead to damages or to the annulment of the contract. A prefectoral decision recording the loss of the right, a formal notice from the water police, or an order imposing fish-passage works would seem to meet that test where the water right was presented as part of what was sold. If the seller deliberately concealed such information knowing it was decisive, the buyer may also invoke <em>dol<\/em> (fraudulent misrepresentation or concealment) under article 1137 of the Civil Code.<\/p>\n<p>The second remedy is the warranty against hidden defects. <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006441924\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006441924\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article 1641 of the Civil Code<\/a> makes the seller liable for hidden defects that render the property unfit for its intended use or so diminish that use that the buyer would not have bought, or would have paid less, had they known. This remedy concerns first a physical defect: a sluice gate that cannot be operated, a weir cracked below the waterline, a race whose watertightness has failed. The decisions consulted for this guide do not decide whether the loss of a water right before the sale is itself a hidden defect, so a buyer should expect a debate on that qualification. The seller is not liable for apparent defects that the buyer could have noticed, under article 1642, and a race visibly filled in and overgrown at the time of the visits will give the seller a serious argument. Where the deed contains a clause excluding the warranty, which <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006441953\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006441953\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">article 1643<\/a> allows for defects the seller did not know about, that clause has limits. In a <a href=\"https:\/\/www.courdecassation.fr\/decision\/6530d8212733048318aefd83\">judgment of 19 October 2023, n\u00b0 22-15.536<\/a>, the Cour de cassation recalled that \u00ab le vendeur professionnel, auquel est assimil\u00e9 le vendeur qui a r\u00e9alis\u00e9 lui-m\u00eame les travaux \u00e0 l&#8217;origine des vices de la chose vendue, est tenu de les conna\u00eetre et ne peut se pr\u00e9valoir d&#8217;une clause limitative ou exclusive de garantie des vices cach\u00e9s \u00bb. A seller who rebuilt the weir or the gates himself, without a professional, may therefore be unable to rely on the exclusion clause if those works are the source of the defect.<\/p>\n<p>Time matters for this remedy. Under <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000020466328\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000020466328\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">article 1648 of the Civil Code<\/a>, the action \u00ab doit \u00eatre intent\u00e9e par l&#8217;acqu\u00e9reur dans un d\u00e9lai de deux ans \u00e0 compter de la d\u00e9couverte du vice \u00bb. The date on which the buyer learned the true state of the works, or the position of the administration, should therefore be recorded as soon as it occurs, with the letter, report or photographs that establish it.<\/p>\n<p>The third avenue is the seller&#8217;s obligation to deliver what was sold. <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006441648\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006441648\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article 1615 of the Civil Code<\/a> provides: \u00ab L&#8217;obligation de d\u00e9livrer la chose comprend ses accessoires et tout ce qui a \u00e9t\u00e9 destin\u00e9 \u00e0 son usage perp\u00e9tuel. \u00bb The decisions consulted for this guide do not decide whether a water right founded on ancient title is such an accessory. Where the deed expressly describes a water right of a given capacity, its absence may be argued as a failure to deliver; where the deed is silent, the argument is weaker, and the 2012 judgment on a mill sold as a house shows how much the description in the deed weighs. That is the strongest reason to have the right, the works and the parcels described precisely in the preliminary agreement and in the final deed. If a dispute arises after completion, the evidence gathered before signing, the description in the deed and the date of discovery will shape the strategy; our <a href=\"https:\/\/kohenavocats.fr\/en\/real-estate-law-attorneys-paris-75017\/\">French property litigation practice<\/a> handles such disputes for owners living abroad.