{"id":2150877,"date":"2026-10-18T00:02:58","date_gmt":"2026-10-17T22:02:58","guid":{"rendered":"https:\/\/kohenavocats.fr\/2026\/10\/18\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\/"},"modified":"2026-10-18T00:02:58","modified_gmt":"2026-10-17T22:02:58","slug":"british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit","status":"publish","type":"post","link":"https:\/\/kohenavocats.fr\/en\/2026\/10\/18\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\/","title":{"rendered":"British Second Home, French Builder Gone Quiet After Brexit: Abandoned Works, Defective Renovation, the Guarantees That Protect You and How to Challenge"},"content":{"rendered":"<p>You bought the stone farmhouse near Sarlat after years of dreaming about it. The British conveyancing was the easy part. The French renovation was supposed to take five months: a new roof, a rewired interior, a damp-proofed cellar. You paid a deposit of 40 per cent, the scaffolding went up, the roof came off, and then the builder stopped answering his telephone. Three weeks pass. Then six. The scaffolding company starts charging weekly hire. Rain gets into the open roof. From London, Manchester or Edinburgh, you feel powerless: the contract is in French, the builder is in France, and since Brexit you are a third-country owner who cannot simply drive down tomorrow to bang on his door.<\/p>\n<p>This article is written for that British owner. It explains, in English with every French legal term translated at first use, what French law gives you when a builder abandons your site or delivers defective works, and how you force him to finish, to pay, or to face a judge. French construction law is unusually protective of the project owner, known as the <em>ma&icirc;tre de l&#8217;ouvrage<\/em>, but that protection depends on formal steps taken in the right order: a formal notice called a <em>mise en demeure<\/em>, a bailiff&#8217;s report called a <em>constat<\/em>, a court-ordered expert inspection, and, above all, a document called the <em>r&eacute;ception<\/em>, the formal acceptance of the works, which starts the clock on every guarantee. Part I deals with the builder who walks away. Part II deals with works that are finished but defective, and the one-year, two-year and ten-year guarantees that apply. If you hold the house through a family property company, note that major works usually require a collective decision of the shareholders; the mechanics of that vehicle are described in <a href=\"https:\/\/kohenavocats.fr\/en\/2026\/10\/15\/british-family-sci-france-buy-tax-succession-challenge-brexit\/\">our guide to the French SCI for British families<\/a>.<\/p>\n<h2>I. Your French builder has stopped coming: forcing completion or ending the contract<\/h2>\n<h3>A. Proving the walk-off: the formal notice, the bailiff&#8217;s report and the court-appointed expert<\/h3>\n<p>French practice draws a sharp line between a temporary stoppage and a genuine abandonment of the site, known as <em>abandon de chantier<\/em>. The consumer authority describes abandonment as an unjustified interruption combined with an abnormally long duration of the stoppage, and it warns that a short justified pause, for ordered materials or bad weather, is not abandonment. That distinction matters because everything you do next must prove that the builder left without reason and stayed away. From the United Kingdom, your first reflex should be to build a paper file: the signed <em>devis<\/em>, the detailed written quote that usually serves as the contract, every invoice, every bank transfer slip, every text message and email, dated photographs of the site, and the scaffolding hire invoices that show your loss growing by the week.<\/p>\n<p>The decisive first legal step is the <em>mise en demeure<\/em>, the formal notice to perform. This is not an angry telephone call and not an ordinary email. It is a written demand, sent by registered letter with acknowledgement of receipt or served by a <em>commissaire de justice<\/em>, the court officer formerly called <em>huissier de justice<\/em>, ordering the builder to return to the site and complete the works within a stated reasonable time. For sums of money, article 1344 of the Civil Code states the rule on form: &#8220;Le d&eacute;biteur est mis en demeure de payer soit par une sommation ou un acte portant interpellation suffisante, soit, si le contrat le pr&eacute;voit, par la seule exigibilit&eacute; de l&#8217;obligation.&#8221; (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000032042162\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000032042162\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article 1344, Code civil<\/a>). In plain English: the debtor is put on formal notice either by a bailiff&#8217;s summons or any act amounting to a sufficient demand, or, where the contract so provides, by the mere fact that the obligation has fallen due. Your notice should therefore demand both the return to site and the payment of any sums already due, such as contractual late penalties, and it should state a clear deadline. Keep the acknowledgement slip: a judge will ask for it.<\/p>\n<p>Second, have the state of the site recorded by an independent officer. A <em>constat<\/em> drawn up by a <em>commissaire de justice<\/em> photographs and describes, with legal authority, what has been done, what has not, which materials are on site and which defects are already visible. If you cannot travel, a French lawyer can instruct the officer for you. Third, consider asking the court for an expert before any full trial. Article 145 of the Code of Civil Procedure provides: &#8220;S&#8217;il existe un motif l&eacute;gitime de conserver ou d&#8217;&eacute;tablir avant tout proc&egrave;s la preuve de faits dont pourrait d&eacute;pendre la solution d&#8217;un litige, les mesures d&#8217;instruction l&eacute;galement admissibles peuvent &ecirc;tre ordonn&eacute;es &agrave; la demande de tout int&eacute;ress&eacute;, sur requ&ecirc;te ou en r&eacute;f&eacute;r&eacute;.