<\/p>\n<h2>Conclusion<\/h2>\n<p>The words \u00ab avec droit d&#8217;eau \u00bb in a French listing are a starting point, not a guarantee. A water right attached to a mill is a right in land to use the river&#8217;s driving force, proved by the physical existence of the intake before the abolition of feudal rights, or founded on an old authorisation, and limited to a legal capacity calculated from the fall and the maximum flow diverted. It survives long periods of disuse and the dilapidation of the building, and since the Conseil d&#8217;\u00c9tat decision of 10 October 2025 and the amended regulation in force since 8 August 2026, the prefect can no longer revoke it as such. But it disappears when the weir, intake and races are reduced to vestiges, when the works are converted to another use, or when a former owner renounced it, sometimes in a closure agreement or a single clause about the flow. Ownership of the mill race depends on the history of the site and on the words of the deeds. After completion, the owner must live with ecological continuity requirements, the minimum flow and a duty of maintenance, while the 2017 exemption for mills is no longer in the Environmental Code. Remedies against a seller exist, but they depend on what the deed says and on evidence gathered in time. For a foreign buyer, the decisive work is done before signing: obtaining the historical and administrative file, inspecting the hydraulic works themselves and writing into the contract exactly what is being bought.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Buying a watermill in France? How to check that the mill&#8217;s water right (droit fond\u00e9 en titre) still exists and what it covers, how ruin, change of use or an old renunciation ends it, who owns the mill race, and the owner&#8217;s duties and remedies after completion.<\/p>\n","protected":false},"author":251031307,"featured_media":16341,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_kj_source_type":"","_kj_official_id":"","_kj_official_url":"","_kj_judilibre_id":"","_kj_jur":"","_kj_lieu":"","_kj_chambre":"","_kj_rg":"","_kj_date":"","activitypub_content_warning":"","activitypub_content_visibility":"","activitypub_max_image_attachments":4,"activitypub_interaction_policy_quote":"anyone","activitypub_status":"federated","footnotes":""},"categories":[80314,79307],"tags":[],"class_list":["post-2183600","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-decryptage","category-en-real-estate"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.2 (Yoast SEO v28.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Buying a Watermill in France: How to Check the Water Rights Before You Sign<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/kohenavocats.fr\/en\/2026\/11\/28\/buying-watermill-france-check-water-rights\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Buying a Watermill in France: How to Check the Water Rights Before You Sign\" \/>\n<meta property=\"og:description\" content=\"Buying a watermill in France? How to check that the mill&#039;s water right (droit fond\u00e9 en titre) still exists and what it covers, how ruin, change of use or an old renunciation ends it, who owns the mill race, and the owner&#039;s duties and remedies after completion.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/kohenavocats.fr\/en\/2026\/11\/28\/buying-watermill-france-check-water-rights\/\" \/>\n<meta property=\"og:site_name\" content=\"Reda KOHEN\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-28T20:53:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/kohenavocats.fr\/wp-content\/uploads\/2025\/10\/DSC00546-1024x683.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ma\u00eetre Reda Kohen\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ma\u00eetre Reda Kohen\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"31 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/11\\\/28\\\/buying-watermill-france-check-water-rights\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/11\\\/28\\\/buying-watermill-france-check-water-rights\\\/\"},\"author\":{\"name\":\"Ma\u00eetre Reda Kohen\",\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/#\\\/schema\\\/person\\\/9aa9e0277e7db97c71478d042a254eda\"},\"headline\":\"Buying a Watermill in France: How to Check the Water Rights Before You Sign\",\"datePublished\":\"2026-11-28T20:53:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/11\\\/28\\\/buying-watermill-france-check-water-rights\\\/\"},\"wordCount\":6336,\"publisher\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/11\\\/28\\\/buying-watermill-france-check-water-rights\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/kohenavocats.fr\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/planet-volumes-3eXgkMpE-pQ-unsplash-scaled.webp\",\"articleSection\":[\"D\u00e9cryptage\",\"French real estate law\"],\"inLanguage\":\"en-US\",\"citation\":\"Buying a Watermill in France: How to Check the Water Rights Before You Sign\",\"about\":[{\"@type\":\"Thing\",\"name\":\"D\u00e9cryptage\"},{\"@type\":\"Thing\",\"name\":\"French real estate law\"}],\"dateModified\":\"2026-11-28T20:53:35+00:00\",\"speakable\":{\"@type\":\"SpeakableSpecification\",\"cssSelector\":[\".article-content > p:first-of-type\"]}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/11\\\/28\\\/buying-watermill-france-check-water-rights\\\/\",\"url\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/11\\\/28\\\/buying-watermill-france-check-water-rights\\\/\",\"name\":\"Buying a Watermill in France: How to Check the Water Rights Before You Sign\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/11\\\/28\\\/buying-watermill-france-check-water-rights\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/11\\\/28\\\/buying-watermill-france-check-water-rights\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/kohenavocats.fr\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/planet-volumes-3eXgkMpE-pQ-unsplash-scaled.webp\",\"datePublished\":\"2026-11-28T20:53:35+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/11\\\/28\\\/buying-watermill-france-check-water-rights\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/11\\\/28\\\/buying-watermill-france-check-water-rights\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/11\\\/28\\\/buying-watermill-france-check-water-rights\\\/#primaryimage\",\"url\":\"https:\\\/\\\/kohenavocats.fr\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/planet-volumes-3eXgkMpE-pQ-unsplash-scaled.webp\",\"contentUrl\":\"https:\\\/\\\/kohenavocats.fr\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/planet-volumes-3eXgkMpE-pQ-unsplash-scaled.webp\",\"width\":2200,\"height\":3500},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/11\\\/28\\\/buying-watermill-france-check-water-rights\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Buying a Watermill in France: How to Check the Water Rights Before You Sign\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/\",\"name\":\"Reda KOHEN\",\"description\":\"Ma\u00eetre Reda Kohen, attorney specialized in real estate and business law in Paris, advises and assists companies and individuals in their real estate, commercial and contractual transactions. He also handles real estate litigation and the resolution of complex commercial disputes.\",\"publisher\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/#organization\",\"name\":\"Reda KOHEN\",\"url\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/kohenavocats.fr\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/Logo-2-1.webp\",\"contentUrl\":\"https:\\\/\\\/kohenavocats.fr\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/Logo-2-1.webp\",\"width\":2114,\"height\":1253,\"caption\":\"Reda KOHEN\"},\"image\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/#\\\/schema\\\/person\\\/9aa9e0277e7db97c71478d042a254eda\",\"name\":\"Ma\u00eetre Reda Kohen\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0e11b8d1254304dff2a862995dd5cab90bf77e3eb2ea128133e9cb39ecb7ed23?s=96&d=identicon&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0e11b8d1254304dff2a862995dd5cab90bf77e3eb2ea128133e9cb39ecb7ed23?s=96&d=identicon&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0e11b8d1254304dff2a862995dd5cab90bf77e3eb2ea128133e9cb39ecb7ed23?s=96&d=identicon&r=g\",\"caption\":\"Ma\u00eetre Reda Kohen\"},\"description\":\"Avocat expert en droit immobilier et droit commercial, Ma\u00eetre KOHEN est dipl\u00f4m\u00e9 d\u2019un