&#8221; (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000051869339\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000051869339\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article 145, Code de proc&eacute;dure civile<\/a>). In plain English: where there is a legitimate reason to preserve or establish, before any trial, proof of facts on which the outcome of a dispute could depend, legally admissible investigative measures can be ordered at the request of any interested person, on petition or in urgent interim proceedings. This <em>expertise judiciaire<\/em>, the court-appointed expert inspection, is the backbone of most French building disputes: the expert visits, hears both sides, quantifies the unfinished work and the defects, and his report usually drives the settlement or the judgment. Apply for it quickly, before rain or a replacement builder alters the site.<\/p>\n<p>Two practical warnings complete this first stage. If you borrowed money to finance the works, do not stop repaying the loan on your own initiative: the consumer authority states expressly that you cannot decide to stop repayment, although you can ask a judge to suspend the loan while the dispute lasts (<a href=\"https:\/\/www.economie.gouv.fr\/dgccrf\/les-fiches-pratiques\/abandon-de-chantier-quels-sont-vos-recours\">DGCCRF, abandon de chantier : quels sont vos recours<\/a>). And file a report with the DGCCRF, the French competition, consumer and fraud authority, and with the <em>chambre de m&eacute;tiers<\/em> if the builder is registered as an artisan: an administrative trail of complaints strengthens your file and sometimes prompts the builder to return.<\/p>\n<h3>B. Ending the contract, recovering your deposit and making delay cost the builder money<\/h3>\n<p>If the formal notice expires and the site stays empty, you face a choice: force performance or end the contract, which French law calls <em>r&eacute;solution<\/em>. Forcing a reluctant builder back is rarely wise; ending the contract and hiring a serious firm to finish is usually the faster route to a watertight roof. French law allows you to terminate by simple notification, at your own risk, without going to court first. Article 1226 of the Civil Code states: &#8220;Le cr&eacute;ancier peut, &agrave; ses risques et p&eacute;rils, r&eacute;soudre le contrat par voie de notification. Sauf urgence, il doit pr&eacute;alablement mettre en demeure le d&eacute;biteur d&eacute;faillant de satisfaire &agrave; son engagement dans un d&eacute;lai raisonnable.&#8221; (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000032041472\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000032041472\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article 1226, Code civil<\/a>). In plain English: the creditor may, at his own risk, terminate the contract by notification; except in urgent cases, he must first formally require the defaulting debtor to perform within a reasonable time. The same article adds that the formal notice must state expressly that if the debtor fails to perform, the creditor will be entitled to terminate, and that once non-performance persists, the creditor notifies the debtor of the termination with reasons, while the debtor may always challenge it before a judge. Your termination letter must therefore follow the earlier <em>mise en demeure<\/em>, repeat the deadline, and spell out that termination will follow. Article 1224 confirms the mechanism: &#8220;La r&eacute;solution r&eacute;sulte soit de l&#8217;application d&#8217;une clause r&eacute;solutoire soit, en cas d&#8217;inex&eacute;cution suffisamment grave, d&#8217;une notification du cr&eacute;ancier au d&eacute;biteur ou d&#8217;une d&eacute;cision de justice.&#8221; (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000032041482\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000032041482\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article 1224, Code civil<\/a>). In plain English: termination results either from a termination clause or, where non-performance is sufficiently serious, from a notification by the creditor to the debtor or from a court decision. An abandoned half-roofed house with rain coming in will normally meet the test of sufficiently serious non-performance, but the assessment belongs to the judge if the builder disputes it, so keep every proof of the abandonment and its consequences.<\/p>\n<p>Termination opens three financial claims. First, the deposit. Many British owners pay 30 or 40 per cent upfront and fear it is lost. Where you contracted as a private individual with a professional for your own home, you are a consumer, and consumer law treats advance sums as <em>arrhes<\/em>, a deposit that either side can forfeit or must double. Article L214-1 of the Consumer Code provides: &#8220;Sauf stipulation contraire, pour tout contrat de vente ou de prestation de services conclu entre un professionnel et un consommateur, les sommes vers&eacute;es d&#8217;avance sont des arrhes&#8221; (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000032226990\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000032226990\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article L214-1, Code de la consommation<\/a>). And the same article draws the consequence: &#8220;Dans ce cas, chacun des contractants peut revenir sur son engagement, le consommateur en perdant les arrhes, le professionnel en les restituant au double.