Master 2 en droit des affaires sp\u00e9cialis\u00e9 en droit des contrats et droit des entreprises, dipl\u00f4me qu\u2019il a obtenu avec mention. Avant de pr\u00eater serment, il a \u00e9t\u00e9 form\u00e9 dans des grands cabinets internationaux de renom : Fidal, Veil Jourde et Bird &amp; Bird. Cette solide exp\u00e9rience lui permet de vous apporter des solutions pratiques, cr\u00e9atives et innovantes, en tenant compte de votre secteur d\u2019activit\u00e9 et de votre environnement pluriculturel. Ma\u00eetre KOHEN a d\u00e9velopp\u00e9 une expertise singuli\u00e8re en droit immobilier et en droit commercial, au service d\u2019une client\u00e8le de particuliers et de professionnels. Contactez le cabinet pour b\u00e9n\u00e9ficier de son expertise et de son accompagnement personnalis\u00e9.\",\"sameAs\":[\"http:\\\/\\\/kohenavocats.fr\"],\"url\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/author\\\/kohenavocat0507bfbd32\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Buying a Watermill in France: How to Check the Water Rights Before You Sign","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/kohenavocats.fr\/en\/2026\/11\/28\/buying-watermill-france-check-water-rights\/","og_locale":"en_US","og_type":"article","og_title":"Buying a Watermill in France: How to Check the Water Rights Before You Sign","og_description":"Buying a watermill in France? How to check that the mill's water right (droit fond\u00e9 en titre) still exists and what it covers, how ruin, change of use or an old renunciation ends it, who owns the mill race, and the owner's duties and remedies after completion.","og_url":"https:\/\/kohenavocats.fr\/en\/2026\/11\/28\/buying-watermill-france-check-water-rights\/","og_site_name":"Reda KOHEN","article_published_time":"2026-11-28T20:53:35+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/kohenavocats.fr\/wp-content\/uploads\/2025\/10\/DSC00546-1024x683.jpg","type":"image\/jpeg"}],"author":"Ma\u00eetre Reda Kohen","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Ma\u00eetre Reda Kohen","Est. reading time":"31 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/kohenavocats.fr\/en\/2026\/11\/28\/buying-watermill-france-check-water-rights\/#article","isPartOf":{"@id":"https:\/\/kohenavocats.fr\/en\/2026\/11\/28\/buying-watermill-france-check-water-rights\/"},"author":{"name":"Ma\u00eetre Reda Kohen","@id":"https:\/\/kohenavocats.fr\/en\/#\/schema\/person\/9aa9e0277e7db97c71478d042a254eda"},"headline":"Buying a Watermill in France: How to Check the Water Rights Before You Sign","datePublished":"2026-11-28T20:53:35+00:00","mainEntityOfPage":{"@id":"https:\/\/kohenavocats.fr\/en\/2026\/11\/28\/buying-watermill-france-check-water-rights\/"},"wordCount":6336,"publisher":{"@id":"https:\/\/kohenavocats.fr\/en\/#organization"},"image":{"@id":"https:\/\/kohenavocats.fr\/en\/2026\/11\/28\/buying-watermill-france-check-water-rights\/#primaryimage"},"thumbnailUrl":"https:\/\/kohenavocats.fr\/wp-content\/uploads\/2024\/11\/planet-volumes-3eXgkMpE-pQ-unsplash-scaled.webp","articleSection":["D\u00e9cryptage","French real estate law"],"inLanguage":"en-US","citation":"Buying a Watermill in France: How to Check the Water Rights Before You Sign","about":[{"@type":"Thing","name":"D\u00e9cryptage"},{"@type":"Thing","name":"French real estate law"}],"dateModified":"2026-11-28T20:53:35+00:00","speakable":{"@type":"SpeakableSpecification","cssSelector":[".article-content > p:first-of-type"]}},{"@type":"WebPage","@id":"https:\/\/kohenavocats.fr\/en\/2026\/11\/28\/buying-watermill-france-check-water-rights\/","url":"https:\/\/kohenavocats.fr\/en\/2026\/11\/28\/buying-watermill-france-check-water-rights\/","name":"Buying a Watermill in France: How to Check the Water Rights Before You