&#8221; In plain English: each party may withdraw, the consumer by losing the deposit, the professional by returning double. Read your <em>devis<\/em> first, because the parties can agree otherwise, but by default a builder who walks away must return twice what you paid upfront, which is a powerful lever in settlement talks.<\/p>\n<p>Second, delay penalties. Most French building quotes include <em>p&eacute;nalit&eacute;s de retard<\/em>, a daily sum for each day of delay, often around a fraction of the contract price per day. Article 1231-5 of the Civil Code states: &#8220;Lorsque le contrat stipule que celui qui manquera de l&#8217;ex&eacute;cuter paiera une certaine somme &agrave; titre de dommages et int&eacute;r&ecirc;ts, il ne peut &ecirc;tre allou&eacute; &agrave; l&#8217;autre partie une somme plus forte ni moindre.&#8221; (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000032010131\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000032010131\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article 1231-5, Code civil<\/a>). In plain English: where the contract provides that the party who fails to perform will pay a fixed sum as damages, the other party can be awarded neither more nor less. The same article lets the judge reduce or increase the penalty where it is clearly excessive or derisory, and it adds a condition owners often miss: &#8220;Sauf inex&eacute;cution d&eacute;finitive, la p&eacute;nalit&eacute; n&#8217;est encourue que lorsque le d&eacute;biteur est mis en demeure.&#8221; Penalties are only due once the debtor has been formally put on notice, unless performance has become definitively impossible. Your <em>mise en demeure<\/em> therefore does double duty: it starts the penalty clock as well as preparing termination. Third, the extra cost of completion. Have the replacement firm&#8217;s quote and the expert&#8217;s quantification ready, because the difference between what the first builder should have done for the agreed price and what finishing actually costs is recoverable as damages before the <em>tribunal judiciaire<\/em>, the general civil court with jurisdiction over building disputes. The consumer authority notes that this court hears these cases and that representation by a lawyer is compulsory for claims above 10,000 euros (<a href=\"https:\/\/www.economie.gouv.fr\/dgccrf\/les-fiches-pratiques\/abandon-de-chantier-quels-sont-vos-recours\">DGCCRF, abandon de chantier : quels sont vos recours<\/a>).<\/p>\n<p>One deadline governs all of this. Contract claims in France are subject to a five-year limitation period. Article 2224 of the Civil Code provides: &#8220;Les actions personnelles ou mobili&egrave;res se prescrivent par cinq ans &agrave; compter du jour o&ugrave; le titulaire d&#8217;un droit a connu ou aurait d&ucirc; conna&icirc;tre les faits lui permettant de l&#8217;exercer.&#8221; (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000019017112\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000019017112\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article 2224, Code civil<\/a>). In plain English: personal and movable actions are time-barred after five years from the day the holder of the right knew or should have known the facts allowing him to act. Five years seems long, but evidence fades, builders go insolvent and memories blur, so instruct the expert and issue proceedings early rather than negotiating for years from abroad.<\/p>\n<h2>II. The works are finished but defective: the three French building guarantees<\/h2>\n<h3>A. The one- and two-year guarantees, and why accepting the works changes everything<\/h3>\n<p>Many British owners first meet French construction law at the worst possible moment: standing in a newly rendered living room, balance cheque in hand, being asked to sign the <em>proc&egrave;s-verbal de r&eacute;ception<\/em>, the written record of acceptance. French law gives that signature enormous consequences, because the <em>r&eacute;ception<\/em> is the starting point of every guarantee. Article 1792-6 of the Civil Code defines it: &#8220;La r&eacute;ception est l&#8217;acte par lequel le ma&icirc;tre de l&#8217;ouvrage d&eacute;clare accepter l&#8217;ouvrage avec ou sans r&eacute;serves.&#8221; (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006443552\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006443552\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article 1792-6, Code civil<\/a>). In plain English: acceptance is the act by which the project owner declares that he accepts the works, with or without reservations. The article adds that acceptance takes place at the request of the more diligent party, amicably or failing that through the courts, and that it is in all cases ordered adversarially, meaning both sides present. Never sign this document alone, under pressure, on the day, without walking the site room by room: every visible defect, every deviation from the quote, every unfinished corner must be written down as a <em>r&eacute;serve<\/em>, a reservation, because reservations made at acceptance are the easiest claims you will ever bring.<\/p>\n<p>Acceptance triggers the first guarantee, the <em>garantie de parfait ach&egrave;vement<\/em>, the one-year perfect-completion guarantee. The same article 1792-6 provides: &#8220;La garantie de parfait ach&egrave;vement, &agrave; laquelle l&#8217;entrepreneur est tenu pendant un d&eacute;lai d&#8217;un an, &agrave; compter de la r&eacute;ception, s&#8217;&eacute;tend &agrave; la r&eacute;paration de tous les d&eacute;sordres signal&eacute;s par le ma&icirc;tre de l&#8217;ouvrage, soit au moyen de r&eacute;serves mentionn&eacute;es au proc&egrave;s-verbal de r&eacute;ception, soit par voie de notification &eacute;crite pour ceux r&eacute;v&eacute;l&eacute;s post&eacute;rieurement &agrave; la r&eacute;ception.&#8221; (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006443552\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006443552\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article 1792-6, Code civil<\/a>). In plain English: the perfect-completion guarantee, owed by the builder for one year from acceptance, covers the repair of every defect reported by the owner, whether through reservations in the acceptance record or by written notice for defects appearing after acceptance. This is the broadest guarantee: it covers everything except normal wear and tear, and it obliges the builder himself to come back and repair. If he refuses after a formal notice, the article allows the works to be carried out at his expense and risk. A crack in the render noticed in month three, a door that no longer closes in month eight: write, with photographs, by letter, and keep proof of sending.<\/p>\n<p>The second guarantee, the <em>garantie biennale<\/em> or two-year guarantee of proper functioning, covers the equipment elements that can be separated from the building without damage: shutters, taps, boilers, electrical fittings, sanitary ware. Article 1792-3 of the Civil Code states: &#8220;Les autres &eacute;l&eacute;ments d&#8217;&eacute;quipement de l&#8217;ouvrage font l&#8217;objet d&#8217;une garantie de bon fonctionnement d&#8217;une dur&eacute;e minimale de deux ans &agrave; compter de sa r&eacute;ception.&#8221; (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006443534\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006443534\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article 1792-3, Code civil<\/a>). In plain English: the other equipment elements of the building are covered by a guarantee of proper functioning lasting at least two years from acceptance. The boiler that dies in its second winter and the electrically operated shutters that jam are textbook two-year claims. Note the phrase &#8220;at least&#8221;: your contract can extend the period, so check the <em>devis<\/em> and the general conditions before assuming the guarantee has expired.<\/p>\n<p>Here lies the trap that catches British owners more than any other. French courts accept that you can take possession and pay without any signed acceptance document, and still be deemed to have accepted the works tacitly, which lawyers call <em>r&eacute;ception tacite<\/em>. The Court of Cassation, the supreme civil court, held in a published ruling of 30 January 2019: &#8220;l&#8217;ach&egrave;vement de la totalit&eacute; de l&#8217;ouvrage n&#8217;est pas une condition de la prise de possession d&#8217;un lot et de sa r&eacute;ception&#8221; (<a href=\"https:\/\/www.courdecassation.fr\/decision\/5fca797db65b4267968f32b4\">Cass. 3e civ., 30 janv. 2019, n&deg; 18-10.197, publi&eacute; au Bulletin<\/a>). In plain English: completion of the whole building is not a precondition for taking possession of one trade&#8217;s lot and accepting it. The same ruling adds: &#8220;le paiement de l&#8217;int&eacute;gralit&eacute; des travaux d&#8217;un lot et sa prise de possession par le ma&icirc;tre de l&#8217;ouvrage valent pr&eacute;somption de r&eacute;ception tacite&#8221; In plain English: payment in full for a lot&#8217;s works combined with taking possession creates a presumption of tacit acceptance. A later published ruling restated the test applied by the courts: &#8220;la r&eacute;ception tacite est caract&eacute;ris&eacute;e lorsque le ma&icirc;tre d&#8217;ouvrage manifeste sans &eacute;quivoque sa volont&eacute; de recevoir l&#8217;ouvrage&#8221; (<a href=\"https:\/\/www.courdecassation.fr\/decision\/5fca28ccc8c4b77eec00da3c\">Cass. 3e civ., 12 nov. 2020, n&deg; 19-18.213, publi&eacute; au Bulletin<\/a>). In plain English: tacit acceptance is established where the owner unequivocally shows his intention to accept the works. Whenever moving in and paying the balance happen weeks apart, record both dates in writing, because the starting date of your guarantees can then be disputed. And a 2021 published ruling restated the principle: &#8220;En application de l&#8217;article 1792-6 du code civil, la prise de possession de l&#8217;ouvrage et le paiement des travaux font pr&eacute;sumer la volont&eacute; non &eacute;quivoque du ma&icirc;tre de l&#8217;ouvrage de le recevoir avec ou sans r&eacute;serves.&#8221; (<a href=\"https:\/\/www.courdecassation.fr\/decision\/607dde49bdd797b53ae6e181\">Cass. 3e civ., 1er avr. 2021, n&deg; 19-25.563, publi&eacute; au Bulletin<\/a>). In plain English: taking possession and paying for the works give rise to a presumption that the owner unequivocally intended to accept them, with or without reservations. The practical lesson is blunt: if you collect the keys, move furniture in and pay the final balance, a French court can hold that you accepted the works on that date, starting the one-year and two-year clocks and weakening later complaints about visible defects you failed to reserve. Pay the balance only against a contradictory acceptance visit with written reservations, and bring an independent surveyor or architect to that visit.<\/p>\n<h3>B. The ten-year structural guarantee and the two insurance policies that make it real<\/h3>\n<p>The third guarantee is the famous <em>garantie d&eacute;cennale<\/em>, the ten-year guarantee, and it is the one that protects the value of your house. Article 1792 of the Civil Code provides: &#8220;Tout constructeur d&#8217;un ouvrage est responsable de plein droit, envers le ma&icirc;tre ou l&#8217;acqu&eacute;reur de l&#8217;ouvrage, des dommages, m&ecirc;me r&eacute;sultant d&#8217;un vice du sol, qui compromettent la solidit&eacute; de l&#8217;ouvrage ou qui, l&#8217;affectant dans l&#8217;un de ses &eacute;l&eacute;ments constitutifs ou l&#8217;un de ses &eacute;l&eacute;ments d&#8217;&eacute;quipement, le rendent impropre &agrave; sa destination.