Sign","isPartOf":{"@id":"https:\/\/kohenavocats.fr\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/kohenavocats.fr\/en\/2026\/11\/28\/buying-watermill-france-check-water-rights\/#primaryimage"},"image":{"@id":"https:\/\/kohenavocats.fr\/en\/2026\/11\/28\/buying-watermill-france-check-water-rights\/#primaryimage"},"thumbnailUrl":"https:\/\/kohenavocats.fr\/wp-content\/uploads\/2024\/11\/planet-volumes-3eXgkMpE-pQ-unsplash-scaled.webp","datePublished":"2026-11-28T20:53:35+00:00","breadcrumb":{"@id":"https:\/\/kohenavocats.fr\/en\/2026\/11\/28\/buying-watermill-france-check-water-rights\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/kohenavocats.fr\/en\/2026\/11\/28\/buying-watermill-france-check-water-rights\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/kohenavocats.fr\/en\/2026\/11\/28\/buying-watermill-france-check-water-rights\/#primaryimage","url":"https:\/\/kohenavocats.fr\/wp-content\/uploads\/2024\/11\/planet-volumes-3eXgkMpE-pQ-unsplash-scaled.webp","contentUrl":"https:\/\/kohenavocats.fr\/wp-content\/uploads\/2024\/11\/planet-volumes-3eXgkMpE-pQ-unsplash-scaled.webp","width":2200,"height":3500},{"@type":"BreadcrumbList","@id":"https:\/\/kohenavocats.fr\/en\/2026\/11\/28\/buying-watermill-france-check-water-rights\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/kohenavocats.fr\/en\/"},{"@type":"ListItem","position":2,"name":"Buying a Watermill in France: How to Check the Water Rights Before You Sign"}]},{"@type":"WebSite","@id":"https:\/\/kohenavocats.fr\/en\/#website","url":"https:\/\/kohenavocats.fr\/en\/","name":"Reda KOHEN","description":"Ma\u00eetre Reda Kohen, attorney specialized in real estate and business law in Paris, advises and assists companies and individuals in their real estate, commercial and contractual transactions. He also handles real estate litigation and the resolution of complex commercial disputes.","publisher":{"@id":"https:\/\/kohenavocats.fr\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/kohenavocats.fr\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/kohenavocats.fr\/en\/#organization","name":"Reda KOHEN","url":"https:\/\/kohenavocats.fr\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/kohenavocats.fr\/en\/#\/schema\/logo\/image\/","url":"https:\/\/kohenavocats.fr\/wp-content\/uploads\/2024\/05\/Logo-2-1.webp","contentUrl":"https:\/\/kohenavocats.fr\/wp-content\/uploads\/2024\/05\/Logo-2-1.webp","width":2114,"height":1253,"caption":"Reda KOHEN"},"image":{"@id":"https:\/\/kohenavocats.fr\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/kohenavocats.fr\/en\/#\/schema\/person\/9aa9e0277e7db97c71478d042a254eda","name":"Ma\u00eetre Reda Kohen","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/0e11b8d1254304dff2a862995dd5cab90bf77e3eb2ea128133e9cb39ecb7ed23?s=96&d=identicon&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/0e11b8d1254304dff2a862995dd5cab90bf77e3eb2ea128133e9cb39ecb7ed23?s=96&d=identicon&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0e11b8d1254304dff2a862995dd5cab90bf77e3eb2ea128133e9cb39ecb7ed23?s=96&d=identicon&r=g","caption":"Ma\u00eetre Reda Kohen"},"description":"Avocat expert en droit immobilier et droit commercial, Ma\u00eetre KOHEN est dipl\u00f4m\u00e9 d\u2019un Master 2 en droit des affaires sp\u00e9cialis\u00e9 en droit des contrats et droit des entreprises, dipl\u00f4me qu\u2019il a obtenu avec mention. Avant de pr\u00eater serment, il a \u00e9t\u00e9 form\u00e9 dans des grands cabinets internationaux de renom : Fidal, Veil Jourde et Bird &amp; Bird. Cette solide exp\u00e9rience lui permet de vous apporter des solutions pratiques, cr\u00e9atives et innovantes, en tenant compte de votre secteur d\u2019activit\u00e9 et de votre environnement pluriculturel. Ma\u00eetre KOHEN a d\u00e9velopp\u00e9 une expertise singuli\u00e8re en droit immobilier et en droit commercial, au service d\u2019une client\u00e8le de particuliers et de professionnels. Contactez le cabinet pour b\u00e9n\u00e9ficier de son expertise et de son accompagnement personnalis\u00e9.","sameAs":["http:\/\/kohenavocats.fr"],"url":"https:\/\/kohenavocats.fr\/en\/author\/kohenavocat0507bfbd32\/"}]}},"_links":{"self":[{"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/posts\/2183600","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/users\/251031307"}],"replies":[{"embeddable":true,"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/comments?post=2183600"}],"version-history":[{"count":0,"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/posts\/2183600\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/media\/16341"}],"wp:attachment":[{"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/media?parent=2183600"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/categories?post=2183600"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/tags?post=2183600"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}