&#8221; (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006443502\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006443502\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article 1792, Code civil<\/a>). In plain English: every builder is strictly liable to the project owner or buyer for damage, even caused by ground defects, that threatens the solidity of the building or, affecting a structural or equipment element, makes it unfit for its purpose. Liability is automatic: you prove the serious damage, not the builder&#8217;s fault, and even ground conditions are no excuse unless the builder proves an outside cause. Subsidence cracking the walls, a roof frame that sags, waterproofing failures that make rooms unusable: these are ten-year cases. The ten-year period runs from acceptance, and article 1792-4-1 of the Civil Code provides: &#8220;Toute personne physique ou morale dont la responsabilit&eacute; peut &ecirc;tre engag&eacute;e en vertu des articles 1792 &agrave; 1792-4 du pr&eacute;sent code est d&eacute;charg&eacute;e des responsabilit&eacute;s et garanties pesant sur elle, en application des articles 1792 &agrave; 1792-2, apr&egrave;s dix ans &agrave; compter de la r&eacute;ception des travaux ou, en application de l&#8217;article 1792-3 , &agrave; l&#8217;expiration du d&eacute;lai vis&eacute; &agrave; cet article.&#8221; (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000019017055\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000019017055\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article 1792-4-1, Code civil<\/a>). In plain English: any person whose liability can arise under these articles is discharged ten years after acceptance of the works, or on expiry of the two-year period for equipment elements. Act within the period: once the tenth anniversary of acceptance passes, the guarantee is gone.<\/p>\n<p>A guarantee is only as good as the insurer behind it, and French law makes insurance compulsory on both sides. On the builder&#8217;s side, article L241-1 of the Insurance Code provides: &#8220;Toute personne physique ou morale, dont la responsabilit&eacute; d&eacute;cennale peut &ecirc;tre engag&eacute;e sur le fondement de la pr&eacute;somption &eacute;tablie par les articles 1792 et suivants du code civil, doit &ecirc;tre couverte par une assurance.&#8221; (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000031010281\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000031010281\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article L241-1, Code des assurances<\/a>). In plain English: every person whose ten-year liability can arise under the presumption of the Civil Code must carry insurance. The same article adds: &#8220;A l&#8217;ouverture de tout chantier, elle doit justifier qu&#8217;elle a souscrit un contrat d&#8217;assurance la couvrant pour cette responsabilit&eacute;.&#8221; Every builder must prove, when the site opens, that he holds a policy covering that liability. Before any British owner signs a French quote, demand the <em>attestation d&#8217;assurance d&eacute;cennale<\/em>, the ten-year insurance certificate, check that it covers the year the site opens and the exact nature of the works, and telephone the insurer to confirm the policy is current. Uninsured builders are the classic source of worthless judgments: French courts are full of owners who won against a builder with no assets and no insurer. If your builder cannot produce a certificate, walk away, however attractive the price.<\/p>\n<p>On your side as owner, French law imposes a second policy that most British buyers have never heard of: the <em>assurance dommages-ouvrage<\/em>, the project-owner&#8217;s damage insurance. Article L242-1 of the Insurance Code provides: &#8220;Toute personne physique ou morale qui, agissant en qualit&eacute; de propri&eacute;taire de l&#8217;ouvrage, de vendeur ou de mandataire du propri&eacute;taire de l&#8217;ouvrage, fait r&eacute;aliser des travaux de construction, doit souscrire avant l&#8217;ouverture du chantier, pour son compte ou pour celui des propri&eacute;taires successifs, une assurance garantissant, en dehors de toute recherche des responsabilit&eacute;s, le paiement de la totalit&eacute; des travaux de r&eacute;paration des dommages de la nature de ceux dont sont responsables les constructeurs au sens de l&#8217;article 1792-1&#8221;. (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000019265425\" class=\"kohen-legifrance-popup-link\" data-kohen-legifrance-url=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000019265425\" data-kohen-legifrance-title=\"Texte officiel Legifrance\" target=\"_blank\" rel=\"noopener\">Article L242-1, Code des assurances<\/a>). In plain English: any owner, seller or agent having construction works carried out must take out, before the site opens, insurance guaranteeing, without any search for who is at fault, the payment of all repair works for damage of the kind builders are liable for. This policy pref finances your repairs without waiting years for a court to apportion blame between builder, architect and trades, and it follows the house to future buyers. Its procedure runs to strict deadlines stated in the same article: &#8220;L&#8217;assureur a un d&eacute;lai maximal de soixante jours, courant &agrave; compter de la r&eacute;ception de la d&eacute;claration du sinistre, pour notifier &agrave; l&#8217;assur&eacute; sa d&eacute;cision quant au principe de la mise en jeu des garanties pr&eacute;vues au contrat.&#8221; The insurer has at most sixty days from receiving the claim to state whether cover applies. Then, where cover applies, &#8220;l&#8217;assureur pr&eacute;sente, dans un d&eacute;lai maximal de quatre-vingt-dix jours, courant &agrave; compter de la r&eacute;ception de la d&eacute;claration du sinistre, une offre d&#8217;indemnit&eacute;&#8221;, a compensation offer within ninety days, &#8220;En cas d&#8217;acceptation, par l&#8217;assur&eacute;, de l&#8217;offre qui lui a &eacute;t&eacute; faite, le r&egrave;glement de l&#8217;indemnit&eacute; par l&#8217;assureur intervient dans un d&eacute;lai de quinze jours&#8221; after you accept it. Declare serious damage to this insurer immediately and in writing, because these sixty, ninety and fifteen-day periods run from receipt of your declaration. One boundary is worth knowing for renovation projects: the Court of Cassation held in a published 2024 ruling that compulsory cover for damage to a pre-existing building caused by erecting a new structure applies only where the two are technically indivisible and that indivisibility comes from the total incorporation of the old into the new, the two conditions being cumulative: &#8220;Il en r&eacute;sulte que l&#8217;assurance obligatoire ne garantit les dommages &agrave; l&#8217;ouvrage existant provoqu&eacute;s par la construction d&#8217;un ouvrage neuf que dans le cas d&#8217;une indivisibilit&eacute; technique des deux ouvrages et si celle-ci proc&egrave;de de l&#8217;incorporation totale de l&#8217;existant dans le neuf.&#8221; (<a href=\"https:\/\/www.courdecassation.fr\/decision\/665816e3e1d75d00084fd873\">Cass. 3e civ., 30 mai 2024, n&deg; 22-20.711, publi&eacute; au Bulletin<\/a>). An extension that merely leans against the old farmhouse may fall outside compulsory cover, which is one more reason to have both policies checked by a professional before works start.<\/p>\n<h2>Conclusion<\/h2>\n<p>A French builder who disappears or delivers defective work is not the end of your Dordogne dream; it is the start of a formal process that French law has refined over decades. Put the builder on formal notice and build your proof with a bailiff&#8217;s report and, where needed, a court-appointed expert. End the contract cleanly by notification if the site stays empty, recover advance payments under the deposit rules, and let contractual delay penalties run from the formal notice. At acceptance, inspect contradictorily, write down every reservation, and never let keys and final payment silently become tacit acceptance. Then use the guarantees in order: one year for every defect, two years for equipment, ten years for structural damage, backed by the builder&#8217;s compulsory insurance and your own project-owner policy declared promptly. Distance since Brexit makes each of these steps harder, which is exactly why each of them should be taken early, in writing, and with proof of sending.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Your French builder has stopped coming or the renovation is defective. This English-language guide explains the formal notice, contract termination, deposit recovery, and the one-year, two-year and ten-year French building guarantees with the insurance that backs them.<\/p>\n","protected":false},"author":251031309,"featured_media":16515,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_kj_source_type":"","_kj_official_id":"","_kj_official_url":"","_kj_judilibre_id":"","_kj_jur":"","_kj_lieu":"","_kj_chambre":"","_kj_rg":"","_kj_date":"","activitypub_content_warning":"","activitypub_content_visibility":"","activitypub_max_image_attachments":4,"activitypub_interaction_policy_quote":"anyone","activitypub_status":"federated","footnotes":""},"categories":[80312,80314],"tags":[],"class_list":["post-2150877","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-british-desk","category-decryptage"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.2 (Yoast SEO v28.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>British Second Home, French Builder Gone Quiet After Brexit: Abandoned Works, Defective Renovation, the Guarantees That Protect You and How to Challenge - Ma\u00eetre Reda Kohen, Real Estate and Business Law Attorney in Paris<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/kohenavocats.fr\/en\/2026\/10\/18\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"British Second Home, French Builder Gone Quiet After Brexit: Abandoned Works, Defective Renovation, the Guarantees That Protect You and How to Challenge\" \/>\n<meta property=\"og:description\" content=\"Your French builder has stopped coming or the renovation is defective. This English-language guide explains the formal notice, contract termination, deposit recovery, and the one-year, two-year and ten-year French building guarantees with the insurance that backs them.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/kohenavocats.fr\/en\/2026\/10\/18\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\/\" \/>\n<meta property=\"og:site_name\" content=\"Ma\u00eetre Reda Kohen, Real Estate and Business Law Attorney in Paris\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-17T22:02:58+00:00\" \/>\n<meta name=\"author\" content=\"Kohen\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Kohen\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"21 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/10\\\/18\\\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/10\\\/18\\\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\\\/\"},\"author\":{\"name\":\"Kohen\",\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/#\\\/schema\\\/person\\\/6254a643e6239d803134a01c800381bd\"},\"headline\":\"British Second Home, French Builder Gone Quiet After Brexit: Abandoned Works, Defective Renovation, the Guarantees That Protect You and How to Challenge\",\"datePublished\":\"2026-10-17T22:02:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/10\\\/18\\\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\\\/\"},\"wordCount\":4379,\"publisher\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/10\\\/18\\\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/kohenavocats.fr\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/allison-saeng-ynhGXZEH5gQ-unsplash-scaled.webp\",\"articleSection\":[\"British Desk\",\"D\u00e9cryptage\"],\"inLanguage\":\"en-US\",\"citation\":\"British Second Home, French Builder Gone Quiet After Brexit: Abandoned Works, Defective Renovation, the Guarantees That Protect You and How to Challenge\",\"about\":[{\"@type\":\"Thing\",\"name\":\"British Desk\"},{\"@type\":\"Thing\",\"name\":\"D\u00e9cryptage\"}],\"dateModified\":\"2026-10-17T22:02:58+00:00\",\"speakable\":{\"@type\":\"SpeakableSpecification\",\"cssSelector\":[\".article-content > p:first-of-type\"]}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/10\\\/18\\\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\\\/\",\"url\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/10\\\/18\\\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\\\/\",\"name\":\"British Second Home, French Builder Gone Quiet After Brexit: Abandoned Works, Defective Renovation, the Guarantees That Protect You and How to Challenge - Ma\u00eetre Reda Kohen, Real Estate and Business Law Attorney in Paris\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/10\\\/18\\\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/10\\\/18\\\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/kohenavocats.fr\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/allison-saeng-ynhGXZEH5gQ-unsplash-scaled.webp\",\"datePublished\":\"2026-10-17T22:02:58+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/10\\\/18\\\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/10\\\/18\\\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/10\\\/18\\\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\\\/#primaryimage\",\"url\":\"https:\\\/\\\/kohenavocats.fr\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/allison-saeng-ynhGXZEH5gQ-unsplash-scaled.webp\",\"contentUrl\":\"https:\\\/\\\/kohenavocats.fr\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/allison-saeng-ynhGXZEH5gQ-unsplash-scaled.webp\",\"width\":3000,\"height\":4000},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/2026\\\/10\\\/18\\\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"British Second Home, French Builder Gone Quiet After Brexit: Abandoned Works, Defective Renovation, the Guarantees That Protect You and How to Challenge\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/\",\"name\":\"Kohen Avocats\",\"description\":\"Ma\u00eetre Reda Kohen, attorney specialized in real estate and business law in Paris, advises and assists companies and individuals in their real estate, commercial and contractual transactions. He also handles real estate litigation and the resolution of complex commercial disputes.\",\"publisher\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/#organization\",\"name\":\"Kohen Avocats\",\"url\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/kohenavocats.fr\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/Logo-2-1.webp\",\"contentUrl\":\"https:\\\/\\\/kohenavocats.fr\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/Logo-2-1.webp\",\"width\":2114,\"height\":1253,\"caption\":\"Kohen Avocats\"},\"image\":{\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/#\\\/schema\\\/person\\\/6254a643e6239d803134a01c800381bd\",\"name\":\"Kohen\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1c5e76ef76bbbfdd2b4da984e2bf2fa4056fd51a27d25ce2c332047f1dfd6e00?s=96&d=identicon&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1c5e76ef76bbbfdd2b4da984e2bf2fa4056fd51a27d25ce2c332047f1dfd6e00?s=96&d=identicon&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1c5e76ef76bbbfdd2b4da984e2bf2fa4056fd51a27d25ce2c332047f1dfd6e00?s=96&d=identicon&r=g\",\"caption\":\"Kohen\"},\"url\":\"https:\\\/\\\/kohenavocats.fr\\\/en\\\/author\\\/kohenmlk\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"British Second Home, French Builder Gone Quiet After Brexit: Abandoned Works, Defective Renovation, the Guarantees That Protect You and How to Challenge - Ma\u00eetre Reda Kohen, Real Estate and Business Law Attorney in Paris","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/kohenavocats.fr\/en\/2026\/10\/18\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\/","og_locale":"en_US","og_type":"article","og_title":"British Second Home, French Builder Gone Quiet After Brexit: Abandoned Works, Defective Renovation, the Guarantees That Protect You and How to Challenge","og_description":"Your French builder has stopped coming or the renovation is defective. This English-language guide explains the formal notice, contract termination, deposit recovery, and the one-year, two-year and ten-year French building guarantees with the insurance that backs them.","og_url":"https:\/\/kohenavocats.fr\/en\/2026\/10\/18\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\/","og_site_name":"Ma\u00eetre Reda Kohen, Real Estate and Business Law Attorney in Paris","article_published_time":"2026-10-17T22:02:58+00:00","author":"Kohen","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Kohen","Est. reading time":"21 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/kohenavocats.fr\/en\/2026\/10\/18\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\/#article","isPartOf":{"@id":"https:\/\/kohenavocats.fr\/en\/2026\/10\/18\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\/"},"author":{"name":"Kohen","@id":"https:\/\/kohenavocats.fr\/en\/#\/schema\/person\/6254a643e6239d803134a01c800381bd"},"headline":"British Second Home, French Builder Gone Quiet After Brexit: Abandoned Works, Defective Renovation, the Guarantees That Protect You and How to Challenge","datePublished":"2026-10-17T22:02:58+00:00","mainEntityOfPage":{"@id":"https:\/\/kohenavocats.fr\/en\/2026\/10\/18\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\/"},"wordCount":4379,"publisher":{"@id":"https:\/\/kohenavocats.fr\/en\/#organization"},"image":{"@id":"https:\/\/kohenavocats.fr\/en\/2026\/10\/18\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\/#primaryimage"},"thumbnailUrl":"https:\/\/kohenavocats.fr\/wp-content\/uploads\/2024\/11\/allison-saeng-ynhGXZEH5gQ-unsplash-scaled.webp","articleSection":["British Desk","D\u00e9cryptage"],"inLanguage":"en-US","citation":"British Second Home, French Builder Gone Quiet After Brexit: Abandoned Works, Defective Renovation, the Guarantees That Protect You and How to Challenge","about":[{"@type":"Thing","name":"British Desk"},{"@type":"Thing","name":"D\u00e9cryptage"}],"dateModified":"2026-10-17T22:02:58+00:00","speakable":{"@type":"SpeakableSpecification","cssSelector":[".article-content > p:first-of-type"]}},{"@type":"WebPage","@id":"https:\/\/kohenavocats.fr\/en\/2026\/10\/18\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\/","url":"https:\/\/kohenavocats.fr\/en\/2026\/10\/18\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\/","name":"British Second Home, French Builder Gone Quiet After Brexit: Abandoned Works, Defective Renovation, the Guarantees That Protect You and How to Challenge - Ma\u00eetre Reda Kohen, Real Estate and Business Law Attorney in Paris","isPartOf":{"@id":"https:\/\/kohenavocats.fr\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/kohenavocats.fr\/en\/2026\/10\/18\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\/#primaryimage"},"image":{"@id":"https:\/\/kohenavocats.fr\/en\/2026\/10\/18\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\/#primaryimage"},"thumbnailUrl":"https:\/\/kohenavocats.fr\/wp-content\/uploads\/2024\/11\/allison-saeng-ynhGXZEH5gQ-unsplash-scaled.webp","datePublished":"2026-10-17T22:02:58+00:00","breadcrumb":{"@id":"https:\/\/kohenavocats.fr\/en\/2026\/10\/18\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/kohenavocats.fr\/en\/2026\/10\/18\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/kohenavocats.fr\/en\/2026\/10\/18\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\/#primaryimage","url":"https:\/\/kohenavocats.fr\/wp-content\/uploads\/2024\/11\/allison-saeng-ynhGXZEH5gQ-unsplash-scaled.webp","contentUrl":"https:\/\/kohenavocats.fr\/wp-content\/uploads\/2024\/11\/allison-saeng-ynhGXZEH5gQ-unsplash-scaled.webp","width":3000,"height":4000},{"@type":"BreadcrumbList","@id":"https:\/\/kohenavocats.fr\/en\/2026\/10\/18\/british-second-home-france-builder-abandon-defects-guarantees-challenge-brexit\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/kohenavocats.fr\/en\/"},{"@type":"ListItem","position":2,"name":"British Second Home, French Builder Gone Quiet After Brexit: Abandoned Works, Defective Renovation, the Guarantees That Protect You and How to Challenge"}]},{"@type":"WebSite","@id":"https:\/\/kohenavocats.fr\/en\/#website","url":"https:\/\/kohenavocats.fr\/en\/","name":"Kohen Avocats","description":"Ma\u00eetre Reda Kohen, attorney specialized in real estate and business law in Paris, advises and assists companies and individuals in their real estate, commercial and contractual transactions. He also handles real estate litigation and the resolution of complex commercial disputes.","publisher":{"@id":"https:\/\/kohenavocats.fr\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/kohenavocats.fr\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/kohenavocats.fr\/en\/#organization","name":"Kohen Avocats","url":"https:\/\/kohenavocats.fr\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/kohenavocats.fr\/en\/#\/schema\/logo\/image\/","url":"https:\/\/kohenavocats.fr\/wp-content\/uploads\/2024\/05\/Logo-2-1.webp","contentUrl":"https:\/\/kohenavocats.fr\/wp-content\/uploads\/2024\/05\/Logo-2-1.webp","width":2114,"height":1253,"caption":"Kohen Avocats"},"image":{"@id":"https:\/\/kohenavocats.fr\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/kohenavocats.fr\/en\/#\/schema\/person\/6254a643e6239d803134a01c800381bd","name":"Kohen","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1c5e76ef76bbbfdd2b4da984e2bf2fa4056fd51a27d25ce2c332047f1dfd6e00?s=96&d=identicon&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1c5e76ef76bbbfdd2b4da984e2bf2fa4056fd51a27d25ce2c332047f1dfd6e00?s=96&d=identicon&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1c5e76ef76bbbfdd2b4da984e2bf2fa4056fd51a27d25ce2c332047f1dfd6e00?s=96&d=identicon&r=g","caption":"Kohen"},"url":"https:\/\/kohenavocats.fr\/en\/author\/kohenmlk\/"}]}},"_links":{"self":[{"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/posts\/2150877","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/users\/251031309"}],"replies":[{"embeddable":true,"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/comments?post=2150877"}],"version-history":[{"count":0,"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/posts\/2150877\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/media\/16515"}],"wp:attachment":[{"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/media?parent=2150877"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/categories?post=2150877"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kohenavocats.fr\/en\/wp-json\/wp\/v2\/tags?post=